Please choose a project below related to this category.
Cement industry forms a vital part of infrastructure development since no modern construction activity can take place without the use of cement in one...
|
Capacity : 1800000 Nos. Cement Bags (50 Kg. each) |
Plant and Machinery cost: 1296 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : 1750 Lakhs |
|
Cost of Project : 175000000 |
Starch is a group of polysaccharides, composed of glucopyranose units joined together by glucosidric linkages. It conforms to the molecular formula, (...
|
Capacity : - |
Plant and Machinery cost: 780 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 2590 Lakhs |
|
Cost of Project : 0 |
7 ACA or 7 Aminocephalosporanic acid is made from Cephalosporin C and is a key intermediate for synthesizing cephalosporin antibiotics, the B lactam...
|
Capacity : 150 MT/Annum |
Plant and Machinery cost: 1486 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 64.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project : 2167 Lakhs |
|
Cost of Project : 0 |
Maize (Zea mays L) is one of the most important cereals of the world and provides more human food than any other cereal. Starch is a group of polysacc...
|
Capacity : - |
Plant and Machinery cost: 780 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 2590 Lakhs |
|
Cost of Project : 0 |
Hydrazine N2H4, a colorless liquid having an ammoniacal odor, is the simplest diamine and unique in its class because of the NÀN bond. It was ?rst pre...
|
Capacity : 9000 MT/Annum |
Plant and Machinery cost: 3658 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Cost of Project : 4773 Lakhs |
|
Cost of Project : 0 |
Potato is considered to be one of the traditional food items of India. Potato is the staple food for 2/3rd of the world population. India is presently...
|
Capacity : 14400 MT Potato Powder,14400 MT Potato Flakes,6000 MT Potato Granules |
Plant and Machinery cost: 12900 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 34.00 |
TCI : Cost of Project : 15800 Lakhs |
|
Cost of Project : 0 |
Manganese and silicon are crucial constituents in steelmaking, as deoxidants, desulphurizers and alloying elements. Silicon is the primary deoxidizer....
|
Capacity : 14400 MT/Annum |
Plant and Machinery cost: 897 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 70.00 |
TCI : Cost of Project : 1861 Lakhs |
|
Cost of Project : 0 |
Kraft paper, Brown paper or wrapping paper is made from variety of raw materials, e.g. Bagasse, ground wood, straw, waste paper, in various combinatio...
|
Capacity : 15000 MT/Annum |
Plant and Machinery cost: 565 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 943 Lakhs |
|
Cost of Project : 94300000 |
A plastic syringe is a cylindrical tool used for many purposes, from medicine to mechanics, to arts, crafts and refilling inkjet printer cartridges. D...
|
Capacity : 22500000 Nos. 5 Ml Size/Annum, 22500000 Nos. 10 Ml Size/Annum |
Plant and Machinery cost: 636 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project : 837 Lakhs |
|
Cost of Project : 0 |
The economics of rice milling industry is largely dependent on the useful commercial utilization of its by-products. The purpose of Integrated Unit is...
|
Capacity : - |
Plant and Machinery cost: 4373 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 38.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Cost of Project : 8016 Lakhs |
|
Cost of Project : 0 |
Potato is one of the important tuber vegetables, which is consumed throughout the year. Indian vegetable basket is incomplete without mentioning the k...
|
Capacity : 3000 MT/Annum, 5 MT Potato Powder/Day, 2.5 MT Potato Flakes/Day, 2.5 MT Potato Granules/Day |
Plant and Machinery cost: 665 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 42.00 |
TCI : 1240 Lakhs |
|
Cost of Project : 0 |
The term cement is used to designate many different kinds of substances that are used as binders. The term cements as used henceforth will be confined...
|
Capacity : 90,000 MT/Annum |
Plant and Machinery cost: 1296 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : 1750 Lakhs |
|
Cost of Project : 175000000 |