Please choose a project below related to this category.
Electricity is an essential requirement for all facets of our life. It has been recognized as a basic human need. It is a critical infrastructure on w...
|
Capacity : 1014 MWh |
Plant and Machinery cost: 4370 Crores |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 24.00 |
TCI : Cost of Project : 4672 Crores |
|
Cost of Project : 0 |
The growing industrialization and associated use of energy have led the world to face energy crisis which is gaining serious concern day by day. The d...
|
Capacity : 1 MW |
Plant and Machinery cost: 1435 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 11.00 |
|
Break Even Point (BEP): 93.00 |
TCI : Cost of Project : 1871 Lakhs |
|
Cost of Project : 0 |
The growing industrialization and associated use of energy have led the world to face energy crisis which is gaining serious concern day by day. In pr...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |
Power generation is an essential requirement of economic growth of a country. Generation involves with the production of power and transmission and di...
|
Capacity : 5 MW |
Plant and Machinery cost: 1753 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 29.00 |
TCI : Cost of Project : 2076 Lakhs |
|
Cost of Project : 0 |
Robust power generation and an effective delivery model determine the bullish economic growth of a country. A weak power infrastructure impedes the gr...
|
Capacity : 5 MW |
Plant and Machinery cost: 1733 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 34.00 |
TCI : Cost of Project : 2097 Lakhs |
|
Cost of Project : 0 |
India is now the largest producer of sugar in the world. Although subject to cyclical fluctuations, sugar production has grown phenomenally in the...
|
Capacity : Sugar Mill Cap. 5000 Crushing/Day,Distillery Cap. 60000 Ltrs/Day, Power Plant Cap. 28 MW |
Plant and Machinery cost: 68 Crores |
|
Working Capital : - |
Rate of Return (ROR): 48.00 |
|
Break Even Point (BEP): 31.00 |
TCI : 162 Crores |
|
Cost of Project : 0 |
Robust power generation and an effective delivery model determine the bullish economic growth of a country. A weak power infrastructure impedes the gr...
|
Capacity : 5 MW |
Plant and Machinery cost: 1733 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 33.00 |
|
Break Even Point (BEP): 34.00 |
TCI : Cost of Project : 2097 Lakhs |
|
Cost of Project : 0 |
When the gas turbine generator was introduced to the power generation industry in the late 1940s, it was a revolutionary self-contained fossil-fueled...
|
Capacity : 25 MW |
Plant and Machinery cost: 100 Crores |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 20.00 |
TCI : Cost of Project : 110 Crores |
|
Cost of Project : 0 |
Resulting from manufacturing industry’s rapid growth, India is facing severe power shortages. Despite the expected increase in the generating capac...
|
Capacity : 5 MW |
Plant and Machinery cost: Rs. 16 Crores |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Cost of Project : Rs. 22 Crores |
|
Cost of Project : 0 |
Resulting from manufacturing industry’s rapid growth, India is facing severe power shortages. Despite the expected increase in the generating capac...
|
Capacity : 5 MW |
Plant and Machinery cost: Rs. 16 Crores |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 38.00 |
TCI : Cost of Project : Rs. 22 Crores |
|
Cost of Project : 0 |
-
|
Capacity : 834 Nos./day |
Plant and Machinery cost: Rs. 66 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 52.00 |
|
Break Even Point (BEP): 30.00 |
TCI : Rs. 1179 Lakhs |
|
Cost of Project : 0 |
In case of Photovoltaic or direct conversion of sunlight to electricity via solar cell, the efficiencies limited to about 20 percent of the absorbed s...
|
Capacity : - |
Plant and Machinery cost: - |
|
Working Capital : - |
Rate of Return (ROR): 1.00 |
|
Break Even Point (BEP): 0.00 |
TCI : - |
|
Cost of Project : 0 |