Enamelled copper wire is an essential material for motor and transformer winding. There is a heavy consumption of enamelled copper wire. Enamelled co...
|
Capacity : 2 MT / Day |
Plant and Machinery cost: 85 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 550 Lakhs |
|
Cost of Project : 0 |
For vacuum distillation of crude coal tar, the crude coal tar is produced from coke ovens of steel plant, 50% of this crude coal tar is pitch. The cr...
|
Capacity : 7500 MT / Annum |
Plant and Machinery cost: Rs. 137 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : 320 Lakhs |
|
Cost of Project : 0 |
Ongoing rise of Air Conditioners and Refrigerators in the market and production in GCC and other part of the world and Heat Transfer Systems in engine...
|
Capacity : 12000 TPA |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : 65 Crores |
|
Cost of Project : 0 |
Ongoing rise of Air Conditioners and Refrigerators in the market and production in GCC and other part of the world and Heat Transfer Systems in engine...
|
Capacity : 12000 TPA |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : 65 Crores |
|
Cost of Project : 0 |
Bio coal briquette is an ideal and best ready substitute to coal, fire wood, lignite etc. and easily replaces these conventional fuels for heating, s...
|
Capacity : 16 Ton / Day |
Plant and Machinery cost: 23 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 53.00 |
TCI : 89 Lakhs |
|
Cost of Project : 0 |
Iron ore pellets are used in blast furnaces for producing sponge iron & steels. Marked by high productivity lower fuel consumption and improved furnac...
|
Capacity : 6000 MT / Annum |
Plant and Machinery cost: 187 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : 479 Lakhs |
|
Cost of Project : 0 |
Carpentry and joinery are common terms used with any class of work with wood. Strictly speaking carpentry deals with all works of a carpentry such as...
|
Capacity : 80 Pcs./day |
Plant and Machinery cost: 10 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 42.00 |
TCI : 93 Lakhs |
|
Cost of Project : 0 |
The Pharmaceutical Industry in general is well managed in sound economic principles and has excellent techniques of production, technological backing...
|
Capacity : - |
Plant and Machinery cost: 43 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : 125 Lakhs |
|
Cost of Project : 0 |
Copper is the most commonly used architectural metal now-a-days. Copper plays an essential role in the modern building. From recycled cladding and ro...
|
Capacity : 12 MT/day |
Plant and Machinery cost: 198 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 567 Lakhs |
|
Cost of Project : 0 |
Castings of suitable shape and size intended for subsequent hot working are termed as ingots. Ingot iron has very low carbon in steel. This is general...
|
Capacity : 60,000 MT / Annum |
Plant and Machinery cost: 4012 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 30.00 |
TCI : 6454 Lakhs |
|
Cost of Project : 0 |
Bisleri, which pioneered the packaged drinking water business in India, catering to consumers need to have hygienic drinking water while on the move...
|
Capacity : 30,000 Thousand Nos./Annum or 1,00,000 Bottles /day |
Plant and Machinery cost: Rs. 105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project Rs. 282 Lakhs |
|
Cost of Project : 0 |
Potable spring waters containing, sulphur iron, magnesium and other mineral salts occurring in certain regions are claimed to be beneficial to human m...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |