Please choose a project below related to this category.
Waste is now a global problem, and one that must be addressed in order to solve the world's resource and energy challenges. Plastics are made from lim...
|
Capacity : Plastic Granules 4500 Kgs/Day |
Plant and Machinery cost: Rs 43 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 64.52 |
TCI : Cost of Project : Rs 219 Lakhs |
|
Cost of Project : 21900000 |
Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active compound (Surfactant)...
|
Capacity : 4MT/Day |
Plant and Machinery cost: Rs 18 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project:Rs 228 Lakhs |
|
Cost of Project : 22800000 |
A bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. A bicycle rider is cal...
|
Capacity : Bicycles (Different Sizes):2000 Nos./Day |
Plant and Machinery cost: Rs 270 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.39 |
|
Break Even Point (BEP): 31.24 |
TCI : Cost of Project:Rs 3972 Lakhs |
|
Cost of Project : 397200000 |
It is needless to mention that water, a compound of Hydrogen and Oxygen is a precious natural gift which is very essential for survival of mankind inc...
|
Capacity : Packaged Drinking Water (1 Ltr. Size):120000 |
Plant and Machinery cost: Rs 65 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project:Rs 268 Lakhs |
|
Cost of Project : 26800000 |
Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active compound (Surfactant)...
|
Capacity : 4MT/Day |
Plant and Machinery cost: Rs 18 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project:Rs 228 Lakhs |
|
Cost of Project : 22800000 |
Agricultural wastes constitute one of the main alternative raw materials for the pulp and paper industry. Wheat straw, bagasse, reed, and rice straw a...
|
Capacity : •Disposable Paper Cups :7.5 MT/Day •Disposable Paper Plates:7.5 MT/Day |
Plant and Machinery cost: Rs 32 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.18 |
|
Break Even Point (BEP): 56.37 |
TCI : Cost of Project: Rs 314 Lakhs |
|
Cost of Project : 31400000 |
Bicycle tubes are the backbone of the bicycle industries. Few numbers of companies in organized sector are engaged in the quality grade cycles tyres a...
|
Capacity : Bicycle Tubes: 10,000 Nos. /Day |
Plant and Machinery cost: Rs 118 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project: Rs 622 Lakhs |
|
Cost of Project : 62200000 |
E-waste is a popular, informal name for electronic products nearing the end of their "useful life." Computers, televisions, VCRs, stereos, copiers, an...
|
Capacity : Monitors:10 Nos./Day•Plastic Granules: 4,600.00 Kgs/Day •Copper Wire Scraps:20 Kgs/Day •Glass from CRT: 260 Kgs/Day • Other Metals:1100 Kgs/Day |
Plant and Machinery cost: Rs 233 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 8.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: Rs 613 Lakhs |
|
Cost of Project : 61300000 |
A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provide enough power to be usefu...
|
Capacity : Solar Panel 5MW/Annum |
Plant and Machinery cost: Rs 109 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project: Rs 450 Lakhs |
|
Cost of Project : 45000000 |
Bicycle and rickshaw tyres & tubes are the backbone of the bicycle and rickshaw. There are few numbers of organized manufacturing companies which are...
|
Capacity : Rickshaw & Cycle Tyres : 1,500.00 Nos./Day,Rickshaw & Cycle Tubes: 1,500.00 Nos./Day |
Plant and Machinery cost: 128 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 72.00 |
TCI : Cost of Project : 570 Lakhs |
|
Cost of Project : 57000000 |
Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...
|
Capacity : Monitor : 3000 Pcs. /annum,Plastic Dana: 1559 MT/annum,Copper Wire Scraps: 7.5 MT/annum,Glass from CRT : 105 MT/annum,Other Metals: 450 MT/annum |
Plant and Machinery cost: Rs. 233 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : Rs. 526 Lakhs |
|
Cost of Project : 52600000 |
Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or disc...
|
Capacity : 2164500 Kgs /Annum |
Plant and Machinery cost: Rs. 233 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : Rs. 526 Lakhs |
|
Cost of Project : 52600000 |