Besides, Bihar is rapidly bending towards a dynamic industrial-cum-entrepreneurial destination anchored on a thriving agricultural setting, robust infrastructural edifice, and an inventive state of outlook. The precise areas that the state is deliberately focusing on at the moment include laser-sharp present sectors, for instance, food processing, dairy, fisheries, textiles, logistics, and renewable power-generation, among others. This implies that there are countless opportunities for ideal start-ups are numerous, as well as for prospective investors who are more interested in the scattering, low to medium capex, and truly scalable industrial travel. This is because of the inherent raw materials, low-cost human labor, and rapid transportation via the IMC Gaya plus other industrial corridors that present abundant prospects for considerate industrial infiltrations. Therefore, with the introduction of the visionary governmental incentives and hassle-free land-sourcing via BIADA, Bihar is strongly re-scripting the narrative and claiming a position among the most favored states in India when it comes to entire economic ripeness.
On the one hand, the Bihar government argues that its economy has indeed developed very rapidly during the most recent period. Thus, double-digit growth in current prices was noted from 2023 to 2025, which affected state output significantly, as mentioned above, the latter reached high values due to exceptionally high public-sector investments in industrial growth.
Key advantages:
To sum up, Bihar’s industrial ecosystem operates in a state that has an enabling environment, revitalized under the current government, a foundation of the most significant rich life-sustaining agri-based resources, and highly productive public expenditure. The state-government chosen sectoral focus on food processing, dairy, fisheries, textiles & renewable energy are demand guaranteed and provide suitable environments for the growth of sustainable MSMEs. BIADA’s supporting role and alternative of the cluster-based and SWG-integrated ones that minimize the geographical time and scope distance to the market facilitate easier, leisure creation and sustain, with negligible costs of doing business. If the turn-around to fully profit-oriented implementation and industrial revolution by investors and those clothed business incubators be hastened and pursued, Bihar’s increment thieving and highly demanding consumers will be favourably served, assuring investors potential ready and sustaining market forces.
Please choose a project below related to this category.
When it comes to advanced materials that are light in weight, ultra-strong, and driven by performance, carbon fiber stands out as a clear winner. Spin...
|
Capacity : 10,00,000 Kg Per Annum |
Plant and Machinery cost: 6.5 Crores |
|
Working Capital : - |
Rate of Return (ROR): 30 |
|
Break Even Point (BEP): 54 |
TCI : - |
|
Cost of Project : 170000000 |
Chemically, sodium chlorite has the formula NaClO2. It is a white, crystalline material that is non-flammable and odourless. It is employed in industr...
|
Capacity : Sodium Chlorite (NaClO2: 15 MT Per Day |
Plant and Machinery cost: 567 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project: 1892 Lakhs |
|
Cost of Project : 189200000 |
Curcumin is the main biologically active phytochemical compound of Turmeric. Molecular chemical formula of Curcumin: C21H20O6. The most important cons...
|
Capacity : Curcumin Powder: 25 Kgs./Day Turmeric Oil: 25 Kgs./Day Deoiled Turmeric: 440 Kgs./Day |
Plant and Machinery cost: 119 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 318 lakhs |
|
Cost of Project : 31800000 |
Nonwoven fabrics are broadly defined as sheet or web structures bonded together by entangling fiber or filaments (and by perforating films) mechanical...
|
Capacity : Non Woven Fabric 1.6 meter & 3.2 meter width 100 gsm : 400000 Sq.mtrs./day |
Plant and Machinery cost: 701 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 32.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project: Rs 1943 lakhs |
|
Cost of Project : 194300000 |
A plug-in hybrid electric vehicle (PHEV) is an HEV that can be plugged-in or recharged from wall electricity. PHEVs are distinguished by much larger b...
|
Capacity : 50 Nos./day |
Plant and Machinery cost: 95 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 34.00 |
|
Break Even Point (BEP): 74.00 |
TCI : Cost of Project: Rs 279 lakhs |
|
Cost of Project : 27900000 |
Activated charcoal is a non graphite form of charcoal and is micro crystalline in nature. It is extensively used in various industries as a very good...
|
Capacity : 1 MT/Day |
Plant and Machinery cost: 186 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project: Rs 446 lakhs |
|
Cost of Project : 44600000 |
Biodegradable shopping bags are made of polymers that degrade, or decompose, when exposed to air, water, or sunlight. Biodegradable packaging provides...
|
Capacity : Biodegradable Plastic Bags (Per Bag 25 gms Size): 360 MT/Annum |
Plant and Machinery cost: 298 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 61.00 |
TCI : Cost of Project: Rs 606 lakhs |
|
Cost of Project : 60600000 |
Detergent Cake and Detergent Powder Manufacturing Industry. Start a Washing Powder and Cake Business Detergent is a blend of surfactants with cleanin...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
HT (High Tensile Wire) Manufacturing Industry. Production of High Tensile Steel Wire for Prestressed Concrete Poles and Railway Sleepers High tensile...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Steel Fabrication Industry. Commercial Metal Fabrication. Profitable Business Ideas in Steel Industry Steel Fabrication is the process involved in sh...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
HDPE Jumbo Bags Manufacturing Industry. Production of FIBCS (Flexible Intermediate Bulk Containers), Bulk Bags FIBC Bags, also known as Jumbo Bags/ B...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Jumbo bags are big bags used for packing bulk materials of different types. These big bags in different specifications and grades based on the require...
|
Capacity : 8,640,000 Nos per Annum |
Plant and Machinery cost: 106 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 35.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project: 748 Lakhs |
|
Cost of Project : 74800000 |