Please choose a project below related to this category.
Dicalcium phosphate is of great interest to tooth paste manufactures. It is used in toothpaste in its anhydrous variety. Although this product is not...
|
Capacity : 3000 MT/Year |
Plant and Machinery cost: 11 Crores |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 32.00 |
TCI : Cost of Project : 13.6 Crores |
|
Cost of Project : 0 |
Iron ore pellets are used in blast / electric furnaces for producing sponge iron and steels. Market by high productivity, lower fuel consumption and...
|
Capacity : 1008000 MT/Annum |
Plant and Machinery cost: 138 Crores |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : 224 Crore |
|
Cost of Project : 0 |
Matchbox is one of the most important items. Though it is looked upon as small and insignificant, earlier it was a big problem. In the 17th century,...
|
Capacity : 50000 Nos. /Day |
Plant and Machinery cost: Rs. 5 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Rs. 29 Lakhs |
|
Cost of Project : 0 |
Disposable needle is widely used by doctors for injection purpose with the help of syringes. With the increase in population in our country, requirem...
|
Capacity : - |
Plant and Machinery cost: 147 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : 426 Lakhs |
|
Cost of Project : 0 |
-
|
Capacity : 1000 Dozen/Day |
Plant and Machinery cost: Rs. 9 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 67.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Rs. 19 Lakhs |
|
Cost of Project : 0 |
Broadly speaking a fertilizer or manure, may be interpreted to mean anything that will increase the yield of a crop is added to the soil. Generally...
|
Capacity : 20 Ton / Day |
Plant and Machinery cost: 100 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 468 Lakh |
|
Cost of Project : 0 |
Iron ore pellets are used in blast furnaces for producing sponge iron & steels. Marked by high productivity lower fuel consumption and improved furnac...
|
Capacity : 6000 MT / Annum |
Plant and Machinery cost: 187 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : 479 Lakhs |
|
Cost of Project : 0 |
Carpentry and joinery are common terms used with any class of work with wood. Strictly speaking carpentry deals with all works of a carpentry such as...
|
Capacity : 80 Pcs./day |
Plant and Machinery cost: 10 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 42.00 |
TCI : 93 Lakhs |
|
Cost of Project : 0 |
The Pharmaceutical Industry in general is well managed in sound economic principles and has excellent techniques of production, technological backing...
|
Capacity : - |
Plant and Machinery cost: 43 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : 125 Lakhs |
|
Cost of Project : 0 |
Zinc sulphate which is also known as “white vitriolâ€, is a widely used chemical. Basically it is being manufactured by using zinc dust or zinc dr...
|
Capacity : 5 Ton / Day |
Plant and Machinery cost: 33 Lakh |
|
Working Capital : |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 45.00 |
TCI : 121 Lakh (W/C one month) |
|
Cost of Project : 0 |
Castings of suitable shape and size intended for subsequent hot working are termed as ingots. Ingot iron has very low carbon in steel. This is general...
|
Capacity : 60,000 MT / Annum |
Plant and Machinery cost: 4012 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 30.00 |
TCI : 6454 Lakhs |
|
Cost of Project : 0 |
Bisleri, which pioneered the packaged drinking water business in India, catering to consumers need to have hygienic drinking water while on the move...
|
Capacity : 30,000 Thousand Nos./Annum or 1,00,000 Bottles /day |
Plant and Machinery cost: Rs. 105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project Rs. 282 Lakhs |
|
Cost of Project : 0 |