Please choose a project below related to this category.
The primary objective of the study is to review the technological status of ferroalloys industry in the country in the area of bulk production of sil...
|
Capacity : 12 MT/Day, Ferro Manganese –6 MT/Day, Silico Manganese 3 MT/Day, Ferro Silicon 3 MT/Day |
Plant and Machinery cost: 75 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 79.00 |
TCI : Cost of Project : 242 Lakhs |
|
Cost of Project : 0 |
Transformer oil, or insulating oil, is usually a highly-refined mineral oil that is stable at high temperatures and has excellent electrical insulatin...
|
Capacity : 30000.00 KLS/annum |
Plant and Machinery cost: 1294 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 3675 Lakhs |
|
Cost of Project : 0 |
Cork is the suberous covering of the species quercus suber 'L' commonly known as the cork oak. Cork is one of the most versatile natural raw materials...
|
Capacity : 1000.00 KGS./day |
Plant and Machinery cost: 41 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 194 Lakhs |
|
Cost of Project : 0 |
The bamboos are a group of woody perennial evergreen plants in the true grass family poaceae, subfamily bambusoideae, tribe bambuseae. Some are giant...
|
Capacity : 14400.00 SETS/Annum |
Plant and Machinery cost: 5 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 138 Lakhs |
|
Cost of Project : 0 |
Rice milling industry generates a lot of rice husk during milling of paddy which comes from the fields. This rice husk is mostly used as a fuel in the...
|
Capacity : 90000 KGS/Annum |
Plant and Machinery cost: 246 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 39.00 |
|
Break Even Point (BEP): 47.00 |
TCI : 557 Lakhs |
|
Cost of Project : 0 |
Tyres are ring shaped parts, either pneumatic or solid, that fit around wheels to protect them and enhance their function. Tyres are used on many type...
|
Capacity : - |
Plant and Machinery cost: 70 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 70.00 |
TCI : Cost of Project : 102 lakhs |
|
Cost of Project : 0 |
L.P.G is used mainly for cooking purposes in India. It is usually filled in small cylinder to be used in household cooking. It is also used for drying...
|
Capacity : 300000 Nos./year |
Plant and Machinery cost: 104 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 50.00 |
|
Break Even Point (BEP): 37.00 |
TCI : Cost of Project : 626 lakhs |
|
Cost of Project : 0 |
Baby diapers are recently introduced in India but it is becoming popular in India since last two decades and it has become a general necessity fo...
|
Capacity : 22500.00 PCS./day |
Plant and Machinery cost: 60 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 43.00 |
TCI : 199 lakhs |
|
Cost of Project : 0 |
The aluminium industry can be categorized into two principal segments. First key segment is the production of primary aluminium by integrated produces...
|
Capacity : 25000 MT/year |
Plant and Machinery cost: 392 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project : 1951 lakhs |
|
Cost of Project : 0 |
-
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
DAIRY FARMING AND MILK PRODUCTS (Ghee, Pasturised Milk in Poly Pack), Cow Urine Processing and Packing in ½ Ltr. Glass Bottles with Biogas Plant...
|
Capacity : - |
Plant and Machinery cost: 162 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 1665 Lakhs |
|
Cost of Project : 0 |
Ethanol, also called ethyl alcohol, grain alcohol or drinking alcohol, is a volatile, flammable, colorless liquid. It is a psychoactive drug, best kno...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |