Please choose a project below related to this category.
The tissues paper sector has boomed over the last few years. With a move to more luxurious tissue paper and ultra-absorbent paper towels the industry...
|
Capacity : Toilet Paper Rolls : 7,200,000 Nos./annum Paper Napkin (100 Pcs.): 558,000 Nos./annum Facial Tissue |
Plant and Machinery cost: 59 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project 341 Lakhs |
|
Cost of Project : 34100000 |
Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active compound (Surfactant)...
|
Capacity : Detergent Cake:180,000Kgs/annum Detergent Powder:180,000Kgs/annum |
Plant and Machinery cost: Rs 15 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 76.00 |
TCI : Cost of Project : Rs 36 lakhs |
|
Cost of Project : 3600000 |
Lead is a material very easy to recycle and, provided that adequate procedures are implemented; the ?nal product (secondary lead) is indistinguishable...
|
Capacity : Lead Ingot: 1944 MT/annum |
Plant and Machinery cost: Rs 66 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: Rs 257 lakhs |
|
Cost of Project : 25700000 |
Micronutrients are elements which are essential for plant growth, but are required in much smaller amounts than those of the primary nutrients; nitrog...
|
Capacity : Micronutrient Fertilizer for Fruits: 187,500 Kgs/annum Micronutrient Fertilizer for Vegetables: 112,500 Kgs/annum |
Plant and Machinery cost: Rs 23 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 76.00 |
TCI : Cost of Project: Rs 114 lakhs |
|
Cost of Project : 11400000 |
Biofertilizers are cost effective, eco-friendly and when they are required in bulk can be generated at the farm itself. They increase crop yield upto...
|
Capacity : Bio Fertilizer (Liquid): 60,000 Ltrs/Annum Bio Fertilizer (solid):60,000 Kgs/Annum Micronutrients (Liquid): 48,000 Ltrs/Annum Micronutrients (solid): 60,000 Kgs/Annum Organic Fertlizier (Liquid):60,000 Ltrs/Annum Organic Fertlizier (Solid): 48,000 Kgs/Ann |
Plant and Machinery cost: Rs 42 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : Rs 122 lakhs |
|
Cost of Project : 12200000 |
The tissues paper sector has boomed over the last few years. With a move to more luxurious tissue paper and ultra-absorbent paper towels the industry...
|
Capacity : Toilet Paper Rolls: 7,200,000 Nos./annum Paper Napkin (100 Pcs.): 558,000 Nos./annum Facial Tissue (100 Pcs.): 1,251,000 Nos./annum |
Plant and Machinery cost: Rs 59 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project : Rs 341 lakhs |
|
Cost of Project : 34100000 |
Electronic wastes, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a description of surplus, obsolete, broken or discarded el...
|
Capacity : Copper Wire: 500mt/annum Plastic Granules: 2230mt/annum Glass: 970mt/annum Ferrous Metal: 800mt/annum Monitors (Repair): 3000mt/annum |
Plant and Machinery cost: Rs 132 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project: Rs 518 lakhs |
|
Cost of Project : 51800000 |
A solar cell, sometimes called a photovoltaic cell, is a device that converts light energy into electrical energy.Solar panels generate free power fro...
|
Capacity : Poly Crystaline Solar PV Modules Cap10 Watt: 1,200,000 Nos/Annum Poly Crystaline Solar PV Module Cap. 20 Watt: 600,000 Nos/Annum Poly Crystaline Solar PV Module Cap. 50 Watt:240,000Nos/Annum Poly Crystaline Solar PV Module Cap. 100 Watt: 150,000Nos/Annum |
Plant and Machinery cost: Rs 1225 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs 1674 lakhs |
|
Cost of Project : 167400000 |
A solar cell, sometimes called a photovoltaic cell, is a device that converts light energy into electrical energy. Solar panels generate free power fr...
|
Capacity : Poly Crystaline Solar PV Modules (10, 20, 50,100 & 300 Watt): 74,00,000 Nos per annum Solar Inverters (Grid Tie String Inverters 1, 10, 30, 50 & 60 KVA) & (Solar Hydrid Inverters 1, 30, 60, 100 & 120 KVA: 7200 Nos per annum Solar Pump Controller |
Plant and Machinery cost: 2162.88 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 31.00 |
TCI : Cost of Project: Rs. 21918 |
|
Cost of Project : 2191800000 |
A primer is a preparatory coating put on materials before painting. Priming ensures better adhesion of paint to the surface, increases paint durabilit...
|
Capacity : 360,000Ltrs/Annum |
Plant and Machinery cost: Rs. 13 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 0.00 |
TCI : Cost of Project : Rs. 42 lakhs |
|
Cost of Project : 4200000 |
Cycling is amongst the most sustainable modes of mobility, which has zero dependence on fossil fuels and zero emissions unlike the motorized modes of...
|
Capacity : Bicycle Tyres : 450000 Pcs/annum Bicycle Tubes : 450000 Pcs/annum |
Plant and Machinery cost: 405 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: 646 lakhs |
|
Cost of Project : 64600000 |
Solar Panels are in general Silicon made Rectangular Shaped Glass Covered Products which Produce Electricity when exposed to the Sun. These Panels pro...
|
Capacity : Solar PV Module (240 watt) : 350 Nos/day (25 MW) |
Plant and Machinery cost: Rs 278 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of project: Rs 852 Lakhs |
|
Cost of Project : 85200000 |