Please choose a project below related to this category.
Pan Masala is a balanced mixture of betel leaf with lime, areca nut, clove, cardamom, mint, tobacco, essence and other ingredients. It is an agricultu...
|
Capacity : Sada Pan Masala :330.0 Kgs./Day.,Meetha Pan Masala:330.0 Kgs./ Day.,Zarda Pan Masala:340.0 Kgs. / Day. |
Plant and Machinery cost: Rs.39 Lakhs. |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : Rs.251 Lakhs. |
|
Cost of Project : 25100000 |
Pre gelatinized starch is a processed carbohydrate used as a texturizer and or binder. It is typically derived from corn, waxy corn potato or tapioca....
|
Capacity : 10 MT/Day |
Plant and Machinery cost: Rs.93 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost Of Project : Rs. 475 Lakhs |
|
Cost of Project : 47500000 |
A cigarette is a small cylinder of finely cut tobacco leaves rolled in thin paper for smoking. The cigarette is ignited at one end and allowed to smol...
|
Capacity : 288000 Packets/ day |
Plant and Machinery cost: Rs.339 Lakhs |
|
Working Capital : |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost Of Project : Rs. 1559 Lakhs |
|
Cost of Project : 155900000 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based cementitious building material that is expanding into new worldwide markets. As a s...
|
Capacity : 500 CUM/Day |
Plant and Machinery cost: Rs.1117 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost Of Project : Rs. 1886 Lakhs |
|
Cost of Project : 188600000 |
Cellular light weight concrete is also known as CLC, foamed cement, and light weight cement, world over thanks to its advantages over ordinary buildin...
|
Capacity : 50 Cu Mtr/Day |
Plant and Machinery cost: Rs.127 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 16.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : Rs.413 Lakhs |
|
Cost of Project : 41300000 |
Starch (C6H10O5)n, the principal reserve poly Saccharide in plants constitutes substantial portion of human diet. It is the principal components of mo...
|
Capacity : 80 MT/day |
Plant and Machinery cost: Rs.358 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : Rs.737 Lakhs |
|
Cost of Project : 73700000 |
Sorbitol is one of many sugar alcohols found in nature that gets metabolized slower in our bodies than other normal dietary sugars. Also known as gluc...
|
Capacity : 47 MT/Day |
Plant and Machinery cost: Rs. 869 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 41.00 |
TCI : Cost of Project : Rs. 1235 Lakhs |
|
Cost of Project : 123500000 |
Maize is third important cereal/crop after wheat and rice and has a great potential of processing due to its high nutritive value and commercial uses....
|
Capacity : - |
Plant and Machinery cost: Rs.1029 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 30.00 |
TCI : Cost of Project : Rs.2807 Lakhs |
|
Cost of Project : 280700000 |
Maize (Zea mays) is classified into dent, flint, waxy, sweet and pop corn categories. Dent corn also known as field corn, containing both hard and so...
|
Capacity : - |
Plant and Machinery cost: Rs.145 Crores |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 31.00 |
TCI : Cost of Project : Rs.213 Crores |
|
Cost of Project : 2130000000 |
Water seepage is a major problem in construction industries particularly when the buildings are constructed in the damped environment. A large number...
|
Capacity : 3000 Liters /day |
Plant and Machinery cost: 24 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 33.00 |
TCI : 419 Lakhs |
|
Cost of Project : 0 |
Maize is one of the cereal grains which produces through out India and is placed 3rd position in agricultural base production. Maize is constituted by...
|
Capacity : - |
Plant and Machinery cost: 349 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 57.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 1137 Lakhs |
|
Cost of Project : 113700000 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : 150000 cubic meter/ Annum |
Plant and Machinery cost: 1100 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 1790 Lakhs |
|
Cost of Project : 179000000 |