• 0

Project Consultancy, Reports & Profiles


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Oxygen and Nitrogen Gas Plant
Oxygen and Nitrogen Gas Plant

Oxygen and nitrogen are the most important industrial gases finding its application in large quantities in metal fabrication and cutting industries... Read More

Capacity :
1200 Cubic Meter/Day
Plant and Machinery cost:
21.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
40.00%
Break Even Point (BEP):
52.00 %
TCI :
68.00 Lakhs
Cost of Project :
68.00Lakhs
Add To Inquiry Basket
Good Future Prospects for E-WASTE RECYCLING PLANT (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))
Good Future Prospects for E-WASTE RECYCLING PLANT (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))

Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a loose category of surplus, obsolete, broken, or discar... Read More

Capacity :
Monitor -10 Pcs/Day, Plastic Granules – 5.33 M.T/Day, Copper Wire Scrap-9 Kg/day, Glass Scrap
Plant and Machinery cost:
51.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
47.00%
Break Even Point (BEP):
40.00 %
TCI :
196.00 Lakhs
Cost of Project :
196.00Lakhs
Add To Inquiry Basket
Bicycle Plant
Bicycle Plant

As a machine, the bicycle is found to deliver about 75 watts, travelling at 18 kmph on a sustained basis, although on a very short term basis power... Read More

Capacity :
7000 Nos. / Day
Plant and Machinery cost:
5718.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
47.00 %
TCI :
7861.00 Lakhs
Cost of Project :
7861.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

Disposable syringes are a great innov... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Wooden Furniture (With Me... 20 Articles/Day 42.81 73.00
Bicycle Tyres 4000 Nos./Day 59.50 163.00
Wooden Furniture 20 Pcs/Day 111.00 13.00
Paper Napkins 400 Kgs./ Day 43.88 0.00
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
Start Production Of Potat... Potato Flakes 2 MT Per Day 25.00 563.00
Setup Manufacturing Unit ... Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day 31.00 575.00
Opportunity in Sodium Sul... Sodium Sulfide Flakes 10,000 MT Per Annum 30.00 1426.00
Business Plan for Lithium... - 29.00 812.00
Start Manufacturing Busin... Cargo Containers (Size 20 Feet) 34 Nos Per Day 29.00 1992.00
Start Cutting and Grindin... Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day 28.00 423.00
Mink Blankets Production - 27.00 6000.00
A Business Plan for Micro... Micronutrient Fortified Energy Dense Food 100 MT Per Day 28.00 3500.00
Start Business of Caustic... - 25.00 56500.00
Start Crumb Rubber Powder... Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day 26.00 303.00
Start Rice Milling Plant - 28.00 824.00
Start Manufacturing of Wo... Wooden Pencils 69,444 Gross Per Day 28.00 2400.00
A Business Plan for Monoc... Monocrystalline Silicon Ingots 400 Kgs Per Day 28.00 555.00
A Business Plan for Fiber... Fiberglass Tape 24,000 Mtrs. Per Day 28.00 442.00
Setup Plant of Compressed... - 28.00 950.00
Starting a Glass Bottles ... 300 MT Per Day 27.00 10600.00
Calcium Chloride Manufact... Calcium Chloride (Flakes): 1667 MT Per Day Carbon Di-oxide (By Product): 463 MT Per Day 26.00 101000.00
Cashew Nut Processing wit... White Cashew Nut: 200 Kgs Per Day Roasted Cashew Nut: 200 Kgs Per Day Fried Cashew Nut: 200 Kg 30.00 198.00
Cashew Nut Processing wit... White Cashew Nut: 200 Kgs Per Day Roasted Cashew Nut: 200 Kgs Per Day Fried Cashew Nut: 200 Kgs 29.00 200.00
Iodine Granules from Iodi... 200 MT Per Annum 31.00 600.00
Activated Carbon from Coc... 6 MT Per Day 29.00 720.00
Di-Calcium Phosphate: A P... Di-Calcium Phosphate (Powder): 25 MT Per Day Calcium Chloride (Flakes) by Product: 34 MT Per Day Hy 29.00 2800.00
Sanitary Napkins Manufact... Sanitary Napkins 8pcs in one pkt. (260 mm Size):  21,600 PKTS Per Day 31.00 305.00
Low Toxicity Base Oil fro... 100,000 Ltrs. Per Day 43.00 7200.00
12345678910...
« Back7 8 9 10 11Next »

Showing 601 - 604 of 604 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.