Leisure & Entertainment Projects

Shakespeare called   recreation “sweet”, and a defence against the “foes of life”, led by melancholy. In a high pressure world, recreation is a necessity. There is something chillingly calculated, after all, about the idea of “recreating” oneself in order to maintain one’s capacity for work. A recreation may indeed be a way of making the mind and body fit to take the strain of working.

Holidays are like bringing time to an absolute standstill. Getting away from work, home, the mundane chores, the regular routines and living life at a relaxed pace – doing the things we want to do, going to places one want to visit, being with loved one’s. In short, unwind as the mind and body rejuvenate.

But the unwinding process is never complete until one has the power to pick the holiday we want, at a time that suits best, choosing a destination, good kind of accommodation.

India is emerging a big market for family entertainment and amusement sector. The demand for commercial recreation parks that provide families the opportunity to recreate in a clean, wholesome, and non-threatening environment is strong and growing.

Entertainment and Amusement sector in India is expected to grow many fold in terms on both number of parks and total investment. Number of entertainment & Amusement parks in India is growing with fast pace and a large number of new parks in this category are expected to be built all over India in near future. Many Foreign companies have also reportedly taken interest in the Indian amusement parks market.

Family Entertainment Center (FEC) is also one of the fastest growing segments of the recreation industry today. The FEC consists of leisure centers that range from S.F indoor children’s play centers to outdoor Fun centers, large category indoor family entertainment centers to multi-acre outdoor mega-centers and encompasses centers that target families with children, teenagers, adults, etc. This sector has a very good future in the coming years.

Leisure & Entertainment Projects

Please choose a project below related to this category.

Small Hotel/Motel with Party Room, Restaurant, Fast Food Parlour & Banquet
Small Hotel/Motel with Party Room, Restaurant, Fast Food Parlour & Banquet

A hotel is an establishment that provides paid lodging on a short-term basis. Facilities provided may range from a modest-quality mattress in a small...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Outdoor & Indoor Entertainment Centre
Outdoor & Indoor Entertainment Centre

An entertainment center is a piece of furniture designed to house consumer electronic appliances and components, such as televisions. A family entert...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Setting Up Profitable Microbrewery, Brewpub, Craft Brewery Restaurant Business in India
Setting Up Profitable Microbrewery, Brewpub, Craft Brewery Restaurant Business in India

Restaurant! It is a most popular name in the present world. Many people do not have their meal in their home, they always take meal and food from rest...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Holiday Resort, Timeshare Resorts Business Opportunity
Holiday Resort, Timeshare Resorts Business Opportunity

The Indian tourism and hospitality industry has materialized as one of the key drivers of growth among the services sectors in India. It contributes t...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Holiday Resort
Holiday Resort

Holiday Resort Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Machinery, Raw Materials, Feasibility Study...

Capacity :

-

Plant and Machinery cost:

-

Working Capital :

-

Rate of Return (ROR):

1.00

Break Even Point (BEP):

0.00

TCI :

-

Cost of Project :

0

Start Your Own Water Park, Amusement Park Business
Start Your Own Water Park, Amusement Park Business

Start Your Own Water Park, Amusement Park Business Features Water Play areas such as Swimming Pools, Water Slides, Splash Pads, Water Playgrounds, La...

Capacity :

1000 visitors / Day

Plant and Machinery cost:

84 Lakh

Working Capital :

-

Rate of Return (ROR):

41.00

Break Even Point (BEP):

38.00

TCI :

362 Lakh

Cost of Project :

0

Amusement Park  Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics, Production Schedule
Amusement Park Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics, Production Schedule

An amusement park is a park that features various attractions, such as rides and games, as well as other events for entertainment purposes. A theme pa...

Capacity :

4000.00 ENT/day

Plant and Machinery cost:

1650 lakhs

Working Capital :

-

Rate of Return (ROR):

57.00

Break Even Point (BEP):

0.00

TCI :

2041 lakhs

Cost of Project :

204100000

Water Park- How to Open Water Park Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics
Water Park- How to Open Water Park Detailed Project Report, Profile, Business Plan, Industry Trends, Market Research, Survey, Machinery, Raw Materials, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics

A water park is an amusement park that features water play areas, such as swimming pools, water slides, splash pads, spray grounds (water playgrounds)...

Capacity :

1000 visitors / Day

Plant and Machinery cost:

84 Lakh

Working Capital :

-

Rate of Return (ROR):

41.00

Break Even Point (BEP):

38.00

TCI :

362 Lakh

Cost of Project :

0

Restaurant  with Microbrewery  - Detailed Project Report, Profile, Business Plan, Trends, Market Research, Survey, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics, Working Capital Requirement, Plant Layout, Cost of Project
Restaurant with Microbrewery - Detailed Project Report, Profile, Business Plan, Trends, Market Research, Survey, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics, Working Capital Requirement, Plant Layout, Cost of Project

A restaurant is simply a place to have food outside your home. It is smaller in size than a hotel as it does not have accommodation facilities. It is...

Capacity :

Restaurant (Veg. - Non-Veg.): 150 Nos/Day, Beer: 330 Pitchers/Day, Alcohol : 100 Nos/Day, Fresh Fruit Juice: 500 Nos/Day

Plant and Machinery cost:

Rs 189 Lakhs

Working Capital :

-

Rate of Return (ROR):

27.28

Break Even Point (BEP):

63.08

TCI :

Cost of Project: Rs 392 Lakhs

Cost of Project :

39200000

Resort - Detailed Project Report, Profile, Business Plan, Trends, Market Research, Survey, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics, Working Capital Requirement, Plant Layout, Cost of Project, Projected Balance Sheets
Resort - Detailed Project Report, Profile, Business Plan, Trends, Market Research, Survey, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics, Working Capital Requirement, Plant Layout, Cost of Project, Projected Balance Sheets

Holiday resorts business is very flourishing business these days not in India only but it has brilliant prospects in other countries also. After oil t...

Capacity :

-

Plant and Machinery cost:

Rs.64 Lakhs

Working Capital :

-

Rate of Return (ROR):

46.00

Break Even Point (BEP):

33.00

TCI :

Rs.1299 Lakhs

Cost of Project :

0

SAFARI PARK - Detailed Project Report, Profile, Business Plan, Trends, Market Research, Survey, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics, Working Capital Requirement, Plant Layout, Cost of Project,Profitability Ratios
SAFARI PARK - Detailed Project Report, Profile, Business Plan, Trends, Market Research, Survey, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics, Working Capital Requirement, Plant Layout, Cost of Project,Profitability Ratios

A safari park, sometimes known as a wildlife park is a zoo like commercial tourist attraction where visitors’ car drive in their own vehicles or ride...

Capacity :

Visitors 6000 Nos./Day

Plant and Machinery cost:

1099 Lakhs

Working Capital :

-

Rate of Return (ROR):

36.00

Break Even Point (BEP):

30.00

TCI :

49486 Lakhs

Cost of Project :

0

HOLIDAY RESORT (THREE STAR GRADE) - Detailed Project Report, Profile, Business Plan, Trends, Market Research, Survey, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics, Working Capital Requirement, Plant Layout,Cost of Project
HOLIDAY RESORT (THREE STAR GRADE) - Detailed Project Report, Profile, Business Plan, Trends, Market Research, Survey, Feasibility Study, Investment Opportunities, Cost and Revenue, Plant Economics, Working Capital Requirement, Plant Layout,Cost of Project

Tourism as an industry has been flourishing and growing since time immemorial, but it has been in the last few decades that specific attention has st...

Capacity :

27 Rooms, (3 Cottages, 16 Deluxe & 8 Suits)

Plant and Machinery cost:

631 Lakhs

Working Capital :

-

Rate of Return (ROR):

45.00

Break Even Point (BEP):

35.00

TCI :

945 Lakhs

Cost of Project :

0

Make An Appointment

Talk to Our Experts Today!

appoinment