Please choose a project below related to this category.
Tomato is one of the most important "protective foods" because of its special nutritive value. Tomato concentrate that contains no less than 7% but le...
|
Capacity : Tomato Puree: 600 MT/annum Tomato Concentrate: 300 MT/annum Mango Concentrate: 300 MT/annum Guava Concentrate: 300 MT/annum Amla Concentrate: 300 MT/annum |
Plant and Machinery cost: Rs 136 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: Rs 521 lakhs |
|
Cost of Project : 52100000 |
India is the still by and large vegetarian in dietary habit and heavily depends upon vegetative source to meet out its daily protein requirement. Indi...
|
Capacity : Pigeon peas : 4,000 MT/ annum Lentil: 4,000 MT/annum Chickpeas: 4,000 MT/annum |
Plant and Machinery cost: Rs 146 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 65.00 |
TCI : Cost of Project: Rs 542 lakhs |
|
Cost of Project : 54200000 |
Peanut butter is a food paste made from ground nut or peanut. It consists essentially of cleaned, graded, blanched, roasted and crushed groundnuts con...
|
Capacity : 2,400,000 Kg/annum |
Plant and Machinery cost: Rs 126 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project: Rs 561 lakhs |
|
Cost of Project : 56100000 |
Wood-plastic composites (WPCs) are a product class that has been developing over the last 40 years resulting in increased applications and expanded ma...
|
Capacity : 4800000 sq.ft. |
Plant and Machinery cost: Rs 146 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs 391 lakhs |
|
Cost of Project : 39100000 |
Wood-plastic composites (WPCs) are a product class that has been developing over the last 40 years resulting in increased applications and expanded ma...
|
Capacity : 4800000 sq.ft. |
Plant and Machinery cost: Rs 146 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs 476 lakhs |
|
Cost of Project : 47600000 |
Electronic wastes, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a description of surplus, obsolete, broken or discarded el...
|
Capacity : Copper Wire: 500mt/annum Plastic Granules: 2230mt/annum Glass: 970mt/annum Ferrous Metal: 800mt/annum Monitors (Repair): 3000mt/annum |
Plant and Machinery cost: Rs 132 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project: Rs 518 lakhs |
|
Cost of Project : 51800000 |
A wet wipe, also known as a wet towel, or a moist towelette, is a small moistened piece of paper that often comes folded and individually wrapped for...
|
Capacity : Baby Wet Wipes (100 Pcs/ Pkt.) : 3,600,000 Pkts/Annum Facial Wet Tissues (30 Pcs/ Pkt.): 3,600,000 Pkts/Annum |
Plant and Machinery cost: Rs 142 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 32.00 |
TCI : Cost of Project: Rs 842 lakhs |
|
Cost of Project : 84200000 |
A scalpel is a small but extremely sharp knife used for surgery, anatomical dissection, and various arts and crafts. Scalpels may be disposable or re-...
|
Capacity : 40000 Pcs/Day |
Plant and Machinery cost: Rs 140 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 30.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project:Rs 210 Lakhs (Land & Building) |
|
Cost of Project : 21000000 |
Fatty alcohol is a generic term for a range of aliphatic hydrocarbons containing a hydroxyl group, usually in the terminal or n-position.They are natu...
|
Capacity :
|
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Curcumin is the main biologically active phytochemical compound of Turmeric. It is extracted, concentrated, standardized and researched. Curcumin, whi...
|
Capacity : 324MT/ annum |
Plant and Machinery cost: 131 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Projects: 333 Lakhs |
|
Cost of Project : 33300000 |
Sanitary napkins known as sanitary pads are important part of the gynecological hygiene for every woman. A woman will use an average of 10000 pieces o...
|
Capacity : 1728,00,000 Pcs./Annum |
Plant and Machinery cost: Rs. 134 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 35.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Cost of Project: Rs 1624 Lakhs |
|
Cost of Project : 162400000 |
The 1st sanitary napkins were in the form of a cotton wool or similar stringy rectangular structure, sheathed with an absorbent liner. Disposable sani...
|
Capacity : 1728,00,000 Pcs./Annum |
Plant and Machinery cost: Rs. 134 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 35.00 |
|
Break Even Point (BEP): 35.00 |
TCI : Cost of Project: Rs 1624 Lakhs |
|
Cost of Project : 162400000 |