Please choose a project below related to this category.
Aluminium Conductors (i) All Aluminium Conductors (AAC) (ii) All Alloy Aluminium Conductors (AAAC), and (iii) Aluminium Conductors Steel Reinforced (A...
|
Capacity : 4 MT/Day |
Plant and Machinery cost: 93 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 37.00 |
|
Break Even Point (BEP): 37.00 |
TCI : Cost of Project : 393 Lakhs |
|
Cost of Project : 39300000 |
Aluminum is the most widely used non ferrous metal and is extensively used in packaging materials. It is an excellent material for creating all types...
|
Capacity : 147,5000 NOS./day |
Plant and Machinery cost: 55 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 53.00 |
|
Break Even Point (BEP): 21.00 |
TCI : 2018 Lakhs |
|
Cost of Project : 0 |
A beverage can is a metal container designed to hold a fixed portion of liquid such as a carbonated soft drink, alcoholic beverage, fruit juice, herba...
|
Capacity : 1000 Kg /day |
Plant and Machinery cost: 109 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project : 298 Lakhs |
|
Cost of Project : 29800000 |
Water seepage is a major problem in construction industries particularly when the buildings are constructed in the damped environment. A large number...
|
Capacity : 3000 Liters /day |
Plant and Machinery cost: 24 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 33.00 |
TCI : 419 Lakhs |
|
Cost of Project : 0 |
Maize is one of the cereal grains which produces through out India and is placed 3rd position in agricultural base production. Maize is constituted by...
|
Capacity : - |
Plant and Machinery cost: 349 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 57.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 1137 Lakhs |
|
Cost of Project : 113700000 |
A tyre is an assembly of numerous components that are built up on a drum and then cured in a press under heat and pressure. Heat facilitates a polymer...
|
Capacity : 2000 Nos./ day |
Plant and Machinery cost: 1132 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 1908 Lakhs |
|
Cost of Project : 190800000 |
EPS/ Thermocol is the standard abbreviation for Expanded Poly Styrene. Low levels of styrene occur naturally in plants as well as a variety of foods s...
|
Capacity : - |
Plant and Machinery cost: 222 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 35.00 |
TCI : 816 Lakhs |
|
Cost of Project : 0 |
Alumina is a white granular material, a little less coarse than table salt, and is properly called aluminium oxide. Aluminium does not occur as a met...
|
Capacity : 1800000 MT/ Annum |
Plant and Machinery cost: 64454 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Cost of Project : 79232 Lakhs |
|
Cost of Project : 7923200000 |
Sugar industry is one of the most important agro based industries and is highly responsible for creating significant impact on rural economy in partic...
|
Capacity : - |
Plant and Machinery cost: 455 Crore |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 19.00 |
TCI : Cost of Project : 1321 Crore |
|
Cost of Project : 13210000000 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : 150000 cubic meter/ Annum |
Plant and Machinery cost: 1100 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 1790 Lakhs |
|
Cost of Project : 179000000 |
Activated Carbon is a unique material because of the way it is filled with holes (voids, spaces, sites, pores,) whatever the size of molecules. It is...
|
Capacity : 6000 MT/ Annum |
Plant and Machinery cost: 181 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 1070 Lakhs |
|
Cost of Project : 0 |
EMD is a complex composite of various crystals of manganese and oxygen that is produced through electro-winning. It is used primarily as the active co...
|
Capacity : Electrolytic Manganese Dioxide 5 MT Per Day |
Plant and Machinery cost: 89 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project: 576 Lakhs |
|
Cost of Project : 57600000 |