• 0

Project Consultancy, Reports & Profiles


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Production business of  Silicon Carbide Abrasive Nozzle Liners
Production business of Silicon Carbide Abrasive Nozzle Liners

 

Silicon Carbide Abrasive Nozzle Liners (SCANL) are the latest breakthrough in abrasive technology, and they ... Read More

Capacity :
Silicon Carbide Abrasive Nozzle Liner: 10,000 Nos. Per Annum
Plant and Machinery cost:
178.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
454.00Lakhs
Add To Inquiry Basket
Be a Donkey Breeder Start Your Own Donkey Farm And Make More Money Than You Could Imagine
Be a Donkey Breeder Start Your Own Donkey Farm And Make More Money Than You Could Imagine

 

Introduction:

"Donkey milk farming" is the practice ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Wire Nails
Manufacturing Business Of Wire Nails

Wire nails are a type of fastener typically used... Read More

Capacity :
Wire Nails: 48,000 MT Per Annum
Plant and Machinery cost:
1800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
2600.00Lakhs
Add To Inquiry Basket
A Business Plan for Aluminium Ingots from Aluminium Scrap
A Business Plan for Aluminium Ingots from Aluminium Scrap

Aluminium ingots from aluminium scrap are metal ... Read More

Capacity :
Aluminium Alloy Ingots: 6,000 MT per Annum Aluminium Scrap: 99 MT per Annum
Plant and Machinery cost:
500.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
1100.00Lakhs
Add To Inquiry Basket
Start Production of Cold Pressed Rice Bran Oil (Edible Oil)
Start Production of Cold Pressed Rice Bran Oil (Edible Oil)

Cold Pressed R... Read More

Capacity :
Cold Pressed Rice Bran Oil (Edible Oil) : 270,000 Ltrs Per Annum
Plant and Machinery cost:
20.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
161.00Lakhs
Add To Inquiry Basket
Setup Plant Of Super Absorbent Polymer
Setup Plant Of Super Absorbent Polymer

Super Absorben... Read More

Capacity :
Super Absorbent Polymer: 30,000 MT Per Annum
Plant and Machinery cost:
2000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
4900.00Lakhs
Add To Inquiry Basket
How to Setup Silicon Carbide Abrasive Nozzle Liners Plant
How to Setup Silicon Carbide Abrasive Nozzle Liners Plant

What Are Silicon Carbide Abrasive Nozzle Liners? Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Production of Nicotine USP99+
Start Production of Nicotine USP99+

Nicotine USP99+ is a form of highly concentrated nicotine produced... Read More

Capacity :
-
Plant and Machinery cost:
156.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
436.00Lakhs
Add To Inquiry Basket
Start-up Production of MS Barrels (Metal Barrels) Used in Oil Packaging
Start-up Production of MS Barrels (Metal Barrels) Used in Oil Packaging

MS Barrels, also known as Metal Barrels, are specially designed containers used for p... Read More

Capacity :
MS Barrels (Metal Barrels): 210,000 Units Per Annum, MS Scrap: 300 Units Per Annum
Plant and Machinery cost:
148.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
484.00Lakhs
Add To Inquiry Basket
Start Industry Of Potato Starch
Start Industry Of Potato Starch

Potato starch ... Read More

Capacity :
Potato Starch 30 MT Per Day
Plant and Machinery cost:
329.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
894.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of NC Thinner
Manufacturing Business Of NC Thinner

Nitrocellulose thinning is a process where nitrocellulose (NC) is used to reduce the ... Read More

Capacity :
-
Plant and Machinery cost:
36.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
70.00 %
TCI :
0.00 Lakhs
Cost of Project :
150.00Lakhs
Add To Inquiry Basket
Setup Own Business of Latex Mattress
Setup Own Business of Latex Mattress

 

Product:<... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
How to Start Your Own Glass Fiber Reinforced Polymer (GFRP) Rebar Business
How to Start Your Own Glass Fiber Reinforced Polymer (GFRP) Rebar Business

Product: Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan for Sodium Chlorite (NaClO2) Direct Electrolysis Process from Sodium Chloride to Sodium Chlorite
A Business Plan for Sodium Chlorite (NaClO2) Direct Electrolysis Process from Sodium Chloride to Sodium Chlorite

Sodium chlorite is a chemical compound with the formula NaClO2. It is a white crystalline solid, odourles... Read More

Capacity :
Sodium Chlorite (NaClO2) 15 MT Per Day
Plant and Machinery cost:
567.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
1892.00Lakhs
Add To Inquiry Basket
A Business Plan for Highway Guard Crash Barrier with Metal Beam  (Roll Forming) And Galvanizing Plant
A Business Plan for Highway Guard Crash Barrier with Metal Beam (Roll Forming) And Galvanizing Plant

Metal beam crash barriers, also known as guardrails, are an important safety feature on highways, bridges... Read More

Capacity :
Metal Beam Highway Crash Barrier 167 MT per day MS Sheet Scrap 33 MT per day
Plant and Machinery cost:
701.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
2608.00Lakhs
Add To Inquiry Basket
A Business Plan for Soda Ash By Solvay Process (without using limestone)
A Business Plan for Soda Ash By Solvay Process (without using limestone)

 

Soda ash, also known as sodium carbonate, is an essential chemical used in various industrial a... Read More

Capacity :
Soda Ash (Na2CO3) 200,000 MT Per Annum Ammonium Chloride (NH4Cl) 200,000 MT Per Annum
Plant and Machinery cost:
132500.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
13.00%
Break Even Point (BEP):
36.00 %
TCI :
0.00 Lakhs
Cost of Project :
146900.00Lakhs
Add To Inquiry Basket
Engineered Building Steel Structure Manufacturing Business
Engineered Building Steel Structure Manufacturing Business

Pre-Engineered Building (PEB) Steel Structures are a type of building system used for... Read More

Capacity :
PEB Structure 40 MT Per Day Steel Scrap waste Product 2 MT Per Day
Plant and Machinery cost:
462.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
28.00 %
TCI :
0.00 Lakhs
Cost of Project :
5600.00Lakhs
Add To Inquiry Basket
Start Lithium Oxide From Lithium Ore Manufacturing Plant
Start Lithium Oxide From Lithium Ore Manufacturing Plant

Lithium oxide, also known as lithia, is a chemical compound c... Read More

Capacity :
Lithium Oxide 4 MT Per Day
Plant and Machinery cost:
578.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
2808.00Lakhs
Add To Inquiry Basket
Start Maize Starch & Liquid Glucose Production Plant
Start Maize Starch & Liquid Glucose Production Plant

 

Maize starch is a white powder that is derived from the endosperm of the ma... Read More

Capacity :
-
Plant and Machinery cost:
3000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
4300.00Lakhs
Add To Inquiry Basket
Start Production Of Nickel From Nickel Ore
Start Production Of Nickel From Nickel Ore

Nickel is an essential elem... Read More

Capacity :
Nickel Cathod 4 MT Per Day
Plant and Machinery cost:
638.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
3030.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Biodegradable Boxes From Rice Straw and Rice Husk
Manufacturing Business Of Biodegradable Boxes From Rice Straw and Rice Husk

In place of conventional pa... Read More

Capacity :
Biodegradable Boxes wt. 30 gms 15,160,000 Nos Per Annum
Plant and Machinery cost:
39.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
280.00Lakhs
Add To Inquiry Basket
A Business Plan for Epoxy Resin
A Business Plan for Epoxy Resin

Epoxy resin is a form of thermosetting polymer that is widely utilized in many indust... Read More

Capacity :
Epoxy Resin Liquid 100 MT Per Day
Plant and Machinery cost:
1800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
4300.00Lakhs
Add To Inquiry Basket
Granite Aggregate Trading Business for Export
Granite Aggregate Trading Business for Export

Granite aggregates (pieces) are obtained from block cutting unit by cutting of Granite Gang saw blocks. After careful selection of each piece of eq... Read More

Capacity :
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
48.00%
Break Even Point (BEP):
82.00 %
TCI :
72.00 Lakhs
Cost of Project :
72.00Lakhs
Add To Inquiry Basket
Bicycle Plant
Bicycle Plant

As a machine, the bicycle is found to deliver about 75 watts, travelling at 18 kmph on a sustained basis, although on a very short term basis power... Read More

Capacity :
7000 Nos. / Day
Plant and Machinery cost:
5718.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
47.00 %
TCI :
7861.00 Lakhs
Cost of Project :
7861.00Lakhs
Add To Inquiry Basket
CLAY AND SAND BRICKS PLANT (LIGHT WEIGHT)
CLAY AND SAND BRICKS PLANT (LIGHT WEIGHT)

Perforated bricks are light in weight and provide better thermal insulation as compared to common bricks. Now in India there is a very good growth ... Read More

Capacity :
60 Lakhs Bricks /Annum
Plant and Machinery cost:
27.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
39.00 %
TCI :
135.00 Lakhs
Cost of Project :
135.00Lakhs
Add To Inquiry Basket
Granite (Marble) Polishing Batti (Bar)
Granite (Marble) Polishing Batti (Bar)

Marble polishing batti is an essential item in the marble and granite polishing industries. Now a days there is good market demand of granite and m... Read More

Capacity :
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.63%
Break Even Point (BEP):
40.77 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

Disposable syringes are a great innov... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Diamond Blade
Diamond Blade

Diamond blade is an instrument or cutting machines, which is broadly used for cutting of very hard materials. It is basically manufactured by using... Read More

Capacity :
20000 Nos./Day
Plant and Machinery cost:
81.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.90%
Break Even Point (BEP):
73.60 %
TCI :
143.00 Lakhs
Cost of Project :
143.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
Setup Plant Of Lab Cultu... Lab Cultured Diamonds (1 Carat) 30 Carat Per Day 25.00 361.00
Start Lemon Processing Un... Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs 25.00 314.00
Solar PV (Photovoltaic) G... Solar PV (Photovoltaic) Glass 90,000 MT Per Annum 28.00 4200.00
A Business Plan For Pea P... Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day 27.00 614.00
Setup Plant Of Acrylate... Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum 30.00 2291.00
Start Latex Rubber Thread... Latex Rubber Thread 200 Kg. Per Day 26.00 412.00
Start Cosmetic Unit (Seru... - 36.00 1617.00
Pioneering Pea Protein Bu... 0 0.00 0.00
Start Production Of Silic... - 28.00 4716.00
A Business Plan for IV Fl... IV Fluids (500 ml Size Pack) 78,000 Packs Per Day 27.00 1263.00
Start Industry of Liquor ... Wine (750 ml Size) 4,000,000 Bottles per annum Whiskey (375 ml Size) 4,000,000 Bottles per annum B 28.00 1880.00
Setup Pharmaceutical Unit... - 37.00 35774.00
Start Industry with Serum... 0 0.00 0.00
Setup Unit Of Cement Plan... Cement Plant 40,000 Bags per Day 26.00 25200.00
A Business Plan for Steri... Sterial Water for Injection 500 ml Size Pack 20,000 Sachets Per Day 30.00 1234.00
Setup Plant Of Lead From ... Lead Ingot 30 MT Per Day 28.00 2231.00
A Business Plan Blood Col... - 28.00 2294.00
A Business Plan for Parac... Paracetamol Powder 7 MT Per Day 27.00 779.00
Start Manufacturing Busin... Baby Diapers (4 Pcs.) 84,000 Pkts Per Day Adult Diapers (4 Pcs.) 18,000 Pkts Per Day Sanitary 29.00 4201.00
Start Tissue Paper Manufa... Tissue Paper 20 MT Per Day 27.00 2101.00
Biodegradable Disposable ... - 27.00 2774.00
Setup Curcumin Extraction... Curcumin Powder 100 Kgs per day Turmeric Oil 47 Kgs per day Deoiled Turmeric 1,853 Kgs 28.00 491.00
Setup Active Pharmaceutic... Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs 33.00 5246.00
Manufacturing Business Pl... Zinc Ingots (Purity 98%) 6 MT Per Day 29.00 863.00
Ferrochrome Manufacturing... Ferrochrome 135 MT Per Day 10.00 40400.00
Start a Business Of LPG C... LPG Cylinders (14.20 Kgs Size) 3,334.0 Nos. per day LPG Cylinders (19 Kgs Size) 3,334.0 Nos. per day 32.00 3475.00
12345678910...
« Back8 9 10 11 12Next »

Showing 661 - 689 of 689 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.