Please choose a project below related to this category.
Manufacturing Business of Medical Disposables. IV Cannula. Cannula Manufacturing System The IV cannula itself is a small flexible tube that surro...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
A bio fertilizer (also bio-fertilizer) is a substance which contains living microorganisms which, when applied to seeds, plant surfaces, or soil, colo...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Production of Bioplastic Products. Biodegradable and Bio-Plastics Products Manufacturing Business. Glasses, Plates and Bags Manufacturing Project....
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Zinc oxide is an inorganic compound with the formula ZnO. ZnO is a white powder that is insoluble in water, and it is widely used as an additive in nu...
|
Capacity : Zinc Oxide: 16 MT/Day |
Plant and Machinery cost: 351 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project : Rs 833 lakhs |
|
Cost of Project : 83300000 |
Production of PROM (Phosphate Rich Organic Manure): An Emerging Biofertilizer, Manufacturing of PROM Fertilizer - Toward a Sustainable Agriculture...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Surgical gowns are worn by doctors and nurses in the operating theater to address a dual function of preventing transfer of microorganisms and body fl...
|
Capacity : Surgeon Gowns: 250 Pcs./Day Pateint Gowns: 300 Pcs./Day Pillow Covers: 700 Pcs./Day Surgeon Caps: 1000 Pcs./Day |
Plant and Machinery cost: 204 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs 492 lakhs |
|
Cost of Project : 49200000 |
A Bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. Bicycles are one of th...
|
Capacity : Bicycles (Different Sizes): 1000 Nos. /Day Cycle Rickshaw: 1000 Nos. Day |
Plant and Machinery cost: Rs 336 lakhs |
|
Working Capital : 0 |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project: Rs 1525 lakhs |
|
Cost of Project : 152500000 |
Phosphates play a vital role in the balanced nutrition of plants. Most of the soils in India are low to medium in phosphate (P) content which requires...
|
Capacity : Phosphate Rich Organic Manure (PROM): 1000000 MT /Annum |
Plant and Machinery cost: Plant & Machinery: Rs 290 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project : Rs 4612 lakhs |
|
Cost of Project : 461200000 |
Bicycles are one of the oldest forms of transportation. Even today millions of people travel by bicycle daily to their work, college, universities and...
|
Capacity : Bicycles (Different Sizes): 2000 Nos./day |
Plant and Machinery cost: 336 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs 1589 lakhs |
|
Cost of Project : 158900000 |
A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provide enough power to be usefu...
|
Capacity : 25,000 KW/annum |
Plant and Machinery cost: 449 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project 1126 lakhs |
|
Cost of Project : 112600000 |
A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provide enough power to be usefu...
|
Capacity : SOLAR PANEL:25,000Units/annumELECTRONIC TOYS:1,500,000 Units/annum |
Plant and Machinery cost: 498 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project: Rs 1348 lakhs |
|
Cost of Project : 0 |
Micronutrients are elements which are essential for plant growth, but are required in much smaller amounts than those of the primary nutrients; nitrog...
|
Capacity : Micronutrient Fertilizer for Fruits : 187,500 Kgs/annum Micronutrient Fertilizer for Vegeta.... |
Plant and Machinery cost: 23 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 76.00 |
TCI : Cost of Project 114 Lakhs |
|
Cost of Project : 11400000 |