Please choose a project below related to this category.
Almost a decade ago, the introduction of bottled water or packaged water has changed the traditional of serving and consuming drinking water. Accordin...
|
Capacity : 128000 Packs/Day |
Plant and Machinery cost: 219 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 20.00 |
|
Break Even Point (BEP): 59.00 |
TCI : Cost of Project : 323 Lakhs |
|
Cost of Project : 32300000 |
-
|
Capacity : 7000 Ltrs Packaged Drinking/day, 7000 Nos. Pet Bottles/day |
Plant and Machinery cost: Rs. 60 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 48.00 |
TCI : Rs. 135 Lakhs |
|
Cost of Project : 0 |
Water everywhere, not a CLEAN drop to drink! Who would have thought that there will be a day when sanitation of available water would be more of a co...
|
Capacity : 30,000 Thousand Nos./Annum or 1,00,000 Bottles /day |
Plant and Machinery cost: Rs. 105 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 44.00 |
|
Break Even Point (BEP): 63.00 |
TCI : Cost of Project : Rs. 282 Lakhs |
|
Cost of Project : 28200000 |
Soaps are the earliest form of detergents. Though at present the term detergent is used for synthetic detergent derived from petroleum products. The o...
|
Capacity : Detergent Cake, Powder, Dish washing Cake & Powder Each 1 MT/Day = 4 MT/Day |
Plant and Machinery cost: 28 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 47.00 |
|
Break Even Point (BEP): 37.00 |
TCI : 239 Lakh |
|
Cost of Project : 0 |
Coal tar pitch is the residue from the processing of coal tar. Since pitch constituents over 50% of crude tar, its utilization has a major effect on t...
|
Capacity : 7500 MT/Annum |
Plant and Machinery cost: 143 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 56.00 |
TCI : Cost of Project : 340 Lakhs |
|
Cost of Project : 0 |
Iron powder is used to produce particles in desired range for use in powder metallurgy and metallic pigments. Powder iron made electrolytically makes...
|
Capacity : 2 MT / Day |
Plant and Machinery cost: 23 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 46.00 |
TCI : 176 Lakhs |
|
Cost of Project : 0 |
Iron ore pellets are used in blast / electric furnaces for producing sponge iron and steels. Market by high productivity, lower fuel consumption and...
|
Capacity : 1008000 MT/Annum |
Plant and Machinery cost: 138 Crores |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 55.00 |
TCI : Cost of Project : 224 Crore |
|
Cost of Project : 0 |
Matchbox is one of the most important items. Though it is looked upon as small and insignificant, earlier it was a big problem. In the 17th century,...
|
Capacity : 50000 Nos. /Day |
Plant and Machinery cost: Rs. 5 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 46.00 |
|
Break Even Point (BEP): 52.00 |
TCI : Rs. 29 Lakhs |
|
Cost of Project : 0 |
Manganese sulphate is commercially one of the most important compounds. It is an important mineral based chemical industry. The main constituent of t...
|
Capacity : 2.00 MT / Day |
Plant and Machinery cost: 31 Lakh |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 41.00 |
TCI : 1.26 Crore |
|
Cost of Project : 0 |
Sponge iron is the product created when iron ore is reduced to metallic iron, usually with some kind of carbon (charcoal, etc), at temperatures below...
|
Capacity : 135000 MT / Annum |
Plant and Machinery cost: 7175 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 25.00 |
TCI : Cost of Project : 8923 Lakhs |
|
Cost of Project : 0 |
Iron oxides are extensively used in the preparation of paints. There are two main stains yellow and red. Both these varieties are available in synthe...
|
Capacity : 5 MT/ Day |
Plant and Machinery cost: 80 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 42.00 |
|
Break Even Point (BEP): 42.00 |
TCI : 4 Crores |
|
Cost of Project : 0 |
Disposable needle is widely used by doctors for injection purpose with the help of syringes. With the increase in population in our country, requirem...
|
Capacity : - |
Plant and Machinery cost: 147 Lakhs |
|
Working Capital : - |
Rate of Return (ROR): 43.00 |
|
Break Even Point (BEP): 47.00 |
TCI : Cost of Project : 426 Lakhs |
|
Cost of Project : 0 |