PRODUCT PROFILE Concrete is a composite construction material composed primarily of aggregate, cement and water. Concrete is widely used for making a...
|
Capacity : 2400000 NO.s Concrete blocks /Annum, 49000 Cubic metre Ready mix concrete/Annum, |
Plant and Machinery cost: 1068 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of project: 1477 Lakhs |
|
Cost of Project : 147700000 |
Rice milling industry generates a lot of rice husk during milling of paddy which comes from the fields. This rice husk is mostly used as a fuel in the...
|
Capacity : 90,000 Kg /Annum |
Plant and Machinery cost: 285 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 62.00 |
TCI : Cost of Project : 524 Lakhs |
|
Cost of Project : 52400000 |
Pan Masala is widely used to remove bad odour of mouth and for scenting the breath in order to impart it a pleasant feeling. Pan masalas are available...
|
Capacity : 200 Kg/day Pan Masala, 200 Kg/day Zarda, 200 Kg/day Kimam |
Plant and Machinery cost: 14 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 44.00 |
TCI : 132 Lakhs |
|
Cost of Project : 0 |
Cashew was introduced in India by the Portuguese four centuries ago mainly to prevent soil erosion. Cashew ranks second among the nine tree nuts which...
|
Capacity : - |
Plant and Machinery cost: 32 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 37.00 |
TCI : Cost of Project : 159 Lakhs |
|
Cost of Project : 15900000 |
In India dairying has been practiced as a rural cottage industry since the remote past, semi commercial dairying started with the establishment of mil...
|
Capacity : - |
Plant and Machinery cost: 12 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 49.00 |
|
Break Even Point (BEP): 32.00 |
TCI : 160 Lakhs |
|
Cost of Project : 0 |
Starch is a group of polysaccharides, composed of glucopyranose units joined together by glucosidric linkages. It conforms to the molecular formula. W...
|
Capacity : - |
Plant and Machinery cost: 1477 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 44.00 |
TCI : Cost of Project : 2425 Lakhs |
|
Cost of Project : 242500000 |
Feeds are used as edible materials, which are consumed by cattle, poultry and contribute energy and/or nutrients to the cattle or poultry diet. Feeds...
|
Capacity : - |
Plant and Machinery cost: 309 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 57.00 |
TCI : Cost of Project : 689 Lakhs |
|
Cost of Project : 0 |
Iron ore pellets are spheres of typically 8-18mm (0.31-0.71 inch) to be used as raw material for blast furnace. They typically contain 67-72% Fe and v...
|
Capacity : 1200000 MT/Annum |
Plant and Machinery cost: 3801 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : 6183 Lakhs |
|
Cost of Project : 0 |
Wheat is a grass, originally from the Fertile Crescent regions, but now cultivated worldwide. In 2007 world production of wheat was 607 million tons w...
|
Capacity : 30000 MT/Annum |
Plant and Machinery cost: 240 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : 736 Lakhs |
|
Cost of Project : 0 |
India vegetable basket is incomplete without mentioning the king of vegetables-potato-a sustaining force and a culinary delight. The power of potato i...
|
Capacity : - |
Plant and Machinery cost: 133 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 43.00 |
TCI : 513 Lakhs |
|
Cost of Project : 0 |
Copper wire is an essential material for electrical cables, motors and transformer winding. Copper wire is available in different gauges. The gauge of...
|
Capacity : 6300 MT/Annum |
Plant and Machinery cost: 190 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 1126 Lakhs |
|
Cost of Project : 0 |
Autoclaved Aerated Concrete (AAC) is a non combustible, lime based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : 150000 M3/Annum |
Plant and Machinery cost: 1100 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : 1790 Lakhs |
|
Cost of Project : 0 |