• 0

Project Consultancy, Reports & Profiles


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Medium Density Fiberboard (MDF) Manufacturing Business
Medium Density Fiberboard (MDF) Manufacturing Business

As a dry-formed panel product made from lignocellulosic fibers mixed with a synthetic resin or other suitable binder, ... Read More

Capacity :
100 CBM per Day
Plant and Machinery cost:
1800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
3100.00Lakhs
Add To Inquiry Basket
Best Plan of Tennis Rackets Manufacturing Business Start Your Own Tennis Rackets Manufacturing Business
Best Plan of Tennis Rackets Manufacturing Business Start Your Own Tennis Rackets Manufacturing Business

 

A Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan for Silica From Rice Husk Ash
A Business Plan for Silica From Rice Husk Ash

 

The high silica content in the rice husk ash has attract... Read More

Capacity :
0
Plant and Machinery cost:
745.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
1288.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Biodegradable Plastic Bags From Corn & Cassava Starch Granules
Manufacturing Business Of Biodegradable Plastic Bags From Corn & Cassava Starch Granules

 

Biodegradable plastic is plastic that decomposes naturally in t... Read More

Capacity :
0
Plant and Machinery cost:
101.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
75.00 %
TCI :
0.00 Lakhs
Cost of Project :
324.00Lakhs
Add To Inquiry Basket
Red Chilli Oleoresin Manufacturing Business
Red Chilli Oleoresin Manufacturing Business

 

Chili oleoresin is a natural extract of chili pepp... Read More

Capacity :
Chilli Oleoresin 6,250 Kg Per Day
Plant and Machinery cost:
1988.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
3250.00Lakhs
Add To Inquiry Basket
Start a Business of Low Relaxation Pre-stressed Concrete Steel Strand (LRPC)
Start a Business of Low Relaxation Pre-stressed Concrete Steel Strand (LRPC)

Since the 1950s, Low Relaxation Pre-stressed Concrete Steel ... Read More

Capacity :
Low Relaxation Pre-stressed Concrete 83.3 MT Per Day Steel Strand (LRPC)
Plant and Machinery cost:
3561.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
5370.00Lakhs
Add To Inquiry Basket
Moringa Leaf Powder Production Business
Moringa Leaf Powder Production Business

 

India is the prime producer of Moringa (Drumstick) with an annual production of... Read More

Capacity :
Moringa Leaf Powder 1,000 Kg Per Day
Plant and Machinery cost:
55.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
189.00Lakhs
Add To Inquiry Basket
Manufacturing Business Aluminium Cans & Easy Open End (EOE) for Beverages
Manufacturing Business Aluminium Cans & Easy Open End (EOE) for Beverages

Aluminium cans and easy open end (EOE) for beverages are a t... Read More

Capacity :
Aluminium Cans & Easy Open End (EOE) 40 Lakh Pcs. Per Day
Plant and Machinery cost:
46000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
27.00 %
TCI :
0.00 Lakhs
Cost of Project :
72100.00Lakhs
Add To Inquiry Basket
Production Business Of Medium-Density Polyethylene (MDPE) Pipes
Production Business Of Medium-Density Polyethylene (MDPE) Pipes

Medium-density polyethylene (MDPE) is a type of polyethylene... Read More

Capacity :
MDPE Pipes 5,400 Kgs per day
Plant and Machinery cost:
94.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
376.00Lakhs
Add To Inquiry Basket
Set Up Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan
Set Up Activated Carbon From Rice Husk Saw Dust & Coconut Shell Manufacturing Business Plan

 

Activated carbon is a type of carbon that has been... Read More

Capacity :
Activated Carbon 2,000 Kg Per Day
Plant and Machinery cost:
334.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
606.00Lakhs
Add To Inquiry Basket
Manufacturing Business of Milk and Milk Powder | Most Profitable and High Demandable Business of Milk Processing
Manufacturing Business of Milk and Milk Powder | Most Profitable and High Demandable Business of Milk Processing

The Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Plant of Red Chili Oleoresin Production Red Chili Oleoresin Manufacturing Business Plant
Plant of Red Chili Oleoresin Production Red Chili Oleoresin Manufacturing Business Plant

The oil-soluble red chilli extract known as Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
The Fuel of the Future Compressed Bio Gas CBG Bio CNG plant Save Money and Help save Our Planet with This Eco-Friendly Fuel
The Fuel of the Future Compressed Bio Gas CBG Bio CNG plant Save Money and Help save Our Planet with This Eco-Friendly Fuel

Energy production using Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Copper Powder  Using Electrolytic Copper Refining and  Water Atomization Technology
Copper Powder Using Electrolytic Copper Refining and Water Atomization Technology

Copper powder is an essenti... Read More

Capacity :
1,20,000 Kgs Per Annum
Plant and Machinery cost:
170.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
338.00Lakhs
Add To Inquiry Basket
ISO Freight Containers
ISO Freight Containers

 

An ISO freight co... Read More

Capacity :
15,000 Nos. Per Annum 15,000 Nos. Per Annum
Plant and Machinery cost:
4560.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
12.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
9658.00Lakhs
Add To Inquiry Basket
Manufacturing Business of Potassium Permanganate
Manufacturing Business of Potassium Permanganate

 

Potassium permang... Read More

Capacity :
5,000 MT Per Annum
Plant and Machinery cost:
176.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
1287.00Lakhs
Add To Inquiry Basket
Start a Business Of Ethyl Acetate
Start a Business Of Ethyl Acetate

 

Ethyl Acetate, al... Read More

Capacity :
30,000 MT Per Annum
Plant and Machinery cost:
2665.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
39.00 %
TCI :
0.00 Lakhs
Cost of Project :
7206.00Lakhs
Add To Inquiry Basket
Most Profitable Business Idea of Triacetin Start Your Own Business of Triacetin
Most Profitable Business Idea of Triacetin Start Your Own Business of Triacetin

 

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing Business plan of Auto Piston
Manufacturing Business plan of Auto Piston

 

Automotive piston... Read More

Capacity :
0
Plant and Machinery cost:
348.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
36.00%
Break Even Point (BEP):
31.00 %
TCI :
0.00 Lakhs
Cost of Project :
2890.00Lakhs
Add To Inquiry Basket
Start manufacturing business of Chocolate
Start manufacturing business of Chocolate

 

Chocolate is a de... Read More

Capacity :
0
Plant and Machinery cost:
162.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
496.00Lakhs
Add To Inquiry Basket
Recycled Polyester Fiber from used PET Bottles Manufacturing Business
Recycled Polyester Fiber from used PET Bottles Manufacturing Business

 

Recycled polyester fiber is made by recycling ... Read More

Capacity :
Recycled Polyester Fiber 1,500,000 Kgs Per Annum
Plant and Machinery cost:
76.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
393.00Lakhs
Add To Inquiry Basket
Basic Voilet 10 (Rhodamine B Base) Production Business
Basic Voilet 10 (Rhodamine B Base) Production Business

Basic Violet 10 is a dye th... Read More

Capacity :
Basic Voilet 10 420 MT Per Annum
Plant and Machinery cost:
34.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
306.00Lakhs
Add To Inquiry Basket
Setup Steel Ingot from Scrap Business
Setup Steel Ingot from Scrap Business

Steel Ingot from Scrap come... Read More

Capacity :
Steel Ingot 3,000 MT Per Annum
Plant and Machinery cost:
445.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
1192.00Lakhs
Add To Inquiry Basket
Global and India Type 4 Cylinders Market
Global and India Type 4 Cylinders Market

Global and India Type 4 Cylinders Market, Growth Rate, Covid-... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start production of Disposable Plastic Cups, Plates & Glasses
Start production of Disposable Plastic Cups, Plates & Glasses

 

Disposable plastic cups, plates, and glasses are made from sustainable materials such as sugarc... Read More

Capacity :
-
Plant and Machinery cost:
176.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
442.00Lakhs
Add To Inquiry Basket
Ethyl Acetate from Ethanol Business plan
Ethyl Acetate from Ethanol Business plan

 

Ethyl acetate is a chemical compound that is used in a variety of industrial processes. It is commonly deriv... Read More

Capacity :
Ethyl Acetate: 6,000 MT. Per Annum
Plant and Machinery cost:
1131.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
2054.00Lakhs
Add To Inquiry Basket
Production business of  Silicon Carbide Abrasive Nozzle Liners
Production business of Silicon Carbide Abrasive Nozzle Liners

 

Silicon Carbide Abrasive Nozzle Liners (SCANL) are the latest breakthrough in abrasive technology, and they ... Read More

Capacity :
Silicon Carbide Abrasive Nozzle Liner: 10,000 Nos. Per Annum
Plant and Machinery cost:
178.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
454.00Lakhs
Add To Inquiry Basket
Be a Donkey Breeder Start Your Own Donkey Farm And Make More Money Than You Could Imagine
Be a Donkey Breeder Start Your Own Donkey Farm And Make More Money Than You Could Imagine

 

Introduction:

"Donkey milk farming" is the practice ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Wire Nails
Manufacturing Business Of Wire Nails

Wire nails are a type of fastener typically used... Read More

Capacity :
Wire Nails: 48,000 MT Per Annum
Plant and Machinery cost:
1800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
2600.00Lakhs
Add To Inquiry Basket
A Business Plan for Aluminium Ingots from Aluminium Scrap
A Business Plan for Aluminium Ingots from Aluminium Scrap

Aluminium ingots from aluminium scrap are metal ... Read More

Capacity :
Aluminium Alloy Ingots: 6,000 MT per Annum Aluminium Scrap: 99 MT per Annum
Plant and Machinery cost:
500.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
1100.00Lakhs
Add To Inquiry Basket
Start Production of Cold Pressed Rice Bran Oil (Edible Oil)
Start Production of Cold Pressed Rice Bran Oil (Edible Oil)

Cold Pressed R... Read More

Capacity :
Cold Pressed Rice Bran Oil (Edible Oil) : 270,000 Ltrs Per Annum
Plant and Machinery cost:
20.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
161.00Lakhs
Add To Inquiry Basket
Setup Plant Of Super Absorbent Polymer
Setup Plant Of Super Absorbent Polymer

Super Absorben... Read More

Capacity :
Super Absorbent Polymer: 30,000 MT Per Annum
Plant and Machinery cost:
2000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
4900.00Lakhs
Add To Inquiry Basket
How to Setup Silicon Carbide Abrasive Nozzle Liners Plant
How to Setup Silicon Carbide Abrasive Nozzle Liners Plant

What Are Silicon Carbide Abrasive Nozzle Liners? Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Production of Nicotine USP99+
Start Production of Nicotine USP99+

Nicotine USP99+ is a form of highly concentrated nicotine produced... Read More

Capacity :
-
Plant and Machinery cost:
156.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
436.00Lakhs
Add To Inquiry Basket
Start-up Production of MS Barrels (Metal Barrels) Used in Oil Packaging
Start-up Production of MS Barrels (Metal Barrels) Used in Oil Packaging

MS Barrels, also known as Metal Barrels, are specially designed containers used for p... Read More

Capacity :
MS Barrels (Metal Barrels): 210,000 Units Per Annum, MS Scrap: 300 Units Per Annum
Plant and Machinery cost:
148.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
484.00Lakhs
Add To Inquiry Basket
Start Industry Of Potato Starch
Start Industry Of Potato Starch

Potato starch ... Read More

Capacity :
Potato Starch 30 MT Per Day
Plant and Machinery cost:
329.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
894.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of NC Thinner
Manufacturing Business Of NC Thinner

Nitrocellulose thinning is a process where nitrocellulose (NC) is used to reduce the ... Read More

Capacity :
-
Plant and Machinery cost:
36.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
70.00 %
TCI :
0.00 Lakhs
Cost of Project :
150.00Lakhs
Add To Inquiry Basket
Setup Own Business of Latex Mattress
Setup Own Business of Latex Mattress

 

Product:<... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
How to Start Your Own Glass Fiber Reinforced Polymer (GFRP) Rebar Business
How to Start Your Own Glass Fiber Reinforced Polymer (GFRP) Rebar Business

Product: Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan for Sodium Chlorite (NaClO2) Direct Electrolysis Process from Sodium Chloride to Sodium Chlorite
A Business Plan for Sodium Chlorite (NaClO2) Direct Electrolysis Process from Sodium Chloride to Sodium Chlorite

Sodium chlorite is a chemical compound with the formula NaClO2. It is a white crystalline solid, odourles... Read More

Capacity :
Sodium Chlorite (NaClO2) 15 MT Per Day
Plant and Machinery cost:
567.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
1892.00Lakhs
Add To Inquiry Basket
A Business Plan for Highway Guard Crash Barrier with Metal Beam  (Roll Forming) And Galvanizing Plant
A Business Plan for Highway Guard Crash Barrier with Metal Beam (Roll Forming) And Galvanizing Plant

Metal beam crash barriers, also known as guardrails, are an important safety feature on highways, bridges... Read More

Capacity :
Metal Beam Highway Crash Barrier 167 MT per day MS Sheet Scrap 33 MT per day
Plant and Machinery cost:
701.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
2608.00Lakhs
Add To Inquiry Basket
A Business Plan for Soda Ash By Solvay Process (without using limestone)
A Business Plan for Soda Ash By Solvay Process (without using limestone)

 

Soda ash, also known as sodium carbonate, is an essential chemical used in various industrial a... Read More

Capacity :
Soda Ash (Na2CO3) 200,000 MT Per Annum Ammonium Chloride (NH4Cl) 200,000 MT Per Annum
Plant and Machinery cost:
132500.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
13.00%
Break Even Point (BEP):
36.00 %
TCI :
0.00 Lakhs
Cost of Project :
146900.00Lakhs
Add To Inquiry Basket
Engineered Building Steel Structure Manufacturing Business
Engineered Building Steel Structure Manufacturing Business

Pre-Engineered Building (PEB) Steel Structures are a type of building system used for... Read More

Capacity :
PEB Structure 40 MT Per Day Steel Scrap waste Product 2 MT Per Day
Plant and Machinery cost:
462.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
28.00 %
TCI :
0.00 Lakhs
Cost of Project :
5600.00Lakhs
Add To Inquiry Basket
Start Lithium Oxide From Lithium Ore Manufacturing Plant
Start Lithium Oxide From Lithium Ore Manufacturing Plant

Lithium oxide, also known as lithia, is a chemical compound c... Read More

Capacity :
Lithium Oxide 4 MT Per Day
Plant and Machinery cost:
578.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
2808.00Lakhs
Add To Inquiry Basket
Start Maize Starch & Liquid Glucose Production Plant
Start Maize Starch & Liquid Glucose Production Plant

 

Maize starch is a white powder that is derived from the endosperm of the ma... Read More

Capacity :
-
Plant and Machinery cost:
3000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
4300.00Lakhs
Add To Inquiry Basket
Start Production Of Nickel From Nickel Ore
Start Production Of Nickel From Nickel Ore

Nickel is an essential elem... Read More

Capacity :
Nickel Cathod 4 MT Per Day
Plant and Machinery cost:
638.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
3030.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Biodegradable Boxes From Rice Straw and Rice Husk
Manufacturing Business Of Biodegradable Boxes From Rice Straw and Rice Husk

In place of conventional pa... Read More

Capacity :
Biodegradable Boxes wt. 30 gms 15,160,000 Nos Per Annum
Plant and Machinery cost:
39.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
280.00Lakhs
Add To Inquiry Basket
A Business Plan for Epoxy Resin
A Business Plan for Epoxy Resin

Epoxy resin is a form of thermosetting polymer that is widely utilized in many indust... Read More

Capacity :
Epoxy Resin Liquid 100 MT Per Day
Plant and Machinery cost:
1800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
4300.00Lakhs
Add To Inquiry Basket
A Business Plan For Polyurethane Prepolymer
A Business Plan For Polyurethane Prepolymer

The versatile substance known as polyurethane prepolymer, or PUP, is utilized in a va... Read More

Capacity :
Polyurethane Prepolymer (HMDI Series) 50,000 MT Per Annum
Plant and Machinery cost:
2336.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
4866.00Lakhs
Add To Inquiry Basket
Start Industry of Activated Carbon from Coconut Shell
Start Industry of Activated Carbon from Coconut Shell

An organic form of activate... Read More

Capacity :
Activated Carbon 5 MT per day
Plant and Machinery cost:
316.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
743.00Lakhs
Add To Inquiry Basket
Setup Unit Of Tea Blending and Packaging (Tea, Green Tea & Herbal Tea)
Setup Unit Of Tea Blending and Packaging (Tea, Green Tea & Herbal Tea)

In order to make a distinctive and delectable blend, different teas, including ... Read More

Capacity :
-
Plant and Machinery cost:
41.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
242.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of Blood Bags
Start Manufacturing Business Of Blood Bags

Blood bags are containers designed to store and transport blood and other related pro... Read More

Capacity :
Blood Bags 10,000 Nos per day
Plant and Machinery cost:
291.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
75.00 %
TCI :
0.00 Lakhs
Cost of Project :
1092.00Lakhs
Add To Inquiry Basket
Good Future Prospects for E-WASTE RECYCLING PLANT (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))
Good Future Prospects for E-WASTE RECYCLING PLANT (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))

Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a loose category of surplus, obsolete, broken, or discar... Read More

Capacity :
Monitor -10 Pcs/Day, Plastic Granules – 5.33 M.T/Day, Copper Wire Scrap-9 Kg/day, Glass Scrap
Plant and Machinery cost:
51.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
47.00%
Break Even Point (BEP):
40.00 %
TCI :
196.00 Lakhs
Cost of Project :
196.00Lakhs
Add To Inquiry Basket
IRON ORE PELLETIZATION PLANT
IRON ORE PELLETIZATION PLANT

Iron ore pellets are used in blast / electric furnaces for producing sponge iron and steels. Market by high productivity, lower fuel consumption an... Read More

Capacity :
1008000 MT/Annum
Plant and Machinery cost:
13800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
55.00 %
TCI :
22400.00 Lakhs
Cost of Project :
22400.00Lakhs
Add To Inquiry Basket
Bicycle Plant
Bicycle Plant

As a machine, the bicycle is found to deliver about 75 watts, travelling at 18 kmph on a sustained basis, although on a very short term basis power... Read More

Capacity :
7000 Nos. / Day
Plant and Machinery cost:
5718.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
47.00 %
TCI :
7861.00 Lakhs
Cost of Project :
7861.00Lakhs
Add To Inquiry Basket
TRADING OF IRON ORES
TRADING OF IRON ORES

Steel is considered to be the strongest material in that price. Day to day life and growth of industry and infrastructure in any country totally de... Read More

Capacity :
5000 MT/Day
Plant and Machinery cost:
156.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
52.00%
Break Even Point (BEP):
21.00 %
TCI :
2396.00 Lakhs
Cost of Project :
2396.00Lakhs
Add To Inquiry Basket
Synthetic Floating In Fishing Industry
Synthetic Floating In Fishing Industry

Floating agent in the fishing industry has indirect relation. It has very good relation with fisheries. Fisherman has applied it lot for spreading ... Read More

Capacity :
400 Plots/Day
Plant and Machinery cost:
55.00 Lakhs
Working Capital :
166.00
Rate of Return (ROR):
40.87%
Break Even Point (BEP):
43.20 %
TCI :
281.30 Lakhs
Cost of Project :
281.30Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Recycling of Lithium Ion ... Copper 1.4 MT Per Day Aluminium 0.8 MT Per Day Graphite 1.8 MT Per Day Carbon Black 0.3 MT Per Day L 27.00 422.00
Set up Lithium Ion Batter... 0 0.00 0.00
Start Automated Vehicle S... Spare Parts:375 Units/Day •Waste Oil:450 Units/Day•Waste Tyre:2250 Units/Day•Engines:50 Units/Day•St 32.00 5100.00
Lithium Ion Battery Recyc... 0 0.00 0.00
Lithium Ion Battery LiFeP... Lithium Ion (LiFePO4) Battery Back of Power 4.8 KWH (No. of Cells 800) for Three Wheeler: 26 Nos/Day 29.00 970.00
Flat Glass Manufacturing ... 4000 Sq.Mtrs. per day 24.00 18700.00
Start Production Business... Rubber Granules 5 MT per Day By Product Steel Wire 0.5 MT per Day 28.00 20700000.00
Manufacturing of Aluminiu... Aluminium Alloy Ingots 12 MT per day Aluminium Scrap 0.20 MT per day 26.00 1100.00
Nicotine Sulphate from To... Nicotine Sulphate 3.6 MT per Day Waste Tobacco 28.3 MT per Day 28.00 141600000.00
Natural Tanning Powder P... 600 MT per Annum 28.00 27000000.00
You Should Read SYour Own... 0 0.00 0.00
Set Up Automated Vehicle ... 0 26.00 1455.00
Manufacturing Business Pl... Zinc Ingots (Purity 98%) 6 MT Per Day 29.00 863.00
Ferrochrome Manufacturing... Ferrochrome 135 MT Per Day 10.00 40400.00
Start a Business Of LPG C... LPG Cylinders (14.20 Kgs Size) 3,334.0 Nos. per day LPG Cylinders (19 Kgs Size) 3,334.0 Nos. per day 32.00 3475.00
Start Banana Wine Product... Banana Wine (750 ml size Bollte) 2,960 Bottles per day 25.00 1189.00
Activated Carbon From Ric... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Activated Carbon F... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Business of Flat G... 0 0.00 0.00
Set Up Business of Double... 0 0.00 0.00
A Business Plan for Bio-D... 10,000 MT Per Annum 28.00 8100.00
Sulphur Powder Manufactur... 20,000 MT Per Annum 24.00 4318.00
Manufacturing Business Gi... 60,000 Kg. Per Annum , 1,44,000 Kg. Per Annum 28.00 528.00
Start a Business of Manuf... 1,500 Dz. Per Annum 35.00 34.00
Start Activated Carbon fr... 0 0.00 0.00
Most Demandable Business ... 0 0.00 0.00
Cumin, Turmeric, Chilly &... 0 0.00 0.00
Start Production Of Wire ... Wire Nails: 48,000 MT Per Annum, Wire Scraps: 4,500 MT Per Annum 30.00 1736.00
Auto Brake Pad and Auto... Auto Brake Pads 3,600,000 Nos. Per Annum Auto Brake Shoes 720,000 Nos. Per Annum 27.00 1422.00
Business Plan for Product... Double Wall Vacuum Steel Bottles 600,000 Bottles Per Annum Single Wall Vacuum Steel Bottles 600,0 28.00 1619.00
12345678910...

Showing 541 - 600 of 601 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.