Therefore, the affordable value of SMEs for the target market and entrants minerals, agricultural land, land and various municipalities, and factories and hydrocarbon raw materials, creates the features of strategic geography of a region due to non-hydrocarbon options that a fiscal and political policy is pursuing fast-moving consumer goods, light production, and production of construction materials, renewable power sources, and logistics. Hence, in Algeria, with a reasonable volume of the mineral resources complex, the given characteristics are saved.
Economic driving forces (domestic demand, regional trade , trade situation, strategic geography). Algeria is working to diversify its economy away from hydrocarbons. The industry is supported by non-oil GDP growth , growth and public investment. Seriously, Thanks to its huge domestic market and its proximity to Southern Europe, it's a natural export center , center for coastal and Mediterranean markets.
Infrastructure and logistics (ports roads , roads energy supply). Algiers Oran and Annaba: Major ports and recent public investment in new transport and energy infrastructure have improved the logistics of processed and bulk goods. Plus a bunch of energy projects are currently being implemented to support the same amount of industrial activity.
Labor characteristics and cost considerations. In addition to a large workforce, manufacturing also has competitive labor costs compared to a bunch of its peers in the Mediterranean region and is suitable for labor-intensive processing and assembly operations.
Typical investment size and time-to-market: small and medium projects such as tens and tens of thousands of US dollars small agricultural processing dollars cold storage up to 5 million USD for modular production or medium-sized cement/refractory lines. Lead time is usually 6-24 months depending on permits and plant complexity; However the industry is always difficult - the local partner cuts both.
All proposed projects are sized appropriately for small and medium-sized enterprises and development of pilot facilities or expansion based on multiple development phases should be preferred to minimize risks.
The government will work to activate investment promotion tools and provide incentives for relevant projects through national investment agencies. The policies implemented in the recent budgets have laid great emphasis on diversification and infrastructure development. The incentives provide land customs and tax exemptions in special economic zones and prioritize projects that achieve national goals.
First, because they are accompanied by the state’s diversification objectives and infrastructure spending, there are specific, practical, medium-term opportunities in Algeria for SMs and investors in the autoprocessing, same-years’ construction materials, gentle manufacturing, and energy facilities fields. Secondly, due to the multiplier, accumulating nature of experience, and economies of scale, even minimal starting efforts may increase to considerable activities in various sectors. Thirdly, one of the central problems in investing in connected sectors in the southern Mediterranean is the potential investor’s inexperience in terms of the local and regional market. Therefore, it is short-sighted to go beyond the company’s existing business model due to the consequences of underestimating the dangers and sensitivity to the institutional atmosphere.
Please choose a project below related to this category.
An ‘Ore’ may be defined as the aggregate of minerals from which a desired constituent mineral can be extracted with profit. The most used of all metal...
|
Capacity : Iron Ore: 800 MT/Day |
Plant and Machinery cost: Rs 779 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project: Rs 2485 Lakhs |
|
Cost of Project : 2485 |
Bicycle tubes are the backbone of the bicycle industries. Few numbers of companies in organized sector are engaged in the quality grade cycles tyres a...
|
Capacity : Bicycle Tubes: 10,000 Nos. /Day |
Plant and Machinery cost: Rs 118 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project: Rs 622 Lakhs |
|
Cost of Project : 62200000 |
A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provide enough power to be usefu...
|
Capacity : Solar Panel 5MW/Annum |
Plant and Machinery cost: Rs 109 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project: Rs 450 Lakhs |
|
Cost of Project : 45000000 |
Bicycle and rickshaw tyres & tubes are the backbone of the bicycle and rickshaw. There are few numbers of organized manufacturing companies which are...
|
Capacity : Rickshaw & Cycle Tyres : 1,500.00 Nos./Day,Rickshaw & Cycle Tubes: 1,500.00 Nos./Day |
Plant and Machinery cost: 128 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 72.00 |
TCI : Cost of Project : 570 Lakhs |
|
Cost of Project : 57000000 |
Lead acid batteries are rechargeable batteries made of lead plates situated in a ‘bath’ of sulfuric acid within a plastic casing. They are used in eve...
|
Capacity : 26000 MT/ Annum |
Plant and Machinery cost: Rs. 1422 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : Rs. 2154 Lakhs |
|
Cost of Project : 215400000 |
As the name implies, the mineral water is the purified water fortified with requisite amounts of minerals. It is either obtained from natural resource...
|
Capacity : 3000000 Ltrs. /Annum |
Plant and Machinery cost: 24 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project: 112 Lakhs |
|
Cost of Project : 11200000 |
Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and usually there’s a more s...
|
Capacity : 210 Lakhs Nos. /annum |
Plant and Machinery cost: Rs. 719 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs. 1736 Lakhs |
|
Cost of Project : 173600000 |
An ‘Ore’ may be defined as the aggregate of minerals from which a desired constituent mineral can be extracted with profit. The most used of all metal...
|
Capacity : 140 MT/Day |
Plant and Machinery cost: Rs. 358 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.18 |
|
Break Even Point (BEP): 57.96 |
TCI : Cost of Project: Rs. 635 Lakhs |
|
Cost of Project : 63500000 |
Liquid oxygen must be handled with all the precaution required for safety with any cryogenic fluid. Gaseous Oxygen is authorized for shipment in cylin...
|
Capacity : 4152 cum/Day |
Plant and Machinery cost: Rs.105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost Of Project : Rs. 286 Lakhs |
|
Cost of Project : 28600000 |
An active ingredient (AI) is the substance in a pharmaceutical drug or a pesticide that is biologically active. The similar terms active pharmaceutic...
|
Capacity : Cephalexin Monohydrate: 500 Kgs/Day, Ampicillin Trihydrate: 500 Kgs/Day,Ibuprofen: 500 Kgs/Day |
Plant and Machinery cost: Rs.448 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost Of Project : Rs.958 Lakhs |
|
Cost of Project : 95800000 |
E waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers, and...
|
Capacity : 5 MT/Day |
Plant and Machinery cost: 60 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 15.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : 241 Lakhs |
|
Cost of Project : 24100000 |
Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and usually there’s a more s...
|
Capacity : 40000 Ltrs./Day |
Plant and Machinery cost: 59 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 171 Lakhs |
|
Cost of Project : 17100000 |