Best Business Opportunities in Zambia, Africa - Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship Projects

Please choose a project below related to this category.

Pentane (Low Boiling Hydrocarbon Varied Application) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Plant Layout
Pentane (Low Boiling Hydrocarbon Varied Application) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Plant Layout

To make a product suitable for sale, the various contaminants and undesirable constituents contained in the raw gas must be removed. The first step is...

Capacity :

Pentane 6462 MT/Annum, Isopentane 5538 MT/Annum, Powder in Megawatt 540 MW/Annum, Residual Natural Gas 959220 MT/Annum

Plant and Machinery cost:

78 Crores

Working Capital :

-

Rate of Return (ROR):

42.00

Break Even Point (BEP):

43.00

TCI :

154 Crores

Cost of Project :

0

PIG IRON - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics
PIG IRON - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics

Today we find iron and steels of so many types and their products so wide spread all around, that it is hard to think if the world could progress any...

Capacity :

10 Lakhs MT/Day

Plant and Machinery cost:

38 Crores

Working Capital :

-

Rate of Return (ROR):

48.00

Break Even Point (BEP):

29.00

TCI :

388 Crores

Cost of Project :

0

Synthetic Iron Oxide - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Synthetic Iron Oxide - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Synthetic iron oxides possess good tinting strength and excellent hiding powder. It is also light fast, resistant to alkalies and is available in yell...

Capacity :

5.00 MT/day

Plant and Machinery cost:

Rs. 61 Lakhs

Working Capital :

-

Rate of Return (ROR):

45.00

Break Even Point (BEP):

40.00

TCI :

Rs. 286 Lakhs

Cost of Project :

0

Low Carbon Ferro Manganese - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Low Carbon Ferro Manganese - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Low carbon ferro manganese is made by reaction of silicon present in silicon manganese or low carbon manganese with manganese ore and lime. These cann...

Capacity :

50.00 MT/day

Plant and Machinery cost:

Rs. 120 Lacs

Working Capital :

-

Rate of Return (ROR):

75.00

Break Even Point (BEP):

34.00

TCI :

Rs. 1300 Lacs

Cost of Project :

0

Paper Napkins, Facial Paper & Toilet Rolls From Tissue Paper Rolls - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study
Paper Napkins, Facial Paper & Toilet Rolls From Tissue Paper Rolls - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study

Due to Govt. emphasis for popularizing tourism, number of new hotels, holiday resorts, restaurants etc. have demand of paper conversion products like...

Capacity :

2 Mt Toilet Rolls, 2 Mt Facial Paper, 6 Mt Paper Napkin (Per Day)

Plant and Machinery cost:

Rs. 41 Lakhs

Working Capital :

-

Rate of Return (ROR):

69.00

Break Even Point (BEP):

23.00

TCI :

Rs. 600 Lakhs

Cost of Project :

0

Disposable Plastic Cups, Plates and Glasses
Disposable Plastic Cups, Plates and Glasses

The plastic in India plays a very important key role in industrialization. A wide spectrum of plastics and its articles have touched the life of every...

Capacity :

50,000 Plastic Glass, 25,000 Plastic Cups

Plant and Machinery cost:

25 Lakhs

Working Capital :

-

Rate of Return (ROR):

39.00

Break Even Point (BEP):

51.00

TCI :

69 Lakhs

Cost of Project :

0

Pig Iron - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics
Pig Iron - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics

Pig Iron is a raw material for all the iron and steel based industries and hence, required to be responsive to the requirements of pig iron users. Pig...

Capacity :

10 Lakh MT/Month

Plant and Machinery cost:

38 Crores

Working Capital :

-

Rate of Return (ROR):

49.00

Break Even Point (BEP):

29.00

TCI :

388 Crores

Cost of Project :

0

Iron Ore Mining - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Layout
Iron Ore Mining - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Layout

Iron is an Anglo-Saxon Word : the symbol Fe, comes from latin ferrum. The use of iron has been known since the earliest times; it was prepared by the...

Capacity :

139 Lakh MT/Annum

Plant and Machinery cost:

1030 Lakhs

Working Capital :

-

Rate of Return (ROR):

37.00

Break Even Point (BEP):

38.00

TCI :

1163 Lakhs(Cost of Project)

Cost of Project :

0

Coal Mining - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics
Coal Mining - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics

Coal is an extremely heterogeneous, complex material that is difficult to characterize. Coal is a rock formed by geological process and is composed of...

Capacity :

1350 Lakh MT/Annum (Job Work)

Plant and Machinery cost:

752 Crores

Working Capital :

-

Rate of Return (ROR):

41.00

Break Even Point (BEP):

42.00

TCI :

972 Crores

Cost of Project :

0

Cobalt Octoate - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economic
Cobalt Octoate - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economic

Cobalt Octoate is a very important compound having chemical formulas as such. CH3 | (CH2- CH2- CH2- CH2- CH- COOH)2CO The I.U.P.A.E. (Inte...

Capacity :

30000 Kg/Annum

Plant and Machinery cost:

16 Lacs

Working Capital :

-

Rate of Return (ROR):

40.00

Break Even Point (BEP):

52.00

TCI :

37 Lacs

Cost of Project :

0

Fully Automatic Match Box With Match Sticks (Wooden Match Sticks & Waxed Strips) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials
Fully Automatic Match Box With Match Sticks (Wooden Match Sticks & Waxed Strips) - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials

The various sizes and type of match boxes are largely used in all the homes commercial section shops and industries. The Match phosphorus coating labe...

Capacity :

1500 Lacs/Annum

Plant and Machinery cost:

86 lacs

Working Capital :

-

Rate of Return (ROR):

42.00

Break Even Point (BEP):

43.00

TCI :

213 Lacs

Cost of Project :

0

Oxygen and Nitrogen Gas Plant - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue
Oxygen and Nitrogen Gas Plant - Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue

Oxygen (CO2, gas at 00/1 matm., 1.429g./l, crit. Pressure, 49.7 Matm.) is a colorless, odourless, and tasteless gas, somewhat heavier than air. It is...

Capacity :

1440 Cubie Meter/Day

Plant and Machinery cost:

50 Lacs

Working Capital :

18 Lacs

Rate of Return (ROR):

18.19

Break Even Point (BEP):

75.00

TCI :

101 Lacs

Cost of Project :

0

Make An Appointment

Talk to Our Experts Today!

appoinment
Call Us WhatsApp