Business Ideas with Investment of 10 Crore to 15 Crores (Plant and Machinery): Selected Project Profiles for Entrepreneurs, Startups between 100 million to 150 million

Business Ideas with Investment of 10 Crore to 15 Crores (Plant and Machinery): Selected Project Profiles for Entrepreneurs, Startups between 100 million to 150 million

Please choose a project below related to this category.

Dehydrated Fruits
Dehydrated Fruits

Dehydration is a process by which shelf life of the fruits can be extended by evaporating water while preserving the taste.Dehydrated products can be...

Capacity :

Dehydrated Fruits: 400 Kgs./day

Plant and Machinery cost:

Rs. 1084 lakhs

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

45.00

TCI :

Cost of Project : Rs1425 lakhs

Cost of Project :

142500000

Kraft Paper
Kraft Paper

Kraft paper is paper produced from chemical pulp produced in the kraft process. Sack kraft paper, or just sack paper, is a porous kraft paper with hig...

Capacity :

Kraft Paper: 50 MT/day Duplex Board as by product: 9 MT/day

Plant and Machinery cost:

Rs. 1069 lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

53.00

TCI :

Cost of Project: Rs. 2131 lakhs

Cost of Project :

213100000

Optical Fiber Cable
Optical Fiber Cable

An optical fiber (or fiber) is a glass or plastic fiber that carries light along its length. Fiber optics is the overlap of applied science and engine...

Capacity :

Optical Fibre Cable : 1000000 Kmtrs./Annum

Plant and Machinery cost:

Rs. 1411 lakhs

Working Capital :

-

Rate of Return (ROR):

32.00

Break Even Point (BEP):

42.00

TCI :

Cost of Project : Rs 8342 lakhs

Cost of Project :

834200000

Sulphuric Acid Plant including Mfg. of Chlorosulphonic Acid, 23% Oleum
Sulphuric Acid Plant including Mfg. of Chlorosulphonic Acid, 23% Oleum

Sulfuric acid or sulphuric acid) is a mineral acid with molecular formula H2SO4. It is a colorless, odorless, and syrupy liquid that is soluble in wat...

Capacity :

Sulphuric Acid 98%: 150 MT/Day Oleum 65%: 50MT/Day Oleum 23%: 60 MT/Day Chlorosulphonic Acid: 48 MT/Day Steam : 100 MT/Day

Plant and Machinery cost:

Rs 1482 lakhs

Working Capital :

-

Rate of Return (ROR):

50.00

Break Even Point (BEP):

27.00

TCI :

Cost of Project : Rs 2357 lakhs

Cost of Project :

235700000

Edible Oil Refinery from Crude Palm Oil
Edible Oil Refinery from Crude Palm Oil

Palm oil is edible oil which is extracted from the pulp of fruit of oil palms. The color of pulp is red. That's why crude palm oil is naturally simila...

Capacity :

Edible Oil Refinery from Crude Palm Oil : 80 MT/Day

Plant and Machinery cost:

Rs 1087 lakhs

Working Capital :

-

Rate of Return (ROR):

26.00

Break Even Point (BEP):

49.00

TCI :

Cost of Project: Rs5329lakhs

Cost of Project :

532900000

Sweetener from Rice
Sweetener from Rice

Brown rice (malt) syrup, also known as rice syrup or rice malt, is a sweetener which is rich in compounds categorized as sugars and is derived by cult...

Capacity :

80 MT/Day

Plant and Machinery cost:

1129 lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

49.00

TCI :

Cost of Project : Rs 2894 lakhs

Cost of Project :

289400000

Liquid Glucose  From Broken Rice
Liquid Glucose From Broken Rice

Liquid Glucose is usually manufactured by subjecting starch to high temperature in the presence of acid. However, Liquid Glucose of same Dextrose Equi...

Capacity :

Liquid Glucose: 140 MT/Day

Plant and Machinery cost:

1267 lakhs

Working Capital :

-

Rate of Return (ROR):

25.00

Break Even Point (BEP):

43.00

TCI :

Cost of Project: Rs 2275 lakhsb

Cost of Project :

227500000

LPG Cylinder Refilling Plant
LPG Cylinder Refilling Plant

Liquefied Petroleum Gas is a Propane / Butane mixture liquefied under normal ambient temperature and moderate pressures. It is a safe, clean burning,...

Capacity :

16000 Pcs./Day

Plant and Machinery cost:

Rs 1391 lakhs

Working Capital :

-

Rate of Return (ROR):

30.00

Break Even Point (BEP):

31.00

TCI :

Cost of Project: Rs 11166 lakhs

Cost of Project :

1116600000

Silicon Metal
Silicon Metal

Silicon is the most abundant element in Earth's crust. It is found in rocks, sand, clays and soils, combined with either oxygen as silicon dioxide, or...

Capacity :

Silicon Metal: 25 MT /Day

Plant and Machinery cost:

Rs 1277 lakhs

Working Capital :

0

Rate of Return (ROR):

28.00

Break Even Point (BEP):

74.00

TCI :

Cost of Project: Rs 2484 lakhs

Cost of Project :

248400000

Organic Dragon Fruit Farming
Organic Dragon Fruit Farming

Dragon Fruit stems are scandent (climbing habit), creeping, sprawling or clambering, and branch profusely. There can be 4-7 of them, between 5 and 10...

Capacity :

7200 Kgs/day

Plant and Machinery cost:

1316 lakhs

Working Capital :

-

Rate of Return (ROR):

133.00

Break Even Point (BEP):

15.00

TCI :

Cost of Project : Rs 3183 lakhs

Cost of Project :

318300000

Production of Pectin from Citrus, Lemon and Orange Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities
Production of Pectin from Citrus, Lemon and Orange Manufacturing Plant, Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Manufacturing Process, Machinery, Raw Materials, Feasibility Study, Investment Opportunities

Pectin is a structural heteropolysaccharide contained in the primary cell walls of terrestrial plants. It was first isolated and described in 1825 by...

Capacity :

150,000Kgs/annum

Plant and Machinery cost:

1289 Lakhs

Working Capital :

-

Rate of Return (ROR):

23.00

Break Even Point (BEP):

44.00

TCI :

Cost of Project 1660 Lakhs

Cost of Project :

166000000

Automobile Hoses (AC Hose, Fuel Hose, Hydraulic Hose, Petrol Pump Hose) and Production of Tyres
Automobile Hoses (AC Hose, Fuel Hose, Hydraulic Hose, Petrol Pump Hose) and Production of Tyres

A hose is a flexible hollow tube designed to carry fluids from one location to another. Hoses are also sometimes called pipes, or more generally tubin...

Capacity :

Automobile AC Hose: 300,000 Nos/Annum Fuel Hose: 500,000 Nos/Annum Hydraulic Hose:500,000 Nos/Annum Petrol Pump Hose: 200,000 Nos/Annum Tyres : 450,000 Nos/Annum

Plant and Machinery cost:

Rs 1020 lakhs

Working Capital :

-

Rate of Return (ROR):

27.00

Break Even Point (BEP):

52.00

TCI :

Cost of Project: Rs 2994 lakhs

Cost of Project :

299400000

Make An Appointment

Talk to Our Experts Today!

appoinment