• 0

Project Consultancy, Reports & Profiles


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Synthetic Red & Yellow Iron Oxide and Other Oxides of Iron
Synthetic Red & Yellow Iron Oxide and Other Oxides of Iron

Iron oxides are extensively used in the preparation of paints. There are two main stains yellow and red. Both these varieties are available is synt... Read More

Capacity :
5 Ton/Day
Plant and Machinery cost:
43.00 Lakhs
Working Capital :
32.00
Rate of Return (ROR):
44.72%
Break Even Point (BEP):
60.61 %
TCI :
174.00 Lakhs
Cost of Project :
174.00Lakhs
Add To Inquiry Basket
Perfumery Chemicals (Synthetic & Natural)
Perfumery Chemicals (Synthetic & Natural)
Perfumery chemicals are largely utilized in the production of different type of aromatic product like powder,cream, nail polishes, after shave lotions... Read More
Capacity :
100 Kg/Day
Plant and Machinery cost:
7.00 Lakhs
Working Capital :
14.00
Rate of Return (ROR):
50.07%
Break Even Point (BEP):
54.86 %
TCI :
40.00 Lakhs
Cost of Project :
40.00Lakhs
Add To Inquiry Basket
Synthetic Floating In Fishing Industry
Synthetic Floating In Fishing Industry

Floating agent in the fishing industry has indirect relation. It has very good relation with fisheries. Fisherman has applied it lot for spreading ... Read More

Capacity :
400 Plots/Day
Plant and Machinery cost:
55.00 Lakhs
Working Capital :
166.00
Rate of Return (ROR):
40.87%
Break Even Point (BEP):
43.20 %
TCI :
281.30 Lakhs
Cost of Project :
281.30Lakhs
Add To Inquiry Basket
Synthetic Pollen
Synthetic Pollen

Synthetic Pollen is a beautiful artificial article used in synthetic flowers. Now a day it has rapid use in the making of synthetic flowers. Market... Read More

Capacity :
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Synthetic Floats For Fishing Industry
Synthetic Floats For Fishing Industry

Floating agent in the fishing industry has indirect relation. It has very good relation with fisheries. Fisherman has applied it lot for spreading ... Read More

Capacity :
400.00 Floats/Day
Plant and Machinery cost:
69.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
40.00 %
TCI :
344.00 Lakhs
Cost of Project :
344.00Lakhs
Add To Inquiry Basket
Synthetic Iron Oxide
Synthetic Iron Oxide

Synthetic iron oxides possess good tinting strength and excellent hiding powder. It is also light fast, resistant to alkalies and is available in y... Read More

Capacity :
5.00 MT/day
Plant and Machinery cost:
61.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
40.00 %
TCI :
286.00 Lakhs
Cost of Project :
286.00Lakhs
Add To Inquiry Basket
SYNTHETIC IRON OXIDE (Red, Yellow and other Oxides of Iron)
SYNTHETIC IRON OXIDE (Red, Yellow and other Oxides of Iron)

Iron oxides are extensively used in the preparation of paints. There are two main stains yellow and red. Both these varieties are available in synt... Read More

Capacity :
5 MT/ Day
Plant and Machinery cost:
80.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
42.00 %
TCI :
400.00 Lakhs
Cost of Project :
400.00Lakhs
Add To Inquiry Basket
SYNTHETIC RUTILE FROM ILMENITE
SYNTHETIC RUTILE FROM ILMENITE
Titanium is relatively abundant in the earth’s crust, which is usually found in igneous and metamorphic rocks as ilmenite (FeTiO3), rutile (TiO2) an... Read More
Capacity :
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
1.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Synthetic Tannin Powder For Leather Industry
Synthetic Tannin Powder For Leather Industry
The term tannin refers to the use of tannins in tanning animal hides into leather; hence the words tan and tanning for the treatment of leather. H... Read More
Capacity :
3000 MT/ Annum
Plant and Machinery cost:
159.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
53.00 %
TCI :
506.00 Lakhs
Cost of Project :
506.00Lakhs
Add To Inquiry Basket
Synthetic Tannin Powder for Leather Industry
Synthetic Tannin Powder for Leather Industry

The term tannin refers to the use of tannins in tanning animal hides into leather. Synthetic tannins are used in tanneries as replacement to compli... Read More

Capacity :
3000 MT/ Annum
Plant and Machinery cost:
159.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.52%
Break Even Point (BEP):
53.71 %
TCI :
506.00 Lakhs
Cost of Project :
506.00Lakhs
Add To Inquiry Basket
Synthetic Red Iron Oxide
Synthetic Red Iron Oxide

Iron oxides are chemical compounds composed of iron and oxygen. All together, there are sixteen known iron oxides and oxyhy... Read More

Capacity :
1500Mt/annum
Plant and Machinery cost:
84.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
292.00Lakhs
Add To Inquiry Basket
Synthetic Red Iron Oxide Manufacturing Business
Synthetic Red Iron Oxide Manufacturing Business

Synthetic Red Iron Oxide Manufacturing Business. Production of Iron Oxide Pigments. Synthetic... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Synthetic Rubber
Synthetic Rubber

Rubber in its native form is basicall... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Perfumery Chemicals (Synthetic & Natural)
Perfumery Chemicals (Synthetic & Natural)

Perfumeis a mixture of fragrant essential oils or aroma compounds, fixatives and solvents, used to give the human body... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Synthetic Ruby and Sapphire
Synthetic Ruby and Sapphire

Synthetic Ruby

Sy... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Camphor Tablet (Synthetic)
Camphor Tablet (Synthetic)

Camphor Tablet is one of the most common forms of camphor available in the market. Its main use is in religious purpos... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Synthetic Camphor
Synthetic Camphor

Camphor is a waxy, flammable, white or transparent solid with a strong aroma. It is a terpenoid with the chemical form... Read More

Capacity :
2,500 MT per Annum
Plant and Machinery cost:
359.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1192.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Synthetic Red & Yellow Ir... 5 Ton/Day 44.72 174.00
Perfumery Chemicals (Synt... 100 Kg/Day 50.07 40.00
Synthetic Floating In Fis... 400 Plots/Day 40.87 281.30
Synthetic Pollen 0.00 0.00
Synthetic Floats For Fish... 400.00 Floats/Day 41.00 344.00
Synthetic Iron Oxide 5.00 MT/day 45.00 286.00
SYNTHETIC IRON OXIDE (Red... 5 MT/ Day 42.00 400.00
SYNTHETIC IRON OXIDE FROM... 42.00 507.00
SYNTHETIC RUTILE FROM ILM... 1.00 0.00
Synthetic Tannin Powder F... 3000 MT/ Annum 25.00 506.00
Synthetic Tannin Powder f... 3000 MT/ Annum 26.52 506.00
Synthetic Red Iron Oxide 1500Mt/annum 28.00 292.00
Synthetic Red Iron Oxide ... 0 0.00 0.00
Synthetic Rubber 0 0.00 0.00
Perfumery Chemicals (Synt... 0 0.00 0.00
Synthetic Ruby and Sapphi... 0 0.00 0.00
Camphor Tablet (Synthetic... 0 0.00 0.00
Synthetic Camphor 2,500 MT per Annum 28.00 1192.00
Start your own industry o... 0 0.00 0.00
Synthetic Soda Ash Produc... Synthetic Soda Ash :60.0 MT / day Calcium Chloride : 48.0 MT/ day 29.00 2093.00
Downhole Seals used for ... Downhole Seals (1-1/4" Swab Cup (100g each): 24,000 Pcs. / day 33.00 506.00
Manufacturing of Downhole... 0 0.00 0.00
Synthetic Camphor (Kapoor... Synthetic Camphor Powder : 8 MT / Day 28.00 1152.00
Detailed Project Report o... 0 0.00 0.00
« Back1 2Next »

Showing 1 - 18 of 24 Product(s)

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.