Please choose a project below related to this category.
Matchbox is one of the most important items. Though it is looked upon as small and insignificant, earlier it was a big problem. In the 17th century,...
|
Capacity : 50000 Nos. /Day |
Plant and Machinery cost: Rs. 5 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Rs. 29 Lakhs |
|
Cost of Project : 0 |
Manganese sulphate is commercially one of the most important compounds. It is an important mineral based chemical industry. The main constituent of t...
|
Capacity : 2.00 MT / Day |
Plant and Machinery cost: 31 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 1.26 Crore |
|
Cost of Project : 0 |
Sponge iron is the product created when iron ore is reduced to metallic iron, usually with some kind of carbon (charcoal, etc), at temperatures below...
|
Capacity : 135000 MT / Annum |
Plant and Machinery cost: 7175 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 25.00 |
TCI : Cost of Project : 8923 Lakhs |
|
Cost of Project : 0 |
Iron oxides are extensively used in the preparation of paints. There are two main stains yellow and red. Both these varieties are available in synthe...
|
Capacity : 5 MT/ Day |
Plant and Machinery cost: 80 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 42.00 |
TCI : 4 Crores |
|
Cost of Project : 0 |
Disposable needle is widely used by doctors for injection purpose with the help of syringes. With the increase in population in our country, requirem...
|
Capacity : - |
Plant and Machinery cost: 147 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : 426 Lakhs |
|
Cost of Project : 0 |
For vacuum distillation of crude coal tar, the crude coal tar is produced from coke ovens of steel plant, 50% of this crude coal tar is pitch. The cr...
|
Capacity : 7500 MT / Annum |
Plant and Machinery cost: Rs. 137 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : 320 Lakhs |
|
Cost of Project : 0 |
Bio coal briquette is an ideal and best ready substitute to coal, fire wood, lignite etc. and easily replaces these conventional fuels for heating, s...
|
Capacity : 16 Ton / Day |
Plant and Machinery cost: 23 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 53.00 |
TCI : 89 Lakhs |
|
Cost of Project : 0 |
There are various processes by which metal can be shaped such as forging, extrusions, pressing, welding, rolling and costing. Among the various proce...
|
Capacity : 18000 MT / Annum |
Plant and Machinery cost: 173 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project : 499 Lakhs |
|
Cost of Project : 0 |
Chromium is the 21st most abundant metal in the Earths crust. The only commercial ore of chromium is the chromite. Most chromite ores are rich enough...
|
Capacity : 30,000 MT/ Annum each ores |
Plant and Machinery cost: 896 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : 3528 Lakhs |
|
Cost of Project : 0 |
Iron ore pellets are used in blast furnaces for producing sponge iron & steels. Marked by high productivity lower fuel consumption and improved furnac...
|
Capacity : 6000 MT / Annum |
Plant and Machinery cost: 187 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : 479 Lakhs |
|
Cost of Project : 0 |
Carpentry and joinery are common terms used with any class of work with wood. Strictly speaking carpentry deals with all works of a carpentry such as...
|
Capacity : 80 Pcs./day |
Plant and Machinery cost: 10 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 42.00 |
TCI : 93 Lakhs |
|
Cost of Project : 0 |
The Pharmaceutical Industry in general is well managed in sound economic principles and has excellent techniques of production, technological backing...
|
Capacity : - |
Plant and Machinery cost: 43 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : 125 Lakhs |
|
Cost of Project : 0 |