Profile Water forms an essential part of every human being. Since it is a human necessity it makes best sense to do business in. As a normal human b...
|
Capacity : - |
Plant and Machinery cost: 131 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : 350 Lakh |
|
Cost of Project : 35000000 |
Profile Single super phosphate is a highly demanded fertilizer mostly used at the time of preparation of land. It comprises of 16% water soluble phos...
|
Capacity : 150000 MT/ Annum |
Plant and Machinery cost: 1621 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 40.00 |
TCI : Cost of Project : 2998 Lakh |
|
Cost of Project : 299800000 |
Product Profile Lithium hexafluorophosphate (LiPF6) is a typical electrolyte salt for lithium-ion batteries. Lithium hexafluorophosphate is an inorga...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 0.01 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
PRODUCT PROFILE: Sodium triphosphate (STP) is an inorganic compound with formula Na5P3O10. It is the sodiumsalt of the polyphosphate penta anion, w...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Coal tar is a brown or black liquid of high viscosity, which smells of naphthalene and aromatic hydro carbons. Coal tar is among the byproducts when c...
|
Capacity : - |
Plant and Machinery cost: 1531 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Cost of Project : 3068 Lakhs |
|
Cost of Project : 306800000 |
Iron ore pellets are spheres of typically 8-18mm (0.31-0.71 inch) to be used as raw material for blast furnace. They typically contain 67 to 72% Fe an...
|
Capacity : 1200000 MT/Annum |
Plant and Machinery cost: 3801 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : 6183 Lakhs |
|
Cost of Project : 0 |
Iron ore pellets are spheres of typically 8-18mm (0.31-0.71 inch) to be used as raw material for blast furnace. They typically contain 67-72% Fe and v...
|
Capacity : 1200000 MT/Annum |
Plant and Machinery cost: 3801 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : 6183 Lakhs |
|
Cost of Project : 0 |
Tyres and Tubes are the backbone of the bicycle and rickshaw. Bicycle and rickshaw continues to be the principal mode of transport for the low and mid...
|
Capacity : 300000 Nos. Tyres & 300000 Nos. Tubes |
Plant and Machinery cost: 158 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 351 Lakhs |
|
Cost of Project : 0 |
A toothpick is a small stick of wood, plastic, bamboo, metal, bone or other substance used to remove detritus from the teeth, usually after a meal. A...
|
Capacity : - |
Plant and Machinery cost: 6 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 62.00 |
TCI : 22 Lakhs |
|
Cost of Project : 0 |
Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...
|
Capacity : - |
Plant and Machinery cost: 25 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 54.00 |
TCI : 100 Lakhs |
|
Cost of Project : 0 |
Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...
|
Capacity : 3000000 Bottles/Annum |
Plant and Machinery cost: 39 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : 108 Lakhs |
|
Cost of Project : 0 |
Power Generation is an essential requirement of economic growth of a country. A weak power infrastructure does not lead to the growth potential and pu...
|
Capacity : 500 MW |
Plant and Machinery cost: 143200 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 56.00 |
|
Break Even Point (BEP): 25.00 |
TCI : Cost of Project : 158700 Lakhs |
|
Cost of Project : 0 |