Please choose a project below related to this category.
Medium-density fibreboard (MDF) is an engineered wood product made by breaking down hardwood or softwood residuals into woodfibres, often in a defibra...
|
Capacity : 300CBM/day |
Plant and Machinery cost: 3511 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project : 6613 lakhs |
|
Cost of Project : 661300000 |
Fiberboard is a type of engineered wood product that is made out of wood fibers. Types of fiberboard (in order of increasing density) include particle...
|
Capacity : 400CBM/day |
Plant and Machinery cost: 6866 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project: 9559 lakhs |
|
Cost of Project : 955900000 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based, cementitious building material that is expanding into new worldwide markets. . In...
|
Capacity : AAC Blocks: 500 Cu.Mtr./day |
Plant and Machinery cost: Rs 601 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of project: Rs 1415 Lakhs |
|
Cost of Project : 141500000 |
Fiberboard is a type of engineered wood product that is made out of wood fibers. Types of fiberboard (in order of increasing density) include particle...
|
Capacity : Medium Density Fiberboard (MDF) : 50001 CBM/Annum |
Plant and Machinery cost: Rs 2034 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project: Rs 3873 Lakh |
|
Cost of Project : 387300000 |
Rice husk is an agricultural residue easily available in rice producing countries. India is a major rice producing country, and the husk generated dur...
|
Capacity : Precipitated Silica:10 MT/Day • CaCO3 (by product):20.6 MT/Day |
Plant and Machinery cost: Rs 864 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project:Rs 1255 Lakhs |
|
Cost of Project : 125500000 |
Fusion bonded epoxies are one part, heat curable, thermosetting epoxy utilized for corrosion protection. FBEs are applied to heated parts in a powder...
|
Capacity : Fusion Bonded Epoxy Coated Rebars 333 MT/Day |
Plant and Machinery cost: Rs 680 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.17 |
|
Break Even Point (BEP): 58.80 |
TCI : Cost of Project : Rs 2125 Lakhs |
|
Cost of Project : 212500000 |
Parboiled rice, popularly known as “ushna” rice in boiled form. India contributes about one-third of the world acreage under rice. Rice is available i...
|
Capacity : Parboiled Rice :80 MT/Day •Broken Rice:6 MT/Day •Rice Bran by product:6 MT/Day •Rice Husk by product:19 MT/Day |
Plant and Machinery cost: Rs 677 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : Rs 1290 Lakhs |
|
Cost of Project : 129000000 |
A medical college is meant to impart education of medical field to students to qualify them as doctors in different specialized disciplines so as to t...
|
Capacity : Total Students per Annum:150 Students Admitted/Annum 750 Beded Hospital |
Plant and Machinery cost: Rs 2047 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project :Rs 10747 Lakhs |
|
Cost of Project : 1074700000 |
The oil palm, Elaeis guineensis, is native to Africa. The commercial values of this crop lies mainly in the oil that can be obtained from the mesocarp...
|
Capacity : Refined Palm Oil:100 MT/Day •Refined Soybean Oil:100 MT/Day |
Plant and Machinery cost: Rs 1193 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.52 |
|
Break Even Point (BEP): 45.10 |
TCI : Cost of Project:Rs 8724 Lakhs |
|
Cost of Project : 872400000 |
A collapsible tube is defined as a cylinder of pliable metal that can be sealed in such a manner that its contents, although readily discharged in any...
|
Capacity : Aluminium Collapsible Tubes (Printed): 2,00,000 Nos/Day |
Plant and Machinery cost: Rs 608 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.40 |
|
Break Even Point (BEP): 41.58 |
TCI : Cost of Project: Rs 1158 Lakhs |
|
Cost of Project : 115800000 |
Cement is a material with adhesive and cohesive properties which make it capable of bonding minerals fragments into a compact whole. It can be defined...
|
Capacity : 200 MT/Day |
Plant and Machinery cost: Rs 755 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.22 |
|
Break Even Point (BEP): 61.78 |
TCI : Cost of Project: Rs 1254 Lakhs |
|
Cost of Project : 125400000 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : A.A.C. Blocks: 500 Cu.Mt /day |
Plant and Machinery cost: Rs 601 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project:Rs 1415 Lakhs |
|
Cost of Project : 141500000 |