Please choose a project below related to this category.
PRODUCT PROFILE A sanitary napkin, sanitary towel, sanitary pad, menstrual pad, maxi pad, or pad is an absorbent item worn by a woman while she is me...
|
Capacity : 120000 pieces/day |
Plant and Machinery cost: 32 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 204 Lakhs |
|
Cost of Project : 0 |
PRODUCT PROFILE Rice bran is the most important source of edible oil among the unconventional sources. Rice bran is the brown coating around the whit...
|
Capacity : 5100 MT/Annum, Refined rice bran oil, 24900MT/Annum, De oiled rice bran oil cake (byproduct) |
Plant and Machinery cost: 757 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of project: 1243 Lakhs |
|
Cost of Project : 124300000 |
PRODUCT PROFILE Concrete is a composite construction material composed primarily of aggregate, cement and water. Concrete is widely used for making a...
|
Capacity : 2400000 NO.s Concrete blocks /Annum, 49000 Cubic metre Ready mix concrete/Annum, |
Plant and Machinery cost: 1068 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of project: 1477 Lakhs |
|
Cost of Project : 147700000 |
Rice milling industry generates a lot of rice husk during milling of paddy which comes from the fields. This rice husk is mostly used as a fuel in the...
|
Capacity : 90,000 Kg /Annum |
Plant and Machinery cost: 285 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project : 524 Lakhs |
|
Cost of Project : 52400000 |
With the phenomenal increase in number of automobiles in India during recent years the demand of tyres as original equipment and as replacement has al...
|
Capacity : 12,000 MT/Annum Reclaim Rubber,3,000 MT/Annum Steel by Product |
Plant and Machinery cost: 166 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 596 Lakhs |
|
Cost of Project : 59600000 |
In India dairying has been practiced as a rural cottage industry since the remote past, semi commercial dairying started with the establishment of mil...
|
Capacity : - |
Plant and Machinery cost: 12 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 160 Lakhs |
|
Cost of Project : 0 |
The manufacture of standard commercial graphite as generally practiced in industry differs greatly from that of metals since graphite has no distinct...
|
Capacity : High Grade Pitch 35400 MT/Annum |
Plant and Machinery cost: 875 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : 1447 Lakhs |
|
Cost of Project : 144700000 |
Starch is a group of polysaccharides, composed of glucopyranose units joined together by glucosidric linkages. It conforms to the molecular formula. W...
|
Capacity : - |
Plant and Machinery cost: 1477 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project : 2425 Lakhs |
|
Cost of Project : 242500000 |
Coal tar is a brown or black liquid of high viscosity, which smells of naphthalene and aromatic hydro carbons. Coal tar is among the byproducts when c...
|
Capacity : - |
Plant and Machinery cost: 1531 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Cost of Project : 3068 Lakhs |
|
Cost of Project : 306800000 |
Feeds are used as edible materials, which are consumed by cattle, poultry and contribute energy and/or nutrients to the cattle or poultry diet. Feeds...
|
Capacity : - |
Plant and Machinery cost: 309 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : 689 Lakhs |
|
Cost of Project : 0 |
Tyres and Tubes are the backbone of the bicycle and rickshaw. Bicycle and rickshaw continues to be the principal mode of transport for the low and mid...
|
Capacity : 300000 Nos. Tyres & 300000 Nos. Tubes |
Plant and Machinery cost: 158 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 351 Lakhs |
|
Cost of Project : 0 |
A toothpick is a small stick of wood, plastic, bamboo, metal, bone or other substance used to remove detritus from the teeth, usually after a meal. A...
|
Capacity : - |
Plant and Machinery cost: 6 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 62.00 |
TCI : 22 Lakhs |
|
Cost of Project : 0 |