• 0

Project Consultancy, Reports & Profiles

India possesses one of the largest power generation capacities in the world (its current ranking is fifth) with an installed capacity of 156,000 MW which is about 4 percent of global power generation. The top four countries, viz., US, Japan, China and Russia together consume about 49 percent of the total power generated globally. The average per capita consumption of electricity in India is estimated to be 704kWh during 2008-09. The power sector has emerged as major focus area for the government both central and state. However, it suffers from power shortages estimated at 14-15 per cent, with the figure higher in the northern and western regions.  

India's generation capacity of 2,300 MW in 1950 expanded to over 116,500 MW including non-utilities at the end 2000-01. The total installed capacity of electric power generation further increased to 141,080 MW in 2007-08 (upto January 2008) compared to a capacity of 128,000 MW during the same period in 2006-07. The Eleventh Plan has targeted a capacity addition of 78,570 MW. The five years (2007-2012) may be the best of times for power equipment makers with the power sector on an expansion spree. With order-book growth expanding over the last three years, there is a good chance that this will continue. Close to 82% of the planned generation capacity for the Tenth Plan was either implemented or was in the process of being implemented. Even assuming a 70% implementation ratio for the Eleventh Plan, close to 55,000 MW will be added. Five ultra mega power projects, totaling 20,000 MW are coming up in 2008. In the transmission sector, for example, Power Grid Corporation is planning a capex of Rs 710 billion by 2010.

Earlier, the shortfalls in achieving the Plan targets of addition to power generation and up-gradation of transmission and distribution had adversely affected the electrical equipment industry. The peak shortage which was over 11% of the requirement in 2003-04 increased to 11.7% in 2004-05 and to over 12% in 2005-06. The shortage further rose to about 14% in 2006-07. In the ten months of 2007-08 the peak shortage had risen to over 15% of the peak demand of 107,010 MW.

The national grid envisage 200,000 MW transmission capacity and 37,700 MW of inter-regional power transfer capacity (current inter-regional power transfer capacity is 20,750 MW) to ensure smooth transfer of power from power –surplus to power-deficit regions.

According to the Power Ministry, the power sector has tied up Rs 2,240 billion worth of investments to build power plants with 70,000 MW capacities in the next three years. The Indian government has set ambitious goals in the 11th plan for power sector owing to which the power sector is poised for significant expansion. In order to provide availability of over 1000 units of per capita electricity by year 2012, it has been estimated that need-based capacity addition of more than 100,000 MW would be required. This has resulted in massive addition plans being proposed in the sub-sectors of Generation Transmission and Distribution. Investment is also expected to flow into different segments of the value chain, covering the segments of power generation, transmission and distribution and allied sectors such as equipment, technology and services. The private sector is expected to play a more active role in investment and capital productivity. The government has undertaken a number of initiatives to facilitate private sector participation.

With some fast moves at launching fast track projects to augment supplies, the Indian industry needs to improve its competitiveness. The Indian market is growing and multinationals with newer technologies are now more active.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Captive Thermal Power Plant for Glass Industry
Captive Thermal Power Plant for Glass Industry

A captive power plant also called auto producer or embedded generation is a power generation facility used and managed... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Bagasse based Cogeneration Power Plant
Bagasse based Cogeneration Power Plant

Energy demand is fast increasing with rapid industrialization and urbanization in India. In a developing economy like India, generally energy deman... Read More

Capacity :
10 MW
Plant and Machinery cost:
1423.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
49.00 %
TCI :
3214.00 Lakhs
Cost of Project :
3214.00Lakhs
Add To Inquiry Basket
INTEGRATED UNIT OF RICE MILL, RICE BRAN OIL EXTRACTION WITH CAPTIVE POWER PLANT
INTEGRATED UNIT OF RICE MILL, RICE BRAN OIL EXTRACTION WITH CAPTIVE POWER PLANT

The economics of rice milling industry is largely dependent on the useful commercial utilization of its by-products. T... Read More

Capacity :
0
Plant and Machinery cost:
4373.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
38.00%
Break Even Point (BEP):
40.00 %
TCI :
8016.00 Lakhs
Cost of Project :
8016.00Lakhs
Add To Inquiry Basket
SUGAR MILL, DISTILLERY AND POWER PLANT
SUGAR MILL, DISTILLERY AND POWER PLANT

India is now the largest producer of sugar in the world. Although subject to cyclical fluctuations, sugar production has grown phenomenally in t... Read More

Capacity :
Sugar Mill Cap. 5000 Crushing/Day,Distillery Cap. 60000 Ltrs/Day, Power Plant Cap. 28 MW
Plant and Machinery cost:
6800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
48.00%
Break Even Point (BEP):
31.00 %
TCI :
16200.00 Lakhs
Cost of Project :
16200.00Lakhs
Add To Inquiry Basket
Biogas Power Plant from Cow Dung
Biogas Power Plant from Cow Dung

Biogas plants have the ability to accept a wide variety of organic residues as primary fuel input. This includes Cow dung, agricultural residue, ef... Read More

Capacity :
1000 KWh or 1 MWh
Plant and Machinery cost:
485.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
22.00%
Break Even Point (BEP):
45.00 %
TCI :
1245.00 Lakhs
Cost of Project :
1245.00Lakhs
Add To Inquiry Basket
Solar Power Plant
Solar Power Plant

Solar thermal systems for generating electricity use tracking mirrors to reflect and concentrate sunlight on to a receiver, where, it is converted ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Opportunities in Manufacturing of Solar Inverter (100 KVA – 1000 KVA)
Opportunities in Manufacturing of Solar Inverter (100 KVA – 1000 KVA)

 

A solar inverter,... Read More

Capacity :
Solar Inverter 50 Hz 100 to 1000 KVA 15 NosPer Day
Plant and Machinery cost:
373.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
1288.00Lakhs
Add To Inquiry Basket
Power Transformer
Power Transformer

A transformer is a device that transfers electrical energy from one circuit to another through inductively coupled condu... Read More

Capacity :
Power Transformer (132/33 KV, 50 MVA Core Type Oil Cooled) : 50 Nos. /annum
Plant and Machinery cost:
224.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
42.00 %
TCI :
0.00 Lakhs
Cost of Project :
1043.00Lakhs
Add To Inquiry Basket
Electrical Power Transformers (Repair & Refurbishment)
Electrical Power Transformers (Repair & Refurbishment)

Electrical Power Transformers (Repair & Refurbishment) 

 

Read More

Capacity :
Repairs of 25 MVA Power Transformers : 60 Nos/Annum Repairs of 50 MVA Power Transformers: 36 Nos/Ann
Plant and Machinery cost:
33.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
200.00Lakhs
Add To Inquiry Basket
Biomass Power Generation Plant
Biomass Power Generation Plant

Biomass is biological material derived from living, or recently living organisms. In the context of biomass for energy this is often used to mean p... Read More

Capacity :
1 MW
Plant and Machinery cost:
373.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
50.00%
Break Even Point (BEP):
51.00 %
TCI :
543.00 Lakhs
Cost of Project :
543.00Lakhs
Add To Inquiry Basket
COAL BASED POWER PLANT (500 MW)
COAL BASED POWER PLANT (500 MW)

Power Generation is an essential requirement of economic growth of a country. A weak power infrastructure does not lead to the growth potential and... Read More

Capacity :
500 MW
Plant and Machinery cost:
143200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
56.00%
Break Even Point (BEP):
25.00 %
TCI :
158700.00 Lakhs
Cost of Project :
158700.00Lakhs
Add To Inquiry Basket
SOLAR PHOTOVOLTAICS-A VIABLE FUTURE ALTERNATIVE OF RENEWABLE ENERGY
SOLAR PHOTOVOLTAICS-A VIABLE FUTURE ALTERNATIVE OF RENEWABLE ENERGY

Solar energy is an enormous resource... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
THERMAL POWER PLANT (5 MW)
THERMAL POWER PLANT (5 MW)

Power generation is an essential requirement of economic growth of a country. Generation involves with the production of power and transmission and... Read More

Capacity :
5 MW
Plant and Machinery cost:
1753.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
52.00%
Break Even Point (BEP):
29.00 %
TCI :
2076.00 Lakhs
Cost of Project :
2076.00Lakhs
Add To Inquiry Basket
CAPTIVE POWER PLANT
CAPTIVE POWER PLANT

Robust power generation and an effective delivery model determine the bullish economic growth of a country. A weak power infrastructure impedes the... Read More

Capacity :
5 MW
Plant and Machinery cost:
1733.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.00%
Break Even Point (BEP):
34.00 %
TCI :
2097.00 Lakhs
Cost of Project :
2097.00Lakhs
Add To Inquiry Basket
GOOD OPPORTUNITY IN SOLAR POWER PLANT
GOOD OPPORTUNITY IN SOLAR POWER PLANT

In case of Photovoltaic or direct conversion of sunlight to electricity via solar cell, the efficiencies limited to about 20 percent of the absorbe... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
CO-GENERATION POWER PLANT BASED ON BAGASSE
CO-GENERATION POWER PLANT BASED ON BAGASSE

Co-generation plant based on Bagasse is the need of the hour in the perspective of the power generation required and its demand is increasing consi... Read More

Capacity :
15 MW
Plant and Machinery cost:
850.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
53.00%
Break Even Point (BEP):
46.00 %
TCI :
1746.00 Lakhs
Cost of Project :
1746.00Lakhs
Add To Inquiry Basket
Power Project For Glass Industry
Power Project For Glass Industry

Glass industry in India is one of the prime industry where much more power is utilizing for controlling the production of glass continuously. It is... Read More

Capacity :
110 MW/Day
Plant and Machinery cost:
453.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
56.00%
Break Even Point (BEP):
52.00 %
TCI :
494.00 Lakhs
Cost of Project :
494.00Lakhs
Add To Inquiry Basket
Steel Tubes from Scraps and PVC Pipe with 5mw Hr  Captive Power Plant
Steel Tubes from Scraps and PVC Pipe with 5mw Hr Captive Power Plant

Steel Tubes from Scraps and P.V.C. Pipe with 5mw/Hr. Captive Power Plant

Steel tu... Read More

Capacity :
280 MT/ Day Steel Tubes120 MT/ Day PVC Pipes 5MW/Hr. Captive Power Plant
Plant and Machinery cost:
2415.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.27%
Break Even Point (BEP):
63.16 %
TCI :
4316.00 Lakhs
Cost of Project :
4316.00Lakhs
Add To Inquiry Basket
Power Project For Glass Industry
Power Project For Glass Industry

Glass industry in India is one of the prime industry where much more power is utilizing for controlling the production of glass continuously. It is... Read More

Capacity :
100-110MW/Day
Plant and Machinery cost:
453.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
56.15%
Break Even Point (BEP):
52.21 %
TCI :
494.00 Lakhs
Cost of Project :
494.00Lakhs
Add To Inquiry Basket
Start Solar Inverter Production Business Demanding Industry of Renewable Energy in the World
Start Solar Inverter Production Business Demanding Industry of Renewable Energy in the World

Solar sine wave inverters, ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Solar Panel Manufacturing Business (both type of the PV Cells: Polycrystalline and Monocrystalline)
Solar Panel Manufacturing Business (both type of the PV Cells: Polycrystalline and Monocrystalline)

A Solar panel consists of a number of solar modules, which are connected in series an... Read More

Capacity :
Mono Crystalline Solar PV Module Capacity: 250 Watt 466.8 Nos. Per Day Mono Crystalline Solar PV Mod
Plant and Machinery cost:
3635.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
6346.00Lakhs
Add To Inquiry Basket
A Complete Business Plan of Solar Panel Including both type of the PV Cells Polycrystalline and Monocrystalline
A Complete Business Plan of Solar Panel Including both type of the PV Cells Polycrystalline and Monocrystalline

Introduction... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Hydro based Power Plant
Hydro based Power Plant

Hydropower is a renewable energy resource that utilizes Earth’s water cycle to generate electricity. The movement of water flow downstream in... Read More

Capacity :
10 MW
Plant and Machinery cost:
6100.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
15.00%
Break Even Point (BEP):
69.00 %
TCI :
0.00 Lakhs
Cost of Project :
8014.00Lakhs
Add To Inquiry Basket
Power Generation from Garbage
Power Generation from Garbage

Managing waste is the collection and ultimate disposal of the waste without causing environmental damage. Power generation from waste is one of uni... Read More

Capacity :
5 MW
Plant and Machinery cost:
1940.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
36.00%
Break Even Point (BEP):
40.00 %
TCI :
3231.00 Lakhs
Cost of Project :
3231.00Lakhs
Add To Inquiry Basket
GAS BASED POWER PLANT
GAS BASED POWER PLANT

Electricity is an essential requirement for all facets of our life. It has been recognized as a basic human need. It is a critical infrastructure o... Read More

Capacity :
1014 MWh
Plant and Machinery cost:
437000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
48.00%
Break Even Point (BEP):
24.00 %
TCI :
467200.00 Lakhs
Cost of Project :
467200.00Lakhs
Add To Inquiry Basket
GAS BASED POWER PLANT
GAS BASED POWER PLANT

When the gas turbine generator was introduced to the power generation industry in the late 1940s, it was a revolutionary self-contained fossil-fuel... Read More

Capacity :
25 MW
Plant and Machinery cost:
10000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
44.00%
Break Even Point (BEP):
20.00 %
TCI :
11000.00 Lakhs
Cost of Project :
11000.00Lakhs
Add To Inquiry Basket
Lead Acid Maintenance Free Battery
Lead Acid Maintenance Free Battery

-

Read More
Capacity :
834 Nos./day
Plant and Machinery cost:
66.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
52.00%
Break Even Point (BEP):
30.00 %
TCI :
1179.00 Lakhs
Cost of Project :
1179.00Lakhs
Add To Inquiry Basket
DAIRY FARMING WITH POWER PLANT BASED ON DUNG
DAIRY FARMING WITH POWER PLANT BASED ON DUNG

Read More

Capacity :
27000 Kgs. Milk / Day, 5 MW Power Plant Based on Cow Dung
Plant and Machinery cost:
400.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
32.00 %
TCI :
2500.00 Lakhs
Cost of Project :
2500.00Lakhs
Add To Inquiry Basket
Transmission Tower & Tele Communication Tower with Galvanizing Plant
Transmission Tower & Tele Communication Tower with Galvanizing Plant

The purpose of a transmission line tower is to support conductors carrying electrical power and one or two ground wires at suitable distances above... Read More

Capacity :
24,000 MT /Year
Plant and Machinery cost:
149.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
53.00 %
TCI :
716.00 Lakhs
Cost of Project :
716.00Lakhs
Add To Inquiry Basket
Transistor and Semiconductor
Transistor and Semiconductor

The transistor is a semiconductor device which transfers a weak signal from low resistance circuit to high resistance circuit. The words Trans mean... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Transistor and Semiconductor
Transistor and Semiconductor

The transistor is a semiconductor dev... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Solar Water Heater
Solar Water Heater

Solar water heater is a device that can be used to capture sunlight in order to heat the water in your pipes to be used for baths, showers, etc. So... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Power Transformer
Power Transformer

A transformer is a device that transfers electrical energy from one circuit to another through inductively ... Read More

Capacity :
Power Transformers (132/33 KV, 10000 KVA Core Type Oil Cooled) :100 Nos/
Plant and Machinery cost:
85.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
169.00Lakhs
Add To Inquiry Basket
Solar Power Plant
Solar Power Plant

Renewable energy in India comes under the purview of the Ministry of New and Renewable Energy. India was the first country in the world to set up a... Read More

Capacity :
Solar Power 10 MW: 60,000 KWH/ Day
Plant and Machinery cost:
5512.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
5.68%
Break Even Point (BEP):
53.14 %
TCI :
8447.00 Lakhs
Cost of Project :
8447.00Lakhs
Add To Inquiry Basket
GOOD FUTURE PROSPECTS FOR SOLAR THERMAL POWER PLANT
GOOD FUTURE PROSPECTS FOR SOLAR THERMAL POWER PLANT

The growing industrialization and associated use of energy have led the world to face energy crisis which is gaining serious concern day by day. In... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
SOLAR PHOTOVOLTAIC POWER PLANT
SOLAR PHOTOVOLTAIC POWER PLANT

The growing industrialization and as... Read More

Capacity :
1 MW
Plant and Machinery cost:
1435.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
11.00%
Break Even Point (BEP):
93.00 %
TCI :
1871.00 Lakhs
Cost of Project :
1871.00Lakhs
Add To Inquiry Basket
BIOMASS GASIFICATION POWER PLANT
BIOMASS GASIFICATION POWER PLANT

Bio-gas power plant is one of the sources of non-conventional energy. The biomass fuels are solid carbonaceous materials derived from living plants... Read More

Capacity :
1000 KWh or 1 MW.
Plant and Machinery cost:
475.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
12.00%
Break Even Point (BEP):
66.00 %
TCI :
691.00 Lakhs
Cost of Project :
691.00Lakhs
Add To Inquiry Basket
Sponge Iron Including Power Plant
Sponge Iron Including Power Plant

Sponge iron is the iron manufactured by refining iron ore. Iron ore is refined by burning off its wastes to a considerable extent. It is used as a ... Read More

Capacity :
450.00 MT/Day
Plant and Machinery cost:
5600.00 Lakhs
Working Capital :
1100.00
Rate of Return (ROR):
37.49%
Break Even Point (BEP):
49.41 %
TCI :
8300.00 Lakhs
Cost of Project :
8300.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Captive Thermal Power Pla... 0 0.00 0.00
Bagasse based Cogeneratio... 10 MW 0.00 3214.00
INTEGRATED UNIT OF RICE M... 0 38.00 8016.00
SUGAR MILL, DISTILLERY AN... Sugar Mill Cap. 5000 Crushing/Day,Distillery Cap. 60000 Ltrs/Day, Power Plant Cap. 28 MW 48.00 16200.00
Biogas Power Plant from C... 1000 KWh or 1 MWh 22.00 1245.00
Solar Power Plant 0 0.00 0.00
Opportunities in Manufact... Solar Inverter 50 Hz 100 to 1000 KVA 15 NosPer Day 26.00 1288.00
Power Transformer Power Transformer (132/33 KV, 50 MVA Core Type Oil Cooled) : 50 Nos. /annum 29.00 1043.00
Electrical Power Transfor... Repairs of 25 MVA Power Transformers : 60 Nos/Annum Repairs of 50 MVA Power Transformers: 36 Nos/Ann 26.00 200.00
Biomass Power Generation ... 1 MW 50.00 543.00
COAL BASED POWER PLANT (5... 500 MW 56.00 158700.00
SOLAR PHOTOVOLTAICS-A VIA... 0 0.00 0.00
THERMAL POWER PLANT (5 MW... 5 MW 52.00 2076.00
CAPTIVE POWER PLANT 5 MW 33.00 2097.00
GOOD OPPORTUNITY IN SOLAR... 0 0.00 0.00
CO-GENERATION POWER PLANT... 15 MW 53.00 1746.00
Power Project For Glass I... 110 MW/Day 56.00 494.00
Steel Tubes from Scraps a... 280 MT/ Day Steel Tubes120 MT/ Day PVC Pipes 5MW/Hr. Captive Power Plant 41.27 4316.00
Power Project For Glass I... 100-110MW/Day 56.15 494.00
Start Solar Inverter Prod... 0 0.00 0.00
Solar Panel Manufacturing... Mono Crystalline Solar PV Module Capacity: 250 Watt 466.8 Nos. Per Day Mono Crystalline Solar PV Mod 30.00 6346.00
A Complete Business Plan ... 0 0.00 0.00
Hydro based Power Plant 10 MW 15.00 8014.00
Power Generation from Gar... 5 MW 36.00 3231.00
GAS BASED POWER PLANT 1014 MWh 48.00 467200.00
GAS BASED POWER PLANT 25 MW 44.00 11000.00
Lead Acid Maintenance Fre... 834 Nos./day 52.00 1179.00
DAIRY FARMING WITH POWER ... 27000 Kgs. Milk / Day, 5 MW Power Plant Based on Cow Dung 43.00 2500.00
Transmission Tower & Tele... 24,000 MT /Year 46.00 716.00
Transistor and Semiconduc... 0 0.00 0.00
12

Showing 38 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.