Please choose a project below related to this category.
Profile Water forms an essential part of every human being. Since it is a human necessity it makes best sense to do business in. As a normal human b...
|
Capacity : - |
Plant and Machinery cost: 131 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : 350 Lakh |
|
Cost of Project : 35000000 |
PRODUCT PROFILE Curcumin is the principal curcuminoid of the popular Indian spice turmeric, which is a member of the ginger family. It is the main bi...
|
Capacity : 23400 Kg/Annum, Curcumin 23400 kg/Annum, Turmeric oil 550 MT/ Annum, De-oiled turmeric powder |
Plant and Machinery cost: 122 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 54.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of project: 289 Lakhs |
|
Cost of Project : 28900000 |
Coal tar is a brown or black liquid of high viscosity, which smells of naphthalene and aromatic hydro carbons. Coal tar is among the byproducts when c...
|
Capacity : - |
Plant and Machinery cost: 1531 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Cost of Project : 3068 Lakhs |
|
Cost of Project : 306800000 |
Iron ore pellets are spheres of typically 8-18mm (0.31-0.71 inch) to be used as raw material for blast furnace. They typically contain 67 to 72% Fe an...
|
Capacity : 1200000 MT/Annum |
Plant and Machinery cost: 3801 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : 6183 Lakhs |
|
Cost of Project : 0 |
Iron ore pellets are spheres of typically 8-18mm (0.31-0.71 inch) to be used as raw material for blast furnace. They typically contain 67-72% Fe and v...
|
Capacity : 1200000 MT/Annum |
Plant and Machinery cost: 3801 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : 6183 Lakhs |
|
Cost of Project : 0 |
Manganese sulphate is commercially one of the most important compounds. It is an important mineral based chemical industry. The main constituent of th...
|
Capacity : 600 MT/Annum (Manganese Sulphate) |
Plant and Machinery cost: 35 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 135 Lakhs |
|
Cost of Project : 0 |
Tyres and Tubes are the backbone of the bicycle and rickshaw. Bicycle and rickshaw continues to be the principal mode of transport for the low and mid...
|
Capacity : 300000 Nos. Tyres & 300000 Nos. Tubes |
Plant and Machinery cost: 158 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 351 Lakhs |
|
Cost of Project : 0 |
A toothpick is a small stick of wood, plastic, bamboo, metal, bone or other substance used to remove detritus from the teeth, usually after a meal. A...
|
Capacity : - |
Plant and Machinery cost: 6 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 62.00 |
TCI : 22 Lakhs |
|
Cost of Project : 0 |
Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...
|
Capacity : - |
Plant and Machinery cost: 25 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 54.00 |
TCI : 100 Lakhs |
|
Cost of Project : 0 |
Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...
|
Capacity : 3000000 Bottles/Annum |
Plant and Machinery cost: 39 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : 108 Lakhs |
|
Cost of Project : 0 |
Pigments are a group of insoluble colorants in form of finely ground solid particles that are mixed with a liquid to be applied in printing inks, oil...
|
Capacity : - |
Plant and Machinery cost: 146 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project : 507 Lakhs |
|
Cost of Project : 0 |
Manganese and silicon are crucial constituents in steelmaking, as deoxidants, desulphurizers and alloying elements. Silicon is the primary deoxidizer....
|
Capacity : 14400 MT/Annum |
Plant and Machinery cost: 897 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 70.00 |
TCI : Cost of Project : 1861 Lakhs |
|
Cost of Project : 0 |