Please choose a project below related to this category.
Manufacturing Business of Medical Disposables. IV Cannula. Cannula Manufacturing System The IV cannula itself is a small flexible tube that surro...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Copper makes vital contributions to sustaining and improving society. Copper's chemical, physical and aesthetic properties make it a material of choic...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Project Opportunities in Production of Copper Ingots/Copper Ash from Copper Ore. Copper Extraction, Copper Processing, Making Copper Ingots. Copp...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
How to Start Artificial Marble Tiles Manufacturing Industry. Profitable Business Idea for Synthetic Marble Tiles Production. Artificial marble, commo...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Plastics are made from limited resources such as petroleum, and huge advances are being made in the development of technologies to recycle plastic was...
|
Capacity : Plastic Granules: 2400 Kgs/Day PET Granules: 2400 Kgs/Day |
Plant and Machinery cost: 97 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : Rs 238 lakhs |
|
Cost of Project : 23800000 |
Granite and Marble polishing stone is an essential item in the civil construction industries. It is made by using some chemical compounds mixed homoge...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Granite and Marble polishing stone is an essential item in the civil construction industries. It is made by using some chemical compounds mixed homoge...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Surgical gowns are worn by doctors and nurses in the operating theater to address a dual function of preventing transfer of microorganisms and body fl...
|
Capacity : Surgeon Gowns: 250 Pcs./Day Pateint Gowns: 300 Pcs./Day Pillow Covers: 700 Pcs./Day Surgeon Caps: 1000 Pcs./Day |
Plant and Machinery cost: 204 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs 492 lakhs |
|
Cost of Project : 49200000 |
Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...
|
Capacity : Monitors: 5 Kgs /Day Plastic Granules: 2333.33 Kgs /Day Copper Wire Scraps: 13.33 Kgs /Day Glass from CRT: 133.33 Kgs /Day Other Metals: 566.67 Kgs /Day |
Plant and Machinery cost: 100 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 18.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : Rs 325 lakhs |
|
Cost of Project : 32500000 |
A Bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. Bicycles are one of th...
|
Capacity : Bicycles (Different Sizes): 1000 Nos. /Day Cycle Rickshaw: 1000 Nos. Day |
Plant and Machinery cost: Rs 336 lakhs |
|
Working Capital : 0 |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project: Rs 1525 lakhs |
|
Cost of Project : 152500000 |
Bicycles are one of the oldest forms of transportation. Even today millions of people travel by bicycle daily to their work, college, universities and...
|
Capacity : Bicycles (Different Sizes): 2000 Nos./day |
Plant and Machinery cost: 336 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs 1589 lakhs |
|
Cost of Project : 158900000 |
Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...
|
Capacity : Copper Wire:1.67 MT/day Plastic Granules:7.43 MT/day Glass :3.23 MT/day Ferrous Metal |
Plant and Machinery cost: 131 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 30.00 |
TCI : Cost of Project: Rs 1272 lakhs |
|
Cost of Project : 127200000 |