Best Business Opportunities in Zambia, Africa - Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship Projects

Please choose a project below related to this category.

Iron oxide
Iron oxide

Iron oxide and oxide-hydroxide are widespread in nature, play an important role in many geological and biological processes, and are widely utilized b...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Micronutrients Fertilizer for Banana, Vegetables and Citrus - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study
Micronutrients Fertilizer for Banana, Vegetables and Citrus - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study

Micronutrients are elements which are essential for plant growth, but are required in much smaller amounts than those of the primary nutrients; nitrog...

Capacity :

Micronutrients Fertilizer for Banana:500 Kgs/Day •Micronutrients Fertilizer for Vegetables:500 Kgs/Day •Micronutrients Fertilizer for Citrus: 500 Kgs/Day

Plant and Machinery cost:

Rs 7 Lakhs

Working Capital :

-

Rate of Return (ROR):

30.00

Break Even Point (BEP):

72.00

TCI :

Cost of Project:Rs 30 Lakhs

Cost of Project :

3000000

Wooden Pencils - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economic
Wooden Pencils - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economic

A pencil is lead material enclosed in wood or put in metal holder used for drawing or writing. Pencil is a valuable item used by all levels of schools...

Capacity :

Wooden Pencils 200 Gross/Day

Plant and Machinery cost:

Rs 31 Lakhs

Working Capital :

-

Rate of Return (ROR):

24.60

Break Even Point (BEP):

71.87

TCI :

Cost of Project : Rs 55 Lakhs

Cost of Project :

5500000

Plastic Waste Recycling Plant - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Plastic Waste Recycling Plant - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Waste is now a global problem, and one that must be addressed in order to solve the world's resource and energy challenges. Plastics are made from lim...

Capacity :

Plastic Granules 4500 Kgs/Day

Plant and Machinery cost:

Rs 43 Lakhs

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

64.52

TCI :

Cost of Project : Rs 219 Lakhs

Cost of Project :

21900000

Detergent Cake - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economic
Detergent Cake - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economic

Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active compound (Surfactant)...

Capacity :

4MT/Day

Plant and Machinery cost:

Rs 18 Lakhs

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

43.00

TCI :

Cost of Project:Rs 228 Lakhs

Cost of Project :

22800000

Bicycle Manufacturing - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Bicycle Manufacturing - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

A bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. A bicycle rider is cal...

Capacity :

Bicycles (Different Sizes):2000 Nos./Day

Plant and Machinery cost:

Rs 270 Lakhs

Working Capital :

-

Rate of Return (ROR):

26.39

Break Even Point (BEP):

31.24

TCI :

Cost of Project:Rs 3972 Lakhs

Cost of Project :

397200000

Automatic Packaged Drinking Water - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Plant Layout
Automatic Packaged Drinking Water - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Plant Layout

It is needless to mention that water, a compound of Hydrogen and Oxygen is a precious natural gift which is very essential for survival of mankind inc...

Capacity :

Packaged Drinking Water (1 Ltr. Size):120000

Plant and Machinery cost:

Rs 65 Lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

60.00

TCI :

Cost of Project:Rs 268 Lakhs

Cost of Project :

26800000

Detergent Cake - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economic
Detergent Cake - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economic

Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active compound (Surfactant)...

Capacity :

4MT/Day

Plant and Machinery cost:

Rs 18 Lakhs

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

43.00

TCI :

Cost of Project:Rs 228 Lakhs

Cost of Project :

22800000

Biodegradable Disposable Cups and Plates using Sugarcane Bagasse
Biodegradable Disposable Cups and Plates using Sugarcane Bagasse

Agricultural wastes constitute one of the main alternative raw materials for the pulp and paper industry. Wheat straw, bagasse, reed, and rice straw a...

Capacity :

•Disposable Paper Cups :7.5 MT/Day •Disposable Paper Plates:7.5 MT/Day

Plant and Machinery cost:

Rs 32 Lakhs

Working Capital :

-

Rate of Return (ROR):

28.18

Break Even Point (BEP):

56.37

TCI :

Cost of Project: Rs 314 Lakhs

Cost of Project :

31400000

Iron Ore Mining (E.O.U) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Iron Ore Mining (E.O.U) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

An ‘Ore’ may be defined as the aggregate of minerals from which a desired constituent mineral can be extracted with profit. The most used of all metal...

Capacity :

Iron Ore: 800 MT/Day

Plant and Machinery cost:

Rs 779 Lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

43.00

TCI :

Cost of Project: Rs 2485 Lakhs

Cost of Project :

2485

Bicycle Tubes - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics
Bicycle Tubes - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics

Bicycle tubes are the backbone of the bicycle industries. Few numbers of companies in organized sector are engaged in the quality grade cycles tyres a...

Capacity :

Bicycle Tubes: 10,000 Nos. /Day

Plant and Machinery cost:

Rs 118 Lakhs

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

45.00

TCI :

Cost of Project: Rs 622 Lakhs

Cost of Project :

62200000

Iron Powder - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics
Iron Powder - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics

Iron is probably one of the most important, being used on the largest scale of any metal. Its Production in the blast furnace is well documented. When...

Capacity :

3000 MT/Day

Plant and Machinery cost:

Rs 266 Lakhs

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

43.00

TCI :

Cost of Project: Rs 882 Lakhs

Cost of Project :

88200000

Make An Appointment

Talk to Our Experts Today!

appoinment
Call Us WhatsApp