Reasons for buying our reports:
This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, market potential of the product and reasons for investing in the product
This report provides vital information on the product like its characteristics and segmentation
This report helps you market and place the product correctly by identifying the target customer group of the product
This report helps you understand the viability of the project by disclosing details like machinery required, project costs and snapshot of other project financials
The report provides a glimpse of government regulations applicable on the industry
The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decisions.
Our Approach:
Our research reports broadly cover Indian markets, present analysis, outlook and forecast for a period of five years.
The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players
We use reliable sources of information and databases. And information from such sources is processed by us and included in the report
Please choose a project below related to this category.
Engineered stone is a composite material made of crushed stone bound together by an adhesive, (most commonly polymer resin, with some newer versions u...
|
Capacity : Quartz Slabs (760 x 2440 x 15 mm):60 Nos/Day |
Plant and Machinery cost: Rs 101 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.58 |
|
Break Even Point (BEP): 51.79 |
TCI : Cost of Project : Rs 350 Lakhs |
|
Cost of Project : 35000000 |
Hematite is one of the most abundant minerals on Earth's surface and in the shallow crust. It is an iron oxide with a chemical composition of Fe2O3. I...
|
Capacity : Hematite:120 MT/Day |
Plant and Machinery cost: Rs 416 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.11 |
|
Break Even Point (BEP): 51.00 |
TCI : Cost of Project : Rs 1081 Lakhs |
|
Cost of Project : 108100000 |
Coir as a natural organic product is organically biodegradable. The Fiber is hard and strong and decomposes slowly, making it perfectly suited for use...
|
Capacity : 6.5 MT/Day |
Plant and Machinery cost: Rs 654 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.93 |
|
Break Even Point (BEP): 50.48 |
TCI : Cost of Project:Rs 1149 Lakhs |
|
Cost of Project : 114900000 |
Optical Lenses are optical components designed to focus or diverge light. Optical Lenses, which may consist of a single or multiple elements, are used...
|
Capacity : 60,000 Pairs/Day |
Plant and Machinery cost: Rs 1026 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Cost of Project : Rs 2211 Lakhs |
|
Cost of Project : 221100000 |
The resin bond diamond wheels are mainly used for grinding tungsten carbide and non-metal materials. Various kinds of dimensions and shapes are availa...
|
Capacity : Resin Bonded Diamond Wheels:4000 Nos/Day |
Plant and Machinery cost: Rs 92 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 28.85 |
|
Break Even Point (BEP): 57.77 |
TCI : Cost of Project : Rs 871 Lakhs |
|
Cost of Project : 87100000 |
Waxes are among the oldest worked materials used by humans. Their value as versatile construction materials ("man's first plastic") was discovered ver...
|
Capacity : 20 MT/ Day |
Plant and Machinery cost: Rs 258 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project :Rs 704 Lakhs |
|
Cost of Project : 70400000 |
A bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. A bicycle rider is cal...
|
Capacity : Bicycles (Different Sizes):2000 Nos./Day |
Plant and Machinery cost: Rs 270 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 26.39 |
|
Break Even Point (BEP): 31.24 |
TCI : Cost of Project:Rs 3972 Lakhs |
|
Cost of Project : 397200000 |
The sheet of polyvinyl chloride is used as waterproof barrier in construction for all types of roofs, terraces, walls also in civil engineering in ver...
|
Capacity : PVC Membrane (2 mm Thickness):3,333 SQM/Day |
Plant and Machinery cost: Rs 238 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 25.76 |
|
Break Even Point (BEP): 57.50 |
TCI : Cost of Project: Rs 469 Lakhs |
|
Cost of Project : 46900000 |
The principal feed resources for animal consumption in the country are crop residues like straws of wheat, rice and other cereals and stovers, which a...
|
Capacity : 100 MT/Day |
Plant and Machinery cost: Rs 147 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 27.71 |
|
Break Even Point (BEP): 59.82 |
TCI : Cost of Project:Rs 527 Lakhs |
|
Cost of Project : 52700000 |
A medical college is meant to impart education of medical field to students to qualify them as doctors in different specialized disciplines so as to t...
|
Capacity : Total Students per Annum:150 Students Admitted/Annum 750 Beded Hospital |
Plant and Machinery cost: Rs 2047 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project :Rs 10747 Lakhs |
|
Cost of Project : 1074700000 |
A Multiplex is a multi screen entertainment complex showing different films under one roof with other type of supporting business in the vicinity like...
|
Capacity : 108 Seats Double Screen |
Plant and Machinery cost: Rs 157 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 21.24 |
|
Break Even Point (BEP): 57.13 |
TCI : Cost of Project:Rs 470 Lakhs |
|
Cost of Project : 47000000 |
Concrete is most vital material in modern construction. It has versatile properties like easy mouldability, high compressive strength and long lasting...
|
Capacity : Ready Mix Concrete : 62.5 Cu Mt/Day •Stone Crusher:62.5 Cu Mt/Day |
Plant and Machinery cost: Rs 234 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 24.39 |
|
Break Even Point (BEP): 52.00 |
TCI : Cost of Project:Rs 762 Lakhs |
|
Cost of Project : 76200000 |