Best Business Opportunities in Somalia, Africa - Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship Projects

Please choose a project below related to this category.

Naphthalene from Coal Tar & Petroleum Waste
Naphthalene from Coal Tar & Petroleum Waste

Naphthalene is an organic compound with formula C10H8. It is the simplest polycyclic aromatic hydrocarbon, and is a white crystalline solid with a cha...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Matchbox Manufacturing Business
Matchbox Manufacturing Business

Matchbox Manufacturing Business. Start a Match Box, Matchstick Factory. Safety Matches Production Matchsticks are a very handy tool used in starting...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Gypsum Mining for Production of Plaster of Paris Powder
Gypsum Mining for Production of Plaster of Paris Powder

Gypsum is a soft sulfate mineral composed of calcium sulfate dihydrate, with the chemical formula CaSO4•2H2O. It is widely mined and is used as a fert...

Capacity :

Gypsum Powder: 4800 MT/Day Plaster of Paris Powder: 7200 MT/Day

Plant and Machinery cost:

Rs. 3387 Crores

Working Capital :

-

Rate of Return (ROR):

16.00

Break Even Point (BEP):

50.00

TCI :

Cost of Project: Rs.3948 Crores

Cost of Project :

39480000000

Bioplastic Carry Bags and Garbage Bags
Bioplastic Carry Bags and Garbage Bags

BioPlastic shopping bags, carrier bags, or plastic grocery bags are a type of bioplastic bag used as shopping bags and made from various kinds of biop...

Capacity :

Bioplastic Carry Bags (8"x16") Size: 3500 Kgs/Day Bioplastic Garbage Bags (950x810 mm) Size: 1500 Kgs/Day

Plant and Machinery cost:

Rs. 62lakhs

Working Capital :

-

Rate of Return (ROR):

30.00

Break Even Point (BEP):

60.00

TCI :

Cost of Project: Rs 396 lakhs

Cost of Project :

39600000

Bioplastic Film
Bioplastic Film

Biodegradable plastics are the type of plastics that undergo decomposition over a period of time under composting conditions.A bioplastic is a plastic...

Capacity :

Bioplastic Film 25 Micron: 5000Kgs/Day

Plant and Machinery cost:

Rs. 184 lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

60.00

TCI :

Cost of Project: Rs. 616 lakhs

Cost of Project :

61600000

Production of Bioplastic Film using Biodegradable Resin, PLA (Polylactic Acid)
Production of Bioplastic Film using Biodegradable Resin, PLA (Polylactic Acid)

Production of Bioplastic Film using Biodegradable Resin, PLA (Polylactic Acid). Biodegradable Film Manufacturing Business - Sustainable Alternative to...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Bioplastic Film
Bioplastic Film

Plastic materials have made entry in every sphere of human life because of its superior characteristics such as durability, strengths, shape and molda...

Capacity :

Bioplastic Film 25 Micron: 1,500,000 Kgs per Annum

Plant and Machinery cost:

185 Lakhs

Working Capital :

-

Rate of Return (ROR):

28.00

Break Even Point (BEP):

60.00

TCI :

Cost of Project: 617 Lakhs

Cost of Project :

61700000

Bioplastic Carry Bags and Garbage Bags Production
Bioplastic Carry Bags and Garbage Bags Production

Bioplastic Carry Bags and Garbage Bags Production. Biodegradable, Compostable and Eco-Friendly Carry Bags and Trash Bags Manufacturing Business P...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Bioplastic Carry Bags and Garbage Bags
Bioplastic Carry Bags and Garbage Bags

BioPlastic shopping bags, carrier bags, or plastic grocery bags are a type of bioplastic bag used as shopping bags and made from various kinds of biop...

Capacity :

Bioplastic Carry Bags (8"x16") Size: 3,500 Kgs per day Bioplastic Garbage Bags (950x810 mm) Size: 1,500 Kgs per day

Plant and Machinery cost:

62 Lakhs

Working Capital :

-

Rate of Return (ROR):

30.00

Break Even Point (BEP):

59.00

TCI :

Cost of Project: 396 Lakhs

Cost of Project :

39600000

Gypsum Plaster Board
Gypsum Plaster Board

Gypsum Plaster Boards are constructional sheets composed of consigned Gypsum with about 15% fibre. Its outstanding contributes are fire resistance, di...

Capacity :

Gypsum Plaster Board: 13333 Sq.mt./Day

Plant and Machinery cost:

Rs. 476 lakhs

Working Capital :

-

Rate of Return (ROR):

34.00

Break Even Point (BEP):

33.00

TCI :

Cost of Project: Rs 3394 lakhs

Cost of Project :

339400000

E-Rickshaw Assembling
E-Rickshaw Assembling

E-Rickshaws are three wheel battery operated vehicles, which are considered as an upgrade to conventional rickshaws, and economically better than auto...

Capacity :

E Rickshaw: 4 Nos./Day

Plant and Machinery cost:

Rs. 28 lakhs

Working Capital :

-

Rate of Return (ROR):

24.00

Break Even Point (BEP):

56.00

TCI :

Cost of Project: Rs. 323 lakhs

Cost of Project :

32300000

Gypsum Mining Business
Gypsum Mining Business

Gypsum Mining Business. Investment and Business Opportunity in Mineral & Mining Sector Gypsum is an evaporite mineral most commonly found in laye...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Make An Appointment

Talk to Our Experts Today!

appoinment
Call Us WhatsApp