The Indian cement industry is on a capacity expansion spree and was expected in 2007-08 to add another 60 mn tonne, with an investment of around Rs 100 bn. Between 2005 and 2008 around 55 companies announced either greenfield or brownfield expansion plans. With these projects, India's cement capacity was to touch a new high of approximately 200 mn tonne by 2008. Indian cement firms had also plans to increase their capacity by 74 mn tonne by 2010 with investment of Rs 300 bn. Companies like Zuari Cement, OCL, Dalmia Cement, Binani Cement, Birla Corp, India Cements, Saurashtra Cement, NCL Industries and JK Cement have proposed or are implementing capacity expansion projects. By 2008, about 21.5 mn tonne of additional capacity was expected to be realised through expansion only.
The overall capacity expanded to 210 mn tonne (MT) in 2008-09. According to Cement Manufacture's Association, capacity of around 13.5 mn tonne was added in 2008-09, of which 9.85 mn tonne was contributed by greenfield projects. The industry is expected to add 50-60 mn tonne in the next two years. Most of the large players will add up capacities under their capital expenditure programmes. Leading the lot is Jaypee group which recently announced expansion of 25 mn toone, ACC has plans to expand capacities by 7 mn tonne, Ambuja Cement by around 7.5 mn tonne, Madaras Cement by 6 mn tonne and UltraTech by 5 mn tonne.
The small and medium sized cement companies are looking at adding around 15-20 mn tonne of capacity per annum in the next two years. Binani Cement was to add 2.2 mn tonne in 2007-08, Dalmia Cement was expected to add 2.3 mn tonne. A division of Century Textiles was to add 1.5 mn tonne. Similarly, Jaiprakash Associates were expected to add 4.2 m tonne. J K Cement has planning to add 3.5 mn tonne by 2008-09. Kesoram has announced plans to add another 1.7 mn tonne. Madras Cements 4 mn tonne; Mangalam Cement of 11.0 mn tonne, OCL of 2.5 mn tonne; and Shree Cement 4.5 mn tonne.
Please choose a project below related to this category.
India is the second largest producer of cement in the world. No wonder, India's cement industry is a vital part of its economy, providing employment t...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
PSC poles stands for pre-stressed concrete. These are highly durable and strong PSC Poles fabricated from excellent quality concrete material. These p...
|
Capacity : Pre-Stressed Concrete Electric Poles: 200 Nos./Day |
Plant and Machinery cost: 158 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 58.00 |
TCI : Cost of Project: Rs 462 lakhs |
|
Cost of Project : 46200000 |
Ready mix concrete has advantages in the area where immediate requirement of concrete mixture like in the preparation of bridge overhead roads on or t...
|
Capacity : Ready Mix Concrete: 300 Cu.Mtrs /day Concrete Blocks (Size 400x100x200 mm): 250 Cu.Mtrs /day |
Plant and Machinery cost: Rs 83 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 69.00 |
TCI : Cost of Project : Rs 586 lakhs |
|
Cost of Project : 58600000 |
Concrete poles were first used over 60 years ago and were then made of normal reinforced concrete. As technology improved, production and use of concr...
|
Capacity : Prestressed Concrete Cement Electric Poles: 60,000nos/annum |
Plant and Machinery cost: Rs 304 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project: Rs 713 lakhs |
|
Cost of Project : 71300000 |
For many years throughout the world, poles made of wood, steel, and concrete have been used to support power transmission, telephone and telegraph lin...
|
Capacity : 200 Nos/day |
Plant and Machinery cost: 303 lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 32.00 |
TCI : Cost of Project: 1401 lakhs |
|
Cost of Project : 140100000 |
Cement is a material with adhesive and cohesive properties which make it capable of bonding minerals fragments into a compact whole. It can be defined...
|
Capacity : 200 MT/Day |
Plant and Machinery cost: Rs 755 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 17.22 |
|
Break Even Point (BEP): 61.78 |
TCI : Cost of Project: Rs 1254 Lakhs |
|
Cost of Project : 125400000 |
Cement is an inorganic, non-metallic substance with hydraulic binding properties, and is used as a bonding agent in building materials. It is a fine p...
|
Capacity : Clinker for Cement: 100 MT/Day |
Plant and Machinery cost: Rs 436 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 23.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project: Rs 907 Lakhs |
|
Cost of Project : 90700000 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : A.A.C. Blocks: 500 Cu.Mt /day |
Plant and Machinery cost: Rs 601 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project:Rs 1415 Lakhs |
|
Cost of Project : 141500000 |
PSC stands for pre-stressed concrete. These are highly durable and strong PSC Poles fabricated from excellent quality concrete material. These poles a...
|
Capacity : 60000 Nos. / Annum |
Plant and Machinery cost: Rs. 126 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project : Rs. 415 Lakhs |
|
Cost of Project : 41500000 |
The term “hydrated lime” is widely used to describe a powdered calcium hydroxide product made by reacting quicklime with a controlled excess of water....
|
Capacity : 15000 MT/annum |
Plant and Machinery cost: Rs. 264 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 53.00 |
TCI : Cost of Project : Rs. 784 Lakhs |
|
Cost of Project : 78400000 |
Any successful project-from constructing a building to painting one-starts with a solid foundation. That’s what paint primer offers: a solid foundatio...
|
Capacity : 180000 Kgs. /Annum |
Plant and Machinery cost: Rs. 41 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 20.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project : Rs. 65 Lakhs |
|
Cost of Project : 6500000 |
Ready mix concrete is a modern trend of introduction in the Asian Countries. It is already introduced long before in the European Countries. It is new...
|
Capacity : 240 Cu MT/Day |
Plant and Machinery cost: Rs 320 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.08 |
|
Break Even Point (BEP): 46.09 |
TCI : Cost of Project: Rs. 773 Lakhs |
|
Cost of Project : 77300000 |