Please choose a project below related to this category.
Low carbon ferro manganese is made by reaction of silicon present in silicon manganese or low carbon manganese with manganese ore and lime. These cann...
|
Capacity : 50.00 MT/day |
Plant and Machinery cost: Rs. 120 Lacs |
|
Working Capital : - |
Rate of Return (ROR): 75.00 |
|
Break Even Point (BEP): 34.00 |
TCI : Rs. 1300 Lacs |
|
Cost of Project : 0 |
Manufacturing of Denim Jeans & Jackets is one of the important products of readymade garments. As the name implies itself the readymade garments are g...
|
Capacity : 2000 Nos./Day |
Plant and Machinery cost: 118 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 37.00 |
|
Break Even Point (BEP): 46.00 |
TCI : 557 Lakhs |
|
Cost of Project : 0 |
Manganese ores, containing more than 35 % manganese are suitable for the manufacture of high or low grade ferro-manganese. Low carbon ferro manganese...
|
Capacity : 50 MT/Day |
Plant and Machinery cost: Rs. 104 Lakhs |
|
Working Capital : Rs. 885.00 Lakhs |
Rate of Return (ROR): 66.12 |
|
Break Even Point (BEP): 40.99 |
TCI : Rs. 1129.00 Lakhs |
|
Cost of Project : 0 |
Turmeric (Curcuma longa) is native to Asia and India. The tuberous rhizomes or underground stems of turmeric are used from antiquity as condiments, a...
|
Capacity : 40.00 Kgs/Day |
Plant and Machinery cost: 105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 4 Crores |
|
Cost of Project : 0 |
Ephidrine hydro chloride is a crystalline product or powder. It is largely used in the manufacturing of asthmatic drugs. The manufacturing process inv...
|
Capacity : 500 Kgs/Day |
Plant and Machinery cost: Rs. 119 Lakhs |
|
Working Capital : Rs. 153 Lakhs |
Rate of Return (ROR): 85.80 |
|
Break Even Point (BEP): 33.43 |
TCI : Rs. 401 Lakhs |
|
Cost of Project : 0 |
Manganese ores, containing more than 35 % manganese are suitable for the manufacture of high or low grade ferro-manganese. Low carbon ferro manganese...
|
Capacity : 50 MT/Day |
Plant and Machinery cost: Rs. 104 Lakhs |
|
Working Capital : Rs. 885.00 Lakhs |
Rate of Return (ROR): 66.12 |
|
Break Even Point (BEP): 40.99 |
TCI : Rs. 1129.00 Lakhs |
|
Cost of Project : 0 |