Please choose a project below related to this category.
Starches are modified to enhance their performance in different applications. Starches may be modified to increase their stability against excessive h...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Sorbitol, a polyol (sugar alcohol), is a bulk sweetener. Sorbitol is produced either from starch hydrolysates, from dextrose syrup, or from dextrose m...
|
Capacity : 40.0 Tonnes/Day |
Plant and Machinery cost: 1 |
|
Working Capital : 0 |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 1.00 |
TCI : 1 |
|
Cost of Project : 0 |
The most commonly used cement in the world is Portland cement, which is formed at high temperatures that chemically combine the ingredients into new c...
|
Capacity : 75000 MT/Annum |
Plant and Machinery cost: 433 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project : 727 Lakhs |
|
Cost of Project : 72700000 |
EMU (Dromaius novaehollandiae) bird belong to ratite group has high economic value for their meat, eggs, oil, skin and feathers. Meat from emu is of h...
|
Capacity : Meat 20,000 Kgs., EMU Chick 5000 Nos., EMU Oil 4000 Kgs., Eggs 20,000 Nos. /Annum |
Plant and Machinery cost: 44 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 34.00 |
TCI : 759 Lakhs |
|
Cost of Project : 0 |
Potato is one of the important tuber vegetables, which is consumed throughout the year. Indian vegetable basket is incomplete without mentioning the k...
|
Capacity : 3000 MT/Annum, 5 MT Potato Powder/Day, 2.5 MT Potato Flakes/Day, 2.5 MT Potato Granules/Day |
Plant and Machinery cost: 665 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 42.00 |
TCI : 1240 Lakhs |
|
Cost of Project : 0 |
Energy is the key factor in economic development of country. As we approach the turn of century our requirements of energy will increase rapidly and v...
|
Capacity : 4800 MT/Annum |
Plant and Machinery cost: 28 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 38.00 |
TCI : 129 Lakhs |
|
Cost of Project : 0 |
Rice has been and continues to be the largest source of human nutrition. Rice bran is a by-product of the rice milling process. Rice bran is the most...
|
Capacity : 8100 MT/Annum |
Plant and Machinery cost: 486 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : 804 Lakhs |
|
Cost of Project : 0 |
The term cement is used to designate many different kinds of substances that are used as binders. The term cements as used henceforth will be confined...
|
Capacity : 90,000 MT/Annum |
Plant and Machinery cost: 1296 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : 1750 Lakhs |
|
Cost of Project : 175000000 |
Copper wire is an essential material for electrical cables and motor and transformer winding. Copper wire is available in different gauges (42 gauges...
|
Capacity : 150 MT/Annum |
Plant and Machinery cost: 69 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 45.00 |
|
Break Even Point (BEP): 42.00 |
TCI : 167 Lakhs |
|
Cost of Project : 0 |
Maize provides nutrients for humans and animals and serves as a basic raw material for the production of starch, oil and protein, alcoholic beverages,...
|
Capacity : - |
Plant and Machinery cost: 238 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 697 Lakhs |
|
Cost of Project : 0 |
Poultry farming has occupied an important place in the Indian economy. With the fast food culture an accepted feature, poultry farming is playing a gr...
|
Capacity : 100000 Birds/Annum, 150000 Eggs/Annum (Poultry Farming) |
Plant and Machinery cost: 8 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 47.00 |
TCI : 56 Lakhs |
|
Cost of Project : 0 |
Ready mix concrete is a modern trend of introduction in the Asian Countries. It is already introduced long before in the European Countries. It is new...
|
Capacity : 240 Cubic Meter/Day |
Plant and Machinery cost: 86 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 36.00 |
TCI : 936 Lakhs |
|
Cost of Project : 0 |