Therefore, the affordable value of SMEs for the target market and entrants minerals, agricultural land, land and various municipalities, and factories and hydrocarbon raw materials, creates the features of strategic geography of a region due to non-hydrocarbon options that a fiscal and political policy is pursuing fast-moving consumer goods, light production, and production of construction materials, renewable power sources, and logistics. Hence, in Algeria, with a reasonable volume of the mineral resources complex, the given characteristics are saved.
Economic driving forces (domestic demand, regional trade , trade situation, strategic geography). Algeria is working to diversify its economy away from hydrocarbons. The industry is supported by non-oil GDP growth , growth and public investment. Seriously, Thanks to its huge domestic market and its proximity to Southern Europe, it's a natural export center , center for coastal and Mediterranean markets.
Infrastructure and logistics (ports roads , roads energy supply). Algiers Oran and Annaba: Major ports and recent public investment in new transport and energy infrastructure have improved the logistics of processed and bulk goods. Plus a bunch of energy projects are currently being implemented to support the same amount of industrial activity.
Labor characteristics and cost considerations. In addition to a large workforce, manufacturing also has competitive labor costs compared to a bunch of its peers in the Mediterranean region and is suitable for labor-intensive processing and assembly operations.
Typical investment size and time-to-market: small and medium projects such as tens and tens of thousands of US dollars small agricultural processing dollars cold storage up to 5 million USD for modular production or medium-sized cement/refractory lines. Lead time is usually 6-24 months depending on permits and plant complexity; However the industry is always difficult - the local partner cuts both.
All proposed projects are sized appropriately for small and medium-sized enterprises and development of pilot facilities or expansion based on multiple development phases should be preferred to minimize risks.
The government will work to activate investment promotion tools and provide incentives for relevant projects through national investment agencies. The policies implemented in the recent budgets have laid great emphasis on diversification and infrastructure development. The incentives provide land customs and tax exemptions in special economic zones and prioritize projects that achieve national goals.
First, because they are accompanied by the state’s diversification objectives and infrastructure spending, there are specific, practical, medium-term opportunities in Algeria for SMs and investors in the autoprocessing, same-years’ construction materials, gentle manufacturing, and energy facilities fields. Secondly, due to the multiplier, accumulating nature of experience, and economies of scale, even minimal starting efforts may increase to considerable activities in various sectors. Thirdly, one of the central problems in investing in connected sectors in the southern Mediterranean is the potential investor’s inexperience in terms of the local and regional market. Therefore, it is short-sighted to go beyond the company’s existing business model due to the consequences of underestimating the dangers and sensitivity to the institutional atmosphere.
Please choose a project below related to this category.
Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...
|
Capacity : Drinking Water – 17280000 Nos. Bottles (1 Ltr.)/Annum,Soda Water – 1008000 Nos. Bottles (600 Ml)/Annum,Drinking Water Jar – 720000 Nos. Jar (20 Ltr.)/Annum |
Plant and Machinery cost: 403 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 695 Lakhs |
|
Cost of Project : 0 |
Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a loose category of surplus, obsolete, broken, or discarded...
|
Capacity : - |
Plant and Machinery cost: 51 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 196 Lakhs (W/C 1 Month) |
|
Cost of Project : 0 |
Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...
|
Capacity : 6,00,00,000 Bottles/Annum |
Plant and Machinery cost: 217 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 455 Lakhs |
|
Cost of Project : 0 |
Hygiene is an essential component of healthy living, integral to achieving health and preventing disease. Not just selecting the right food choices bu...
|
Capacity : 3000 MT/Annum, 6 MT Paper Napkins, 2 MT Toilet Rolls, 2 MT Facial Paper |
Plant and Machinery cost: 41 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 25.00 |
TCI : 923 Lakhs |
|
Cost of Project : 0 |
Bicycle and motorcycle tubes are the backbone of the bicycle and motorcycle industries. Few numbers of companies in the organized sectors are engaged...
|
Capacity : 300000 Nos. Bicycle Tubes, 300000 Nos. Motorcycle Tubes |
Plant and Machinery cost: 105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project : 240 Lakhs |
|
Cost of Project : 0 |
Wooden furniture is used for articles of daily use in dwelling house, place of business, public buildings and includes items such as chairs, tables, b...
|
Capacity : 7500 Pcs./Annum |
Plant and Machinery cost: 13 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 118 Lakhs |
|
Cost of Project : 0 |
Bottled water industry, colloquially called, the mineral water industry, is a symbol of new life style emerging in India. While a large segment of th...
|
Capacity : - |
Plant and Machinery cost: 403 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 695 Lakhs |
|
Cost of Project : 69500000 |
Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a loose category of surplus, obsolete, broken, or discarded...
|
Capacity : Monitor -10 Pcs/Day, Plastic Granules – 5.33 M.T/Day, Copper Wire Scrap-9 Kg/day, Glass Scrap from C.R.T-270 Kg/Day,Other Metals-800 Kg/Day |
Plant and Machinery cost: 51 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 196 Lakhs |
|
Cost of Project : 0 |
Oxygen and nitrogen are the most important industrial gases finding its application in large quantities in metal fabrication and cutting industries. I...
|
Capacity : 1200 Cubic Meter/Day |
Plant and Machinery cost: 21 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 52.00 |
TCI : 68 Lakhs |
|
Cost of Project : 0 |
E-waste is a popular informal name for electronic product nearing the end of their useful life. Computers, televisions, VCR, stereos, copier, and fax...
|
Capacity : Monitor -10 Pcs/Day, Plastic Dana “ 5.33 M.T/Day,Copper Wire Scrap-9 Kg/day, Glass Scrap from C.R.T-270 Kg/Day, Other Metals-800 Kg/Day |
Plant and Machinery cost: 51 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 196 Lakhs |
|
Cost of Project : 0 |
The plastic industry in India plays a very important and key role in industrialization. Disposable cups, glasses, plates are used in daily life now a...
|
Capacity : 150 Lakhs Pcs/Annum Cups, 300 Lakhs Pcs/Annum Glass, 150 Lakhs Pcs/Annum Plates |
Plant and Machinery cost: 34 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 104 Lakhs |
|
Cost of Project : 0 |
Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...
|
Capacity : 32,000 Ltrs/Day |
Plant and Machinery cost: 221 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 19.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 327 Lakhs |
|
Cost of Project : 32700000 |