Investment Opportunities & Business Ideas in Mozambique, Africa- Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship Projects

Please choose a project below related to this category.

COPPER ROD CASTING, WIRE DRAWING AND ENAMELLING - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities
COPPER ROD CASTING, WIRE DRAWING AND ENAMELLING - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities

Copper wire is an essential material for electrical cables, motors and transformer winding. Copper wire is available in different gauges. The gauge of...

Capacity :

6300 MT/Annum

Plant and Machinery cost:

190 Lakhs

Working Capital :

-

Rate of Return (ROR):

45.00

Break Even Point (BEP):

53.00

TCI :

Cost of Project : 1126 Lakhs

Cost of Project :

0

TYRES AND TUBES FOR BICYCLE AND RICKSHAW - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities
TYRES AND TUBES FOR BICYCLE AND RICKSHAW - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities

Tyres and Tubes are the backbone of the bicycle and rickshaw. Bicycle and rickshaw continues to be the principal mode of transport for the low and mid...

Capacity :

300000 Nos. Tyres & 300000 Nos. Tubes

Plant and Machinery cost:

158 Lakhs

Working Capital :

-

Rate of Return (ROR):

42.00

Break Even Point (BEP):

53.00

TCI :

Cost of Project : 351 Lakhs

Cost of Project :

0

WOODEN TOOTHPICK - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Layout
WOODEN TOOTHPICK - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Layout

A toothpick is a small stick of wood, plastic, bamboo, metal, bone or other substance used to remove detritus from the teeth, usually after a meal. A...

Capacity :

-

Plant and Machinery cost:

6 Lakhs

Working Capital :

-

Rate of Return (ROR):

42.00

Break Even Point (BEP):

62.00

TCI :

22 Lakhs

Cost of Project :

0

BIO PLASTIC PRODUCTS - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
BIO PLASTIC PRODUCTS - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Plastics have become an important part of modern life and are used in different sectors of applications like packaging, building materials, consumer p...

Capacity :

-

Plant and Machinery cost:

166 Lakhs

Working Capital :

-

Rate of Return (ROR):

47.00

Break Even Point (BEP):

51.00

TCI :

Cost of Project : 298 Lakhs

Cost of Project :

0

PACKAGED DRINKING WATER - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
PACKAGED DRINKING WATER - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...

Capacity :

-

Plant and Machinery cost:

25 Lakhs

Working Capital :

-

Rate of Return (ROR):

44.00

Break Even Point (BEP):

54.00

TCI :

100 Lakhs

Cost of Project :

0

PACKAGED DRINKING WATER - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
PACKAGED DRINKING WATER - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...

Capacity :

3000000 Bottles/Annum

Plant and Machinery cost:

39 Lakhs

Working Capital :

-

Rate of Return (ROR):

41.00

Break Even Point (BEP):

52.00

TCI :

Cost of Project : 108 Lakhs

Cost of Project :

0

COAL BASED POWER PLANT (500 MW) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost & Revenue
COAL BASED POWER PLANT (500 MW) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost & Revenue

Power Generation is an essential requirement of economic growth of a country. A weak power infrastructure does not lead to the growth potential and pu...

Capacity :

500 MW

Plant and Machinery cost:

143200 Lakhs

Working Capital :

-

Rate of Return (ROR):

56.00

Break Even Point (BEP):

25.00

TCI :

Cost of Project : 158700 Lakhs

Cost of Project :

0

PACKAGED DRINKING WATER WITH PET BOTTLES - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities
PACKAGED DRINKING WATER WITH PET BOTTLES - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...

Capacity :

60000000 Nos. Bottles/Annum

Plant and Machinery cost:

217 Lakhs

Working Capital :

-

Rate of Return (ROR):

45.00

Break Even Point (BEP):

60.00

TCI :

Cost of Project : 454 Lakhs

Cost of Project :

0

FUEL BRIQUETTES FROM BIOMASS (Bio Coal Briquettes from Agricultural Cellulosic Waste) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials
FUEL BRIQUETTES FROM BIOMASS (Bio Coal Briquettes from Agricultural Cellulosic Waste) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials

Energy is the key factor in economic development of country. As we approach the turn of century our requirements of energy will increase rapidly and v...

Capacity :

4800 MT/Annum

Plant and Machinery cost:

28 Lakhs

Working Capital :

-

Rate of Return (ROR):

46.00

Break Even Point (BEP):

38.00

TCI :

129 Lakhs

Cost of Project :

0

COPPER WIRE DRAWING (From Higher Size To Very Thin Size Used In Electrical Cables) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials
COPPER WIRE DRAWING (From Higher Size To Very Thin Size Used In Electrical Cables) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials

Copper wire is an essential material for electrical cables and motor and transformer winding. Copper wire is available in different gauges (42 gauges...

Capacity :

150 MT/Annum

Plant and Machinery cost:

69 Lakhs

Working Capital :

-

Rate of Return (ROR):

45.00

Break Even Point (BEP):

42.00

TCI :

167 Lakhs

Cost of Project :

0

ALUMINA FROM BAUXITE
ALUMINA FROM BAUXITE

Bauxite ore is an important mineral used in producing alumina, the raw material that is in turn used for producing aluminum. Approximately 85% of Baux...

Capacity :

19998 MT/Annum Pure Alumina from Bauxite

Plant and Machinery cost:

671 Lakhs

Working Capital :

-

Rate of Return (ROR):

43.00

Break Even Point (BEP):

48.00

TCI :

Cost of Project : 2113 Lakhs

Cost of Project :

0

PACKAGED DRINKING WATER, SODA WATER AND PET BOTTLES - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Cost of Project
PACKAGED DRINKING WATER, SODA WATER AND PET BOTTLES - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Cost of Project

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...

Capacity :

Drinking Water – 17280000 Nos. Bottles (1 Ltr.)/Annum,Soda Water – 1008000 Nos. Bottles (600 Ml)/Annum,Drinking Water Jar – 720000 Nos. Jar (20 Ltr.)/Annum

Plant and Machinery cost:

403 Lakhs

Working Capital :

-

Rate of Return (ROR):

44.00

Break Even Point (BEP):

60.00

TCI :

Cost of Project : 695 Lakhs

Cost of Project :

0

Make An Appointment

Talk to Our Experts Today!

appoinment
Call Us WhatsApp