Please choose a project below related to this category.
Pre cast boundary walls are a by-product of other primary needs: protection, privacy or both. Putting up a designer fence or wall enables us to define...
|
Capacity : 36000 Sq. Mtr/Annum |
Plant and Machinery cost: 55 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : 172 Lakhs |
|
Cost of Project : 17200000 |
A lubricant is a substance (often a liquid) introduced between two moving surfaces to reduce the friction between them, improving efficiency and reduc...
|
Capacity : 1500 Kls/Annum (Motor oil) |
Plant and Machinery cost: 34 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 31.00 |
TCI : 391 Lakhs |
|
Cost of Project : 0 |
The most common, versatile and oldest material that is used for making furniture is wood. Almost all varieties of furniture can be made of wood. Wood...
|
Capacity : 48000 Pcs./Annum (Wooden Laboratory Furniture), Cabinet, Racks & Benches 20 Pc Per Day., Tables 60 Pcs & Chair 40 Pcs. Per Day. |
Plant and Machinery cost: 42 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 288 Lakhs |
|
Cost of Project : 0 |
With the phenomenal increase in number of automobiles in India during recent years the demand of tyres as original equipment and as replacement has al...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Surgical gowns are worn by doctors and nurses in the operating theater to address a dual function of preventing transfer of microorganisms and body fl...
|
Capacity : - |
Plant and Machinery cost: 63 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 15.00 |
|
Break Even Point (BEP): 74.00 |
TCI : Cost of Project : 239 Lakhs |
|
Cost of Project : 0 |
Most auto engines are cooled by the liquid type. Liquid cooled engines have passages for the liquid, or coolant, through the cylinder block and head....
|
Capacity : 1500000 Ltrs/Annum Coolant, 300000 Kg/Annum Grease |
Plant and Machinery cost: 70 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 65.00 |
TCI : Cost of Project : 197 Lakhs |
|
Cost of Project : 0 |
Glucose Syrup is a clear, colourless, viscous solution making it compatible with the physical properties desired in the end products chemically, gluco...
|
Capacity : 42000 MT/Annum (Corn Processing), 125 MT Glucose Syrup Per Day., 125 MT Fructose Per Day. |
Plant and Machinery cost: 430 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 46.00 |
TCI : 1 Million |
|
Cost of Project : 0 |
Pilfer Proof Caps (P.P. Caps) are popular all over the world which provide not only the above mentioned qualities to the bottle contents, but also a p...
|
Capacity : 160000 Nos/Day |
Plant and Machinery cost: 14 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 128 Lakhs |
|
Cost of Project : 0 |
Disposable cutlery and containers are products that are a part of our day to day life. Disposable items like cups, plates, saucers are being increasin...
|
Capacity : 9000000 Nos./Annum |
Plant and Machinery cost: 7 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 48.00 |
TCI : 34 Lakhs |
|
Cost of Project : 0 |
The game of Tennis is one of the most popular sports throughout the world. Tennis is also being popular in our country. India has produced some of the...
|
Capacity : 1200 Nos./Day |
Plant and Machinery cost: 10 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 44.00 |
TCI : 86 Lakhs |
|
Cost of Project : 0 |
Pre Laminated Particle Boards give a new look to both the surroundings and one’s day to day life. Particle boards are very versatile and can be used...
|
Capacity : 15000 cu.mt./Annum |
Plant and Machinery cost: 137 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 10 Crores |
|
Cost of Project : 0 |
Manganese dioxide is the inorganic compound with the formula Mno2. This blackish or brown solid occurs naturally as the mineral pyrolusite, which is t...
|
Capacity : 6000 MT/Annum |
Plant and Machinery cost: 127 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project : 678 Lakhs |
|
Cost of Project : 0 |