Please choose a project below related to this category.
The most common, versatile and oldest material that is used for making furniture is wood. Almost all varieties of furniture can be made of wood. Wood...
|
Capacity : 48000 Pcs./Annum (Wooden Laboratory Furniture), Cabinet, Racks & Benches 20 Pc Per Day., Tables 60 Pcs & Chair 40 Pcs. Per Day. |
Plant and Machinery cost: 42 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 288 Lakhs |
|
Cost of Project : 0 |
Steel is the most widely used material in a large variety of applications both simple and sophisticated. Steel is produced through two process routes;...
|
Capacity : 1020000 MT/Annum Steel Round Section |
Plant and Machinery cost: 987 Crores |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 54.00 |
TCI : Cost of Project : 1175 Crores |
|
Cost of Project : 0 |
Manganese dioxide is the inorganic compound with the formula Mno2. This blackish or brown solid occurs naturally as the mineral pyrolusite, which is t...
|
Capacity : 6000 MT/Annum |
Plant and Machinery cost: 127 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 42.00 |
TCI : Cost of Project : 678 Lakhs |
|
Cost of Project : 0 |
The primary objective of the study is to review the technological status of ferroalloys industry in the country in the area of bulk production of sil...
|
Capacity : 12 MT/Day, Ferro Manganese –6 MT/Day, Silico Manganese 3 MT/Day, Ferro Silicon 3 MT/Day |
Plant and Machinery cost: 75 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 36.00 |
|
Break Even Point (BEP): 79.00 |
TCI : Cost of Project : 242 Lakhs |
|
Cost of Project : 0 |
Bottled water industry, colloquially called, the mineral water industry, is a symbol of new life style emerging in India. While a large segment of th...
|
Capacity : - |
Plant and Machinery cost: 403 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 695 Lakhs |
|
Cost of Project : 69500000 |
-
|
Capacity : 50 MT/Day |
Plant and Machinery cost: Rs. 13 Crores |
|
Working Capital : - |
Rate of Return (ROR): 41.00 |
|
Break Even Point (BEP): 45.00 |
TCI : Rs. 18 Crores |
|
Cost of Project : 0 |
-
|
Capacity : 2 MT/Day |
Plant and Machinery cost: Rs. 35 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 46.00 |
TCI : Rs. 176 Lakhs |
|
Cost of Project : 0 |
Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a loose category of surplus, obsolete, broken, or discarded...
|
Capacity : Monitor -10 Pcs/Day, Plastic Granules – 5.33 M.T/Day, Copper Wire Scrap-9 Kg/day, Glass Scrap from C.R.T-270 Kg/Day,Other Metals-800 Kg/Day |
Plant and Machinery cost: 51 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 196 Lakhs |
|
Cost of Project : 0 |
Oxygen and nitrogen are the most important industrial gases finding its application in large quantities in metal fabrication and cutting industries. I...
|
Capacity : 1200 Cubic Meter/Day |
Plant and Machinery cost: 21 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 40.00 |
|
Break Even Point (BEP): 52.00 |
TCI : 68 Lakhs |
|
Cost of Project : 0 |
E-waste is a popular informal name for electronic product nearing the end of their useful life. Computers, televisions, VCR, stereos, copier, and fax...
|
Capacity : Monitor -10 Pcs/Day, Plastic Dana “ 5.33 M.T/Day,Copper Wire Scrap-9 Kg/day, Glass Scrap from C.R.T-270 Kg/Day, Other Metals-800 Kg/Day |
Plant and Machinery cost: 51 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 40.00 |
TCI : 196 Lakhs |
|
Cost of Project : 0 |
The plastic industry in India plays a very important and key role in industrialization. Disposable cups, glasses, plates are used in daily life now a...
|
Capacity : 150 Lakhs Pcs/Annum Cups, 300 Lakhs Pcs/Annum Glass, 150 Lakhs Pcs/Annum Plates |
Plant and Machinery cost: 34 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Cost of Project : 104 Lakhs |
|
Cost of Project : 0 |
Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that it...
|
Capacity : 32,000 Ltrs/Day |
Plant and Machinery cost: 221 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 19.00 |
|
Break Even Point (BEP): 60.00 |
TCI : Cost of Project : 327 Lakhs |
|
Cost of Project : 32700000 |