Angola, which is abundant in hydrocarbons, minerals, fertile land and marine resources, is striving to focus on the diversification of the economy from oil. The most promising prospects include agribusiness, fisheries, mineral processing, renewable sources of power and logistics. The combination of a strategic geographic location, raw material resources, and attractive investment policies turns Angola into a country of extensive opportunities for innovative SMEs and project investors.
Economic drivers (regional trade, location, GDP growth, infrastructure):
Following Angola’s economy close to real GDP growth of 4.4% in 2024, more than 4% generated by the agriculture, mining and commerce sectors due to non-oil sectors, the government pursued more intense that diversification, because more it depends less than 33 Domergue and Gourdon of the total budget comes oil-related allocations. Angola’s Atlantic Ocean location, Southern Africa and the trade routes and neighboring the Export includes many natural resources.
Logistics & workforce availability:
Moreover, Angola is developing logistics corridors, such as the Lobito Corridor railway, which will connect the country with the Democratic Republic of the Congo. It plans the development of inland export flows. Angola has a young population and improves vocational and technical training to benefit industrial sectors.
Availability of Raw Materials and Supporting Inputs
Angola’s resource base is diverse:
These raw materials provide feedstock for value-added processing. However, specialized inputs, machinery, chemicals and precision components may remain import-dependent—requiring careful supply chain planning.
Investing in these sectors in Angola offers multiple advantages:
Angola’s economy shows steady diversification and growing demand across key sectors.
All the above trends result in the annual growth of 5-9% in the next three years in almost all non-oil sectors in Angola due to expanding infrastructure, import substitution, and growth of FDI.
Each project offers scalability based on capital, local infrastructure and market linkage.
Angola is presenting an opportunity at a critical inflection point: abundant natural resources, policy reforms, infrastructure investments and diversification plans coalesce to form an attractive backdrop for industrial and project investments. By structuring the execution in a disciplined manner with appropriate planning, risk cover and phased execution, investors and entrepreneurs can capitalize on high-opportunity sectors such as agribusiness, fisheries, processing, renewables and logistics.
Please choose a project below related to this category.
Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...
|
Capacity : 7500 MT/annum |
Plant and Machinery cost: 131 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 30.00 |
TCI : Cost of Project: 272 lakhs |
|
Cost of Project : 127200000 |
The tissues paper sector has boomed over the last few years. With a move to more luxurious tissue paper and ultra-absorbent paper towels the industry...
|
Capacity : Toilet Paper Rolls : 7,200,000 Nos./annum Paper Napkin (100 Pcs.): 558,000 Nos./annum Facial Tissue |
Plant and Machinery cost: 59 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project 341 Lakhs |
|
Cost of Project : 34100000 |
Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active compound (Surfactant)...
|
Capacity : Detergent Cake:180,000Kgs/annum Detergent Powder:180,000Kgs/annum |
Plant and Machinery cost: Rs 15 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 76.00 |
TCI : Cost of Project : Rs 36 lakhs |
|
Cost of Project : 3600000 |
The tissues paper sector has boomed over the last few years. With a move to more luxurious tissue paper and ultra-absorbent paper towels the industry...
|
Capacity : Toilet Paper Rolls: 7,200,000 Nos./annum Paper Napkin (100 Pcs.): 558,000 Nos./annum Facial Tissue (100 Pcs.): 1,251,000 Nos./annum |
Plant and Machinery cost: Rs 59 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project : Rs 341 lakhs |
|
Cost of Project : 34100000 |
Electronic wastes, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a description of surplus, obsolete, broken or discarded el...
|
Capacity : Copper Wire: 500mt/annum Plastic Granules: 2230mt/annum Glass: 970mt/annum Ferrous Metal: 800mt/annum Monitors (Repair): 3000mt/annum |
Plant and Machinery cost: Rs 132 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project: Rs 518 lakhs |
|
Cost of Project : 51800000 |
Low Carbon Silico Manganese which is popularly known as LCSiMn is a ferrous alloy with content of carbon, silica and manganese. A large number of stee...
|
Capacity : Low Carbon Silicomanganese: 15,000 MT/Annum |
Plant and Machinery cost: Rs 1422 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : Rs 3936 lakhs |
|
Cost of Project : 393600000 |
High Carbon Ferro- manganese containing about 7% carbon is not suitable for the production of steels or other alloys containing manganese in which it...
|
Capacity : Low Carbon Ferromanganes : 15,000 MT/Annum |
Plant and Machinery cost: Rs 371 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project : Rs 2804 lakhs |
|
Cost of Project : 280400000 |
Copper makes vital contributions to sustaining and improving society. Copper's chemical, physical and aesthetic propertiesmake it a materialof choice...
|
Capacity : Copper Powder : 15,000 MT/Annum |
Plant and Machinery cost: Rs 307 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 31.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project: Rs3050 lakhs |
|
Cost of Project : 305000000 |
Manganese is a key component in the production of steel. Although classified as a minor metal, the quantity of manganese produced worldwide each year...
|
Capacity : Manganese Metal: 15,000 MT/Annum |
Plant and Machinery cost: Rs 663 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project : Rs 2553 lakhs |
|
Cost of Project : 255300000 |
A solar cell, sometimes called a photovoltaic cell, is a device that converts light energy into electrical energy.Solar panels generate free power fro...
|
Capacity : Poly Crystaline Solar PV Modules Cap10 Watt: 1,200,000 Nos/Annum Poly Crystaline Solar PV Module Cap. 20 Watt: 600,000 Nos/Annum Poly Crystaline Solar PV Module Cap. 50 Watt:240,000Nos/Annum Poly Crystaline Solar PV Module Cap. 100 Watt: 150,000Nos/Annum |
Plant and Machinery cost: Rs 1225 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs 1674 lakhs |
|
Cost of Project : 167400000 |
A solar cell, sometimes called a photovoltaic cell, is a device that converts light energy into electrical energy. Solar panels generate free power fr...
|
Capacity : Poly Crystaline Solar PV Modules (10, 20, 50,100 & 300 Watt): 74,00,000 Nos per annum Solar Inverters (Grid Tie String Inverters 1, 10, 30, 50 & 60 KVA) & (Solar Hydrid Inverters 1, 30, 60, 100 & 120 KVA: 7200 Nos per annum Solar Pump Controller |
Plant and Machinery cost: 2162.88 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 31.00 |
TCI : Cost of Project: Rs. 21918 |
|
Cost of Project : 2191800000 |
Cycling is amongst the most sustainable modes of mobility, which has zero dependence on fossil fuels and zero emissions unlike the motorized modes of...
|
Capacity : Bicycle Tyres : 450000 Pcs/annum Bicycle Tubes : 450000 Pcs/annum |
Plant and Machinery cost: 405 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: 646 lakhs |
|
Cost of Project : 64600000 |