Establishment of numerous development entities like Gambia Vision 2050, that profiles the country development pathway on a comprehensive term and the coming to being of an eventual self-sufficient socio-economic society by 2050, and, more recently the National Development Plan 2023–2027 that, further reinvestment in the private sector, intensifies industrialization and economic diversification, all the while maintaining a safe investment political stability adaptable to create a quality space, and elevated infrastructure base. In incremental paces, The Gambia is becoming a regional trade, logistics, production, and agro-industrial hub, henceforth an extensive range of possible forestry, tourism, soft manufacture, renewable power, ICT etc. investment opportunities.
Entrepreneurs can tap into high-potential sectors aligned with the government’s economic diversification goals:
Market Demand
The Gambia’s economy’s gradual transformation has increased demand in various sectors:
The Gambia Investment and Export Promotion Agency (GIEPA) provides a wide range of investor incentives, including:
In light of the aforementioned detailed analysis, in a politically stable environment, arable land, a youthful population, and a strategic regional location, the focus on industrialization through the private sector, the Gambia will undoubtedly attract investment. In energy—agro-processing, fisheries, renewable energy, ICT, tourism, regional integration, and light manufacturing focus are ripe for growth under the vision 2050 framework. In sum, the Gambia is progressively becoming a hub to the West African market and a pace of sustainable and inclusive growth in the region.
Please choose a project below related to this category.
How to Start a Cashew Nut Processing Business, Cashew Processing Industry The cashew tree (Anacardium occidentale) is a tropical evergreen tree t...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Production of Bioplastic Products. Biodegradable and Bio-Plastics Products Manufacturing Business. Glasses, Plates and Bags Manufacturing Project....
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Mango Pulp is prepared from selected varieties of Fresh Mango Fruit. Fully matured Mangoes are harvested, quickly transported to the fruit processing...
|
Capacity : Mango Pulp: 32.50 MT/Day Mango Concentrate: 16.25 MT/Day |
Plant and Machinery cost: Rs 1885 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project: Rs 3232 lakhs |
|
Cost of Project : 323200000 |
Dehydrating vegetables once dehydrated, they take very little room to store. Nutrients aren’t destroyed as they are with canning. Nothing is spoiled....
|
Capacity : Dehydrated Vegetables, Mushroom & Soup: 3130 Packs/Day |
Plant and Machinery cost: Rs 102 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project: Rs 394 lakhs |
|
Cost of Project : 39400000 |
Mango Pulp is prepared from selected varieties of Fresh Mango Fruit. Fully matured Mangoes are harvested, quickly transported to the fruit processing...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Project Opportunities in Mango Pulp Processing Industry (Food & Agriculture Sector). Mango Pulp Extraction Unit with Cold Storage India is the home...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Mango is one of the most important tropical fruits in the world and currently ranked 5th in total world production among the major fruit crops. As man...
|
Capacity : Mango Pulp: 9,750 MT. per annum Mango Concentrate 4,875 MT. per annum |
Plant and Machinery cost: 1885 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project: 3232 Lakhs |
|
Cost of Project : 323200000 |
Plastics are made from limited resources such as petroleum, and huge advances are being made in the development of technologies to recycle plastic was...
|
Capacity : Plastic Granules: 2400 Kgs/Day PET Granules: 2400 Kgs/Day |
Plant and Machinery cost: 97 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : Rs 238 lakhs |
|
Cost of Project : 23800000 |
Filters containing an absorbent or catalyst such as charcoal (carbon) may also remove odors and gaseous pollutants such as volatile organic compounds...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Aam papad is an Indian fruit leather made out of mango pulp mixed with concentrated sugar solution and sun dried. It is also known as Aamta (Assamese)...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Surgical gowns are worn by doctors and nurses in the operating theater to address a dual function of preventing transfer of microorganisms and body fl...
|
Capacity : Surgeon Gowns: 250 Pcs./Day Pateint Gowns: 300 Pcs./Day Pillow Covers: 700 Pcs./Day Surgeon Caps: 1000 Pcs./Day |
Plant and Machinery cost: 204 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs 492 lakhs |
|
Cost of Project : 49200000 |
Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...
|
Capacity : Monitors: 5 Kgs /Day Plastic Granules: 2333.33 Kgs /Day Copper Wire Scraps: 13.33 Kgs /Day Glass from CRT: 133.33 Kgs /Day Other Metals: 566.67 Kgs /Day |
Plant and Machinery cost: 100 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 18.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : Rs 325 lakhs |
|
Cost of Project : 32500000 |