Angola, which is abundant in hydrocarbons, minerals, fertile land and marine resources, is striving to focus on the diversification of the economy from oil. The most promising prospects include agribusiness, fisheries, mineral processing, renewable sources of power and logistics. The combination of a strategic geographic location, raw material resources, and attractive investment policies turns Angola into a country of extensive opportunities for innovative SMEs and project investors.
Economic drivers (regional trade, location, GDP growth, infrastructure):
Following Angola’s economy close to real GDP growth of 4.4% in 2024, more than 4% generated by the agriculture, mining and commerce sectors due to non-oil sectors, the government pursued more intense that diversification, because more it depends less than 33 Domergue and Gourdon of the total budget comes oil-related allocations. Angola’s Atlantic Ocean location, Southern Africa and the trade routes and neighboring the Export includes many natural resources.
Logistics & workforce availability:
Moreover, Angola is developing logistics corridors, such as the Lobito Corridor railway, which will connect the country with the Democratic Republic of the Congo. It plans the development of inland export flows. Angola has a young population and improves vocational and technical training to benefit industrial sectors.
Availability of Raw Materials and Supporting Inputs
Angola’s resource base is diverse:
These raw materials provide feedstock for value-added processing. However, specialized inputs, machinery, chemicals and precision components may remain import-dependent—requiring careful supply chain planning.
Investing in these sectors in Angola offers multiple advantages:
Angola’s economy shows steady diversification and growing demand across key sectors.
All the above trends result in the annual growth of 5-9% in the next three years in almost all non-oil sectors in Angola due to expanding infrastructure, import substitution, and growth of FDI.
Each project offers scalability based on capital, local infrastructure and market linkage.
Angola is presenting an opportunity at a critical inflection point: abundant natural resources, policy reforms, infrastructure investments and diversification plans coalesce to form an attractive backdrop for industrial and project investments. By structuring the execution in a disciplined manner with appropriate planning, risk cover and phased execution, investors and entrepreneurs can capitalize on high-opportunity sectors such as agribusiness, fisheries, processing, renewables and logistics.
Please choose a project below related to this category.
Solar Panels are in general Silicon made Rectangular Shaped Glass Covered Products which Produce Electricity when exposed to the Sun. These Panels pro...
|
Capacity : Solar PV Module (240 watt) : 350 Nos/day (25 MW) |
Plant and Machinery cost: Rs 278 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of project: Rs 852 Lakhs |
|
Cost of Project : 85200000 |
Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active compound (Surfactant)...
|
Capacity : 4MT/Day |
Plant and Machinery cost: Rs 18 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project:Rs 228 Lakhs |
|
Cost of Project : 22800000 |
A bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. A bicycle rider is cal...
|
Capacity : Bicycles (Different Sizes):2000 Nos./Day |
Plant and Machinery cost: Rs 270 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.39 |
|
Break Even Point (BEP): 31.24 |
TCI : Cost of Project:Rs 3972 Lakhs |
|
Cost of Project : 397200000 |
Copper makes vital contributions to sustaining and improving society. Copper's chemical, physical and aesthetic properties make it a material of choic...
|
Capacity : Copper Powder:3.33 MT/Day |
Plant and Machinery cost: Rs 46 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.33 |
|
Break Even Point (BEP): 63.22 |
TCI : Cost of Project:Rs 321 Lakhs |
|
Cost of Project : 32100000 |
It is needless to mention that water, a compound of Hydrogen and Oxygen is a precious natural gift which is very essential for survival of mankind inc...
|
Capacity : Packaged Drinking Water (1 Ltr. Size):120000 |
Plant and Machinery cost: Rs 65 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project:Rs 268 Lakhs |
|
Cost of Project : 26800000 |
Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active compound (Surfactant)...
|
Capacity : 4MT/Day |
Plant and Machinery cost: Rs 18 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project:Rs 228 Lakhs |
|
Cost of Project : 22800000 |
Agricultural wastes constitute one of the main alternative raw materials for the pulp and paper industry. Wheat straw, bagasse, reed, and rice straw a...
|
Capacity : •Disposable Paper Cups :7.5 MT/Day •Disposable Paper Plates:7.5 MT/Day |
Plant and Machinery cost: Rs 32 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.18 |
|
Break Even Point (BEP): 56.37 |
TCI : Cost of Project: Rs 314 Lakhs |
|
Cost of Project : 31400000 |
Bicycle tubes are the backbone of the bicycle industries. Few numbers of companies in organized sector are engaged in the quality grade cycles tyres a...
|
Capacity : Bicycle Tubes: 10,000 Nos. /Day |
Plant and Machinery cost: Rs 118 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project: Rs 622 Lakhs |
|
Cost of Project : 62200000 |
A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provide enough power to be usefu...
|
Capacity : Solar Panel 5MW/Annum |
Plant and Machinery cost: Rs 109 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project: Rs 450 Lakhs |
|
Cost of Project : 45000000 |
Bicycle and rickshaw tyres & tubes are the backbone of the bicycle and rickshaw. There are few numbers of organized manufacturing companies which are...
|
Capacity : Rickshaw & Cycle Tyres : 1,500.00 Nos./Day,Rickshaw & Cycle Tubes: 1,500.00 Nos./Day |
Plant and Machinery cost: 128 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 72.00 |
TCI : Cost of Project : 570 Lakhs |
|
Cost of Project : 57000000 |
Copper is mankind’s oldest metal, dating back some 10,000 years. All of the great civilizations of the past used copper and copper alloys (principally...
|
Capacity : Copper Ingot: 8 MT/Day, Copper Rod: 36 MT/Day, Copper Wire: 4 MT/Day |
Plant and Machinery cost: Rs. 278 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 62.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : Rs. 1201 Lakhs |
|
Cost of Project : 120100000 |
Copper is one of the most widespread materials used in the production of electronic equipment and found in multiple appliances as, e.g. circuit boards...
|
Capacity : 10000 MT /Annum |
Plant and Machinery cost: Rs.132 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 66.00 |
TCI : Cost of Project : Rs.1208 Lakhs |
|
Cost of Project : 120800000 |