Calcined bauxite is an important raw material for two main markets: refractories and abrasives.Bauxite is a naturally occurring, heterogeneous materia...
|
Capacity : Calcined Bauxite: 40 MT/day |
Plant and Machinery cost: Rs. 219 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs766 lakhs |
|
Cost of Project : 76600000 |
E-Rickshaws are three wheel battery operated vehicles, which are considered as an upgrade to conventional rickshaws, and economically better than auto...
|
Capacity : E Rickshaw: 4 Nos./Day |
Plant and Machinery cost: Rs. 28 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: Rs. 323 lakhs |
|
Cost of Project : 32300000 |
Copper rod is considered suitable for power and communication cables, house wire, strips for power and distribution transformers, magnet wires, etc. C...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Copper and brass are two very similar looking metals but there are many occasions when it's useful to be able to differentiate between brass and coppe...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Copper strip is produced in a wide variety of copper alloys, including clad composites. It can be produced in standard dimensions. Copper Strips Ma...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Marbles are small balls of colored or decorated glass which are either intended for playing the ancient game of marbles or as collector's items. They...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
E-Rickshaw (Electric tuk-tuks) Manufacturing Business. How to Start Electric Vehicle Assembling Industry E-Rickshaws are small vehicles, with thr...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Electric Rickshaw, in short, also called as E-Rickshaw. This kind of transport vehicle are famous in many countries, this is eco-friendly vehicles for...
|
Capacity : 1,200 Nos per Annum |
Plant and Machinery cost: 29 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project: 324 Lakhs |
|
Cost of Project : 32400000 |
A solar panel is a collection of solar cells.Solar panel refers either to a photovoltaic module, a solar thermal energy panel, or to a set of solar ph...
|
Capacity : Solar Panel: 25 MW |
Plant and Machinery cost: Rs. 161 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 54.00 |
|
Break Even Point (BEP): 28.00 |
TCI : Rs.804 lakhs |
|
Cost of Project : 80400000 |
Copper is one of the basic chemical elements. In its nearly pure state, copper is a reddish-orange metal known for its high thermal and electrical con...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
[NPCS/5056/23345] Copper cathode is a form of copper that has a purity of 99.95%. In order to remove impurities from copper ore, it undergoes two pro...
|
Capacity : Copper Cathode: 1800 MT/Annum Copper Slag, Residue : 180 MT/Annum |
Plant and Machinery cost: Rs 136 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost of Project: Rs 1348 lakhs |
|
Cost of Project : 134800000 |
Coal Washing Unit is one of the most important units for up-gradation of Coal in sense of fed value by reducing of ash content in the Coal. It is basi...
|
Capacity : Coal Washing (Job Work) : 3000MT/Day |
Plant and Machinery cost: Rs 668 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 12.00 |
|
Break Even Point (BEP): 68.00 |
TCI : Cost of Project: Rs1735lakhs |
|
Cost of Project : 1735100000 |