The construction industry is the second largest industry in India after agriculture. It accounts for about 11% of India’s GDP. It makes significant contribution to the national economy and provides employment to large number of people.Construction constitutes 40% to 50% of India's capital expenditure on projects in various sectors such as highways, roads, railways, energy, airports, irrigation etc.There are mainly three segments in the construction industry like real estate construction which includes residential and commercial construction; infrastructure building which includes roads, railways, power etc; and industrial construction that consists of oil and gas refineries, pipelines, textiles etc.Building material is any material which is used for a construction purpose. Many naturally occurring substances, such as clay, sand, wood and rocks, even twigs and leaves have been used to construct buildings. Apart from naturally occurring materials, many man-made products are in use.
The feasibility of infrastructure projects in ports, roads, airports and railways with private-sector majority ownership is already evident. The government also expects a substantial increase in the share of private sector investments in infrastructure from 19 per cent in the Tenth Plan to around 30 per cent in the Eleventh Plan. The biggest increase in private participation is expected in roads (from 5 per cent to 36), ports (47 per cent to 74 per cent) and railways (less than 1 per cent to 20 per cent). The Planning Commission estimates that the remaining infrastructure investments will be funded by the central and state government. According to a study by ASSOCHAM, the burgeoning Indian construction industry, currently worth $70 billion, will rise to US$120 billion by 2010.
The Commonwealth Games - 2010 in New Delhi have thrown mega opportunities for Building Material Companies, Construction Equipments & Technologies companies. The Govt. of India has permitted FDI up to 100% for development of integrated townships in India last year. India is now the second most favored destination for FDI, behind China. A large and growing middle class population of more than 300 million people, a changing life style, better cost of living etc is growth drivers for this sector.
The Indian construction industry, an integral part of the economyand a conduit for a substantial part of its development investment, is poised for growth on account of industrialization, urbanization, economic development and people's rising expectations for improved quality of living in the coming years.
Please choose a project below related to this category.
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based, cementitious building material that is expanding into new worldwide markets. As a...
|
Capacity : A.A.C. Blocks: 500 Cu.Mt /day |
Plant and Machinery cost: Rs 601 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 50.00 |
TCI : Cost of Project:Rs 1415 Lakhs |
|
Cost of Project : 141500000 |
India is the largest producer of fruits and second largest producer of vegetables in the world. Fruits & vegetables, being perishable in nature re...
|
Capacity : 3000 MT |
Plant and Machinery cost: Rs 266 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 43.00 |
TCI : Cost of Project: Rs 882 Lakhs |
|
Cost of Project : 88200000 |
Bitumen is defined as “A viscous liquid, or a solid, consisting essentially of hydrocarbons and their derivatives, which is soluble in trichloro-ethye...
|
Capacity : 50 MT/Day |
Plant and Machinery cost: Rs 143 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project :Rs 372 Lakhs |
|
Cost of Project : 37200000 |
Steel is a generic name for a group of ferrous metals which due to their abundance durability versatility and low cost are most useful metallic materi...
|
Capacity : 30000 MT /Annum |
Plant and Machinery cost: Rs. 277 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 69.00 |
|
Break Even Point (BEP): 25.00 |
TCI : Cost of Project : Rs. 857 Lakhs |
|
Cost of Project : 85700000 |
Tempered glass is made from normal annealed glass via a thermal tempering process in which the glass is subjected to heat till its softening point and...
|
Capacity : 240000 Sq. mt/Annum |
Plant and Machinery cost: Rs. 189 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 29.00 |
|
Break Even Point (BEP): 49.00 |
TCI : Cost of Project : Rs. 559 Lakhs |
|
Cost of Project : 55900000 |
Any successful project-from constructing a building to painting one-starts with a solid foundation. That’s what paint primer offers: a solid foundatio...
|
Capacity : 180000 Kgs. /Annum |
Plant and Machinery cost: Rs. 41 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 20.00 |
|
Break Even Point (BEP): 64.00 |
TCI : Cost of Project : Rs. 65 Lakhs |
|
Cost of Project : 6500000 |
Natural or River sand are weathered and worn out particles of rocks and are of various grades or sizes depending upon the amount of wearing. Now-a-day...
|
Capacity : 9 Lakh MT/Annum |
Plant and Machinery cost: Rs. 707 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : Rs. 1067 Lakhs |
|
Cost of Project : 106700000 |
Wood plastic composite is good to solve the problem arises in the environment. There is scope of use agricultural waste product. In this case we will...
|
Capacity : 1152 MT/Annum |
Plant and Machinery cost: 75 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Projects: 288 Lakhs |
|
Cost of Project : 28800000 |
Vitrified tile is a tile which has been processed in such a way that it has very low porosity (and water absorption) which make it stain resistant and...
|
Capacity : 5000 Sq.Mt./Day |
Plant and Machinery cost: 4133 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Projects: 5868 Lakhs |
|
Cost of Project : 586800000 |
Ready mix concrete is a modern trend of introduction in the Asian Countries. It is already introduced long before in the European Countries. It is new...
|
Capacity : 240 Cu MT/Day |
Plant and Machinery cost: Rs 320 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.08 |
|
Break Even Point (BEP): 46.09 |
TCI : Cost of Project: Rs. 773 Lakhs |
|
Cost of Project : 77300000 |
Steel is a generic name for a group of ferrous metals which due to their abundance durability versatility and low cost are most useful metallic materi...
|
Capacity : 100 MT/Day |
Plant and Machinery cost: Rs.255 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 51.00 |
|
Break Even Point (BEP): 33.00 |
TCI : Rs.3699 Lakhs. |
|
Cost of Project : 0 |
Autoclaved Aerated Concrete (AAC) is a non-combustible, lime-based cementitious building material that is expanding into new worldwide markets. As a s...
|
Capacity : 500 CUM/Day |
Plant and Machinery cost: Rs.1117 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 39.00 |
TCI : Cost Of Project : Rs. 1886 Lakhs |
|
Cost of Project : 188600000 |