Please choose a project below related to this category.
Plastics have become an important part of modern life and are used in different sectors of applications like packaging, building materials, consumer p...
|
Capacity : - |
Plant and Machinery cost: 166 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project : 298 Lakhs |
|
Cost of Project : 0 |
Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...
|
Capacity : - |
Plant and Machinery cost: 25 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 54.00 |
TCI : 100 Lakhs |
|
Cost of Project : 0 |
Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...
|
Capacity : 3000000 Bottles/Annum |
Plant and Machinery cost: 39 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : 108 Lakhs |
|
Cost of Project : 0 |
Power Generation is an essential requirement of economic growth of a country. A weak power infrastructure does not lead to the growth potential and pu...
|
Capacity : 500 MW |
Plant and Machinery cost: 143200 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 56.00 |
|
Break Even Point (BEP): 25.00 |
TCI : Cost of Project : 158700 Lakhs |
|
Cost of Project : 0 |
Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...
|
Capacity : 60000000 Nos. Bottles/Annum |
Plant and Machinery cost: 217 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 454 Lakhs |
|
Cost of Project : 0 |
Energy is the key factor in economic development of country. As we approach the turn of century our requirements of energy will increase rapidly and v...
|
Capacity : 4800 MT/Annum |
Plant and Machinery cost: 28 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 129 Lakhs |
|
Cost of Project : 0 |
Copper wire is an essential material for electrical cables and motor and transformer winding. Copper wire is available in different gauges (42 gauges...
|
Capacity : 150 MT/Annum |
Plant and Machinery cost: 69 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 42.00 |
TCI : 167 Lakhs |
|
Cost of Project : 0 |
Bauxite ore is an important mineral used in producing alumina, the raw material that is in turn used for producing aluminum. Approximately 85% of Baux...
|
Capacity : 19998 MT/Annum Pure Alumina from Bauxite |
Plant and Machinery cost: 671 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 2113 Lakhs |
|
Cost of Project : 0 |
Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...
|
Capacity : Drinking Water – 17280000 Nos. Bottles (1 Ltr.)/Annum,Soda Water – 1008000 Nos. Bottles (600 Ml)/Annum,Drinking Water Jar – 720000 Nos. Jar (20 Ltr.)/Annum |
Plant and Machinery cost: 403 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 695 Lakhs |
|
Cost of Project : 0 |
Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a loose category of surplus, obsolete, broken, or discarded...
|
Capacity : - |
Plant and Machinery cost: 51 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 196 Lakhs (W/C 1 Month) |
|
Cost of Project : 0 |
Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...
|
Capacity : 6,00,00,000 Bottles/Annum |
Plant and Machinery cost: 217 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 455 Lakhs |
|
Cost of Project : 0 |
Hygiene is an essential component of healthy living, integral to achieving health and preventing disease. Not just selecting the right food choices bu...
|
Capacity : 3000 MT/Annum, 6 MT Paper Napkins, 2 MT Toilet Rolls, 2 MT Facial Paper |
Plant and Machinery cost: 41 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 25.00 |
TCI : 923 Lakhs |
|
Cost of Project : 0 |