Please choose a project below related to this category.
Energy bars are often promoted as a quick snack, a supplement athlete/ sports person or those who done workouts energy bars are also an excellent meth...
|
Capacity : 120 Lakh Pcs/annum |
Plant and Machinery cost: 188 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 488 Lakhs |
|
Cost of Project : 0 |
Solar cell comprises by two words. Solar means sunlight & cell is the device to provide the current supply and as the whole solar cell is device, whi...
|
Capacity : 10000 Nos. / Day |
Plant and Machinery cost: 49 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 39.00 |
TCI : 358 Lakhs |
|
Cost of Project : 0 |
There is significant increase in demand for pre-coated galvanized sheet-for industrial, storage and warehousing projects. In USA & Europe 55% Alumini...
|
Capacity : 15 MT / Day |
Plant and Machinery cost: 58 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 27.00 |
TCI : 793 Lakhs |
|
Cost of Project : 0 |
Celery, Apium graveolens L is cultivated for its seeds and essential oil. An improved method has been developed for maximum yield of essential oil wit...
|
Capacity : : 300 Kg celery seeds / batch & 4 batches a day i.e.1200 Kg celery seeds / day |
Plant and Machinery cost: 25 Lakhs |
|
Working Capital : 12 Lakhs (One Month) |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Direct conversion of daylight into electricity by photovoltaic or solar-thermal conversion system is the most promising renewable energy options that...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
There has been considerable increase in the consumption of fruits and vegetables juice beverages in the world during the last few years. Fruit juice...
|
Capacity : 2000 Kgs. / Day |
Plant and Machinery cost: 18 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 74.00 |
|
Break Even Point (BEP): 29.00 |
TCI : 2 Crores |
|
Cost of Project : 0 |
The purpose of a transmission line tower is to support conductors carrying electrical power and one or two ground wires at suitable distances above t...
|
Capacity : 24,000 MT /Year |
Plant and Machinery cost: 149 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 716 Lakhs |
|
Cost of Project : 0 |
Disposable needle is widely used by doctors for injection purpose with the help of syringes. With the increase in population in our country, requirem...
|
Capacity : - |
Plant and Machinery cost: 147 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : 426 Lakhs |
|
Cost of Project : 0 |
Among the alcoholic drinks, Beer is quite common and popular in almost every Country of the World. People of different countries take beer in varying...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Ongoing rise of Air Conditioners and Refrigerators in the market and production in GCC and other part of the world and Heat Transfer Systems in engine...
|
Capacity : 12000 TPA |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : 65 Crores |
|
Cost of Project : 0 |
Ongoing rise of Air Conditioners and Refrigerators in the market and production in GCC and other part of the world and Heat Transfer Systems in engine...
|
Capacity : 12000 TPA |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : 65 Crores |
|
Cost of Project : 0 |
Fly Ash required for the production of Fly Ash Bricks, the raw Fly Ash is subjected to Triboelectrostatic Beneficiation process making use of separat...
|
Capacity : 12,000 Nos. / Day |
Plant and Machinery cost: 260 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Cost of Project : 655 Lakhs |
|
Cost of Project : 0 |