Please choose a project below related to this category.
Plastic materials have made entry in every sphere of human life because of its superior characteristics such as durability, strengths, shape and molda...
|
Capacity : Bioplastic Film 25 Micron: 1,500,000 Kgs per Annum |
Plant and Machinery cost: 185 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project: 617 Lakhs |
|
Cost of Project : 61700000 |
Bioplastic Carry Bags and Garbage Bags Production. Biodegradable, Compostable and Eco-Friendly Carry Bags and Trash Bags Manufacturing Business P...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
BioPlastic shopping bags, carrier bags, or plastic grocery bags are a type of bioplastic bag used as shopping bags and made from various kinds of biop...
|
Capacity : Bioplastic Carry Bags (8"x16") Size: 3,500 Kgs per day Bioplastic Garbage Bags (950x810 mm) Size: 1,500 Kgs per day |
Plant and Machinery cost: 62 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project: 396 Lakhs |
|
Cost of Project : 39600000 |
E-Rickshaws are three wheel battery operated vehicles, which are considered as an upgrade to conventional rickshaws, and economically better than auto...
|
Capacity : E Rickshaw: 4 Nos./Day |
Plant and Machinery cost: Rs. 28 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs. 323 lakhs |
|
Cost of Project : 32300000 |
Diamond is a solid form of carbon with a diamond cubic crystal structure. At room temperature and pressure it is metastable and graphite is the stable...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
E-Rickshaw (Electric tuk-tuks) Manufacturing Business. How to Start Electric Vehicle Assembling Industry E-Rickshaws are small vehicles, with thr...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Electric Rickshaw, in short, also called as E-Rickshaw. This kind of transport vehicle are famous in many countries, this is eco-friendly vehicles for...
|
Capacity : 1,200 Nos per Annum |
Plant and Machinery cost: 29 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: 324 Lakhs |
|
Cost of Project : 32400000 |
A solar panel is a collection of solar cells.Solar panel refers either to a photovoltaic module, a solar thermal energy panel, or to a set of solar ph...
|
Capacity : Solar Panel: 25 MW |
Plant and Machinery cost: Rs. 161 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 54.00 |
|
Break Even Point (BEP): 28.00 |
TCI : Rs.804 lakhs |
|
Cost of Project : 80400000 |
Investment Opportunity in Bicycle and Cycle Rickshaw Manufacturing Industry. Best Industry for Starting a Business. Bicycles are one of the world's m...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Investment Opportunity in Bicycle and Cycle Rickshaw Manufacturing Industry. Best Industry for Starting a Business. Bicycles are one of the world's m...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Electroplating is the process of coating one metal or metal object with a very thin layer of another metal, typically by applying a direct electric cu...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
The Gold is a relatively scarce yellow metal. Often found in the native State, which is the most malleable of all metals. It is extremely corrosion re...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |