Agro and Food Processing: Project Opportunities in Uttarakhand

PROFILE:

Food processing involves any type of value addition to agricultural or horticultural produce and also includes processes such as grading, sorting and packaging which enhance shelf life of food products. The food processing industry provides vital linkages and synergies between industry and agriculture. The Food Processing Industry sector in India is one of the largest in terms of production, consumption, export and growth prospects. The government has accorded it a high priority, with a number of fiscal reliefs and incentives, to encourage commercialization and value addition to agricultural produce, for minimizing pre/post harvest wastage, generating employment and export growth. India's food processing sector covers a wide range of products fruit and vegetables; meat and poultry; milk and milk products, alcoholic beverages, fisheries, plantation, grain processing and other consumer product groups like confectionery, chocolates and cocoa products, Soya-based products, mineral water, high protein foods etc.

RESOURCES:

Uttarakhand comprises of total are 5672568 Hectares, of which forest area is 3485847 hectares. Fruits such as apples, oranges, pear, grapes peach, plum apricot, litchi, mangoes and guava are widely grown in the state and therefore have immense potential for development of horticultural crops and processing units. The State Government will assist in establishing small & medium size Agro Parks, Food Parks etc., which will provide common infrastructure facilities for storage, processing, grading and marketing, thus ensuring that surplus fruits and vegetables do not go waste as at present. Four Agri Export Zones have already been declared under the AEZ scheme of the Government of India for Litchi, Horticulture, Herbs, Medicinal Plants and Basmati Rice. Further, efforts will continue to promote production for export and provide access to domestic and export markets for products from the State.

GOVERNMENT POLICIES:

The Ministry of Food Processing Industries (MOFPI) is a ministry of the Government of India is responsible for formulation and administration of the rules and regulations and laws relating to food processing in India. The ministry was set up in the year 1988, with a view to develop a strong and vibrant food processing industry, to create increased employment in rural sector and enable farmers to reap the benefits of modern technology and to create a of surplus for exports and stimulating demand for processed food.

•        Custom duty rates have been substantially reduced on food processing plant and equipments, as well as on raw materials and intermediates, especially for export production.

•        Wide-ranging fiscal policy changes have been introduced progressively in food processing sector. Excise and Import duty rates have been reduced substantially. Many processed food items are totally exempt from excise duty.

•        Corporate taxes have been reduced and there is a shift towards market related interest rates. There are tax incentives for new manufacturing units for certain years, except for industries like beer, wine, aerated water using flavouring concentrates, confectionery, chocolates etc.

•        Indian currency, rupee, is now fully convertible on current account and convertibility on capital account with unified exchange rate mechanism is foreseen in coming years.

•        Repatriation of profits is freely permitted in many industries except for some, where there is an additional requirement of balancing the dividend payments through export earnings.

 

Biotechnology: Project Opportunities in Uttarakhand

PROFILE

The Biotechnology sector in India is one of the fastest growing sectors of the Indian Economy. As the sector is mainly based on knowledge, it is expected that it will play an important part in shaping the Indian Economy, which is developing at a rapid pace. The Indian Biotechnology sector holds immense potential in terms of research and development, skill and cost effectiveness. As per the eight annual survey by the Association of Biotechnology-led enterprise (ABLE) and a monthly journal, Bio-Spectrum, the sector grew threefold in five years and reported a revenue of US$ 3 billion during 2009-2011 with a 17 per cent rise as compared to the previous year.

RESOURCES

Uttarakhand is an ideal destination to invest in biotechnology-based industries because of several inherent advantages and being host to vast diversity of flora and fauna and rare species of plants and animals. A high-level biotechnology board is being setup to pursue initiatives in the field of research. The state will accord the units coming under this sector with the industry status and aims to establish an internationally competitive business infrastructure and environment for the industry in the state. Further, a biotechnology park is to be developed that will integrate resources and provide a focused institutional set up for accelerated commercial growth of bio-technology and bio-informatics. The Government is also in the process of creating an Exchange for Medicinal and Aromatic Plants to serve as a common platform for research institutions, technology developers and producers.

GOVERNMENT POLICIES:

The Uttarakhand Board of Biotechnology (UBB) will help the R&D Institutions of the State to seek funds from the national and international funding agencies / donors to upgrade the infrastructure facilities. Depending upon the need, UBB and the State Government will also try to fund R&D facilities through its own resources. The State Government undertakes to provide the following facilities/terms to the companies desirous of establishing BT units in the State:

•        BT Units including related R&D Units will enjoy the status of industry and will be eligible for incentives and concessions as provided for the relevant category/class of industry in the Industrial Policy of the State. For this purpose they shall be treated as Priority Sector Industry. Department of Biotechnology will provide The State Government undertakes to provide the following facilities/terms to the companies “single-window clearance” and shall issue only one application form to set up BT Units in the State.

•        The Government proposes to establish in association with private sector a BT Park initially at Halide, Pantnagar where land/plots would be made available to prospective entrepreneurs on favourable terms. The latter, however, are also free to choose their own sites or locate the same in the other established Industrial Areas in the State.

Hydropower: Project Opportunities in Uttarakhand

PROFILES:

Hydroelectricity is the term referring to electricity generated by hydropower; the production of electrical power through the use of the gravitational force of falling or flowing water. India was the 7th largest producer of hydroelectric power in 2008 after Norway: 114 TWh and 3.5 % the world total in 2008. The potential for hydroelectric power in India is one of the greatest in the world. Small hydropower offers a wide range of benefits-especially for rural areas and developing countries. The resource is environmentally responsible and has substantial economic advantages. Efforts also being made to improve the exchange of ideas and technology related to small hydropower. In India, small hydropower up to capacity of 25 MW also includes the mini-and-micro hydropower projects which are usually confined strictly to local use. A potential of over 15,000 MW has been identified from small hydropower and Government of India has been according top priority to SHP development as thrust area.

RESOURCES:

Uttarakhand has a large network of rivers and canals which provides an immense scope for hydro-power energy. In India, the development of Micro, Mini, and Small Hydro Power Projects started in the year 1897. One of the first hydro-power stations in India was commissioned at Galogi in 1907. More power stations were subsequently developed over a period of time. In Uttarakhand, the estimated capacity of Small hydro power projects is about 1500 MW out of total estimated capacity of 20,363 MW Uttaranchal has a hydropower potential of the order of 20236 MW against which only about 1407 MW has been harnessed so far.

GOVERNMENT POLICIES:

The Government of Uttaranchal (GoU) has decided to encourage generation of power through small hydropower sources of energy, and has framed a policy so that the development of this sector serves as an engine to achieve the objective of promoting the all-round development of the region. To encourage generation of hydropower the government of Uttarakhand has formulated and implemented policies with following objectives:

•        Creation of conducive conditions for encouraging private sector participation

•        Harnessing water resources in an environment friendly manner

•        Meeting the energy demand of the state/country

•        Promotion of the overall development of the region

•        Generation of revenue from hydro resources

 

Mineral: Project Opportunities in Uttarakhand

PROFILES:

A mineral is a naturally occurring solid chemical substance formed through biogeochemical processes, having characteristic chemical composition, highly ordered atomic structure, and specific physical properties. India is endowed with significant mineral resources. India produces 89 minerals out of which 4 are fuel minerals, 11 metallic, 52 non-metallic and 22 minor minerals.

RESOURCES:

Mineral resources of Uttarakhand play a significant role in the economy of Uttarakhand. The Chamoli district of Uttarakhand is especially famous for housing a number of mineral resources in Uttarakhand. The northern division of the district consist entirely of medium to high grade metamorphic rocks, which also contains bands of volcanic rocks in some areas; the southern division contains sedimentary and low-grade metamorphic rocks, with bands of volcanic rocks in some regions. Although much is not known about the geology of the first division of Chamoli, yet the mineral resources contain rocks such as quartzite, marble, and various types of schist and gneiss. The southern division contains rocks such as gneiss, limestone, phyllites, quartzite, sericite-biotite schist and slate.

Some of the important minerals that form a major part of the mineral resources of Uttarakhand are: Asbestos, Magnestic, Soapstone or Steatite, Copper, Iron, Graphite, Gold, Gypsum, Lead, Slate, Limestone, Building Stone, Sulfur, and Bitumen. Beside these major mineral resources, some of the other mineral resources of Uttarakhand also play a major role in enhancing the economy of Uttarakhand. Some of those mineral resources are: Antimony, Arsenic, Lignite or Brown Marble, Mica, Silver, etc.

GOVERNMENT POLICIES:

NATIONAL MINERAL POLICY, 2008

Keeping in view the long term national goals and perspective for exploitation of minerals, Government of India has revised its earlier National Mineral Policy, 1993 and came up with a new National Mineral Policy 2008. Basic goals of NMP 2008 are-

1.       Regional and detailed exploration using state of the art techniques in time bound manner.

2.       Zero waste mining

For achieving the above goals, important changes envisaged are:

•        Creation of improved regulatory environment to make it more conducive to investment and technology flows

•        Transparency in allocation of concessions

•        Preference for value addition

•        Development of proper inventory of resources and reserves

•        Enforcement of mining plans for adoption of proper mining methods and   optimum utilization of minerals 

•        Data filing requirements will be rigorously monitored

•        Old disused mining sites will be used for plantation or for other useful purposes.

•        Mining infrastructure will be upgraded through PPP initiatives

•        State PSU involved in mining sector will be modernized

•        State Directorate will be strengthened to enable it to regulate   mining in a proper way and to check illegal mining

•        There will be arms length distance between State agencies that mine  and those that regulate

•        Productivity and economics of mining operation, safety and health of workers and others will be encouraged.

Tourism: Project Opportunities in Uttarakhand

PROFILE:

Tourism in India is the largest service industry, with a contribution of 6.23% to the national GDP and 8.78% of the total employment in India. The tourism industry in India is substantial and vibrant, and the country is fast becoming a major global destination. India’s travel and tourism industry is one of them most profitable industries in the country, and also credited with contributing a substantial amount of foreign exchange. Indian Tourism offers a potpourri of different cultures, traditions, festivals, and places of interest.

RESOURCES:

Uttarakhand - the land of gods, the home of Himalayas and truly a paradise on earth, allures everyone from everywhere. Uttarakhand is paradise for different types of adventure activities. Like River Rafting, Trekking, Skiing, Camping, Rock Climbing, Rappelling, River Crossing. Mountaineering, Paragliding and Hot Ballooning make Uttarakhand one of the most attractive destinations for adventure sports not only in the India but the world. Gangotri and Yamunotri, the sources of both the Ganges and Yamuna fall in the upper reaches of the state and together with Badrinath (dedicated to Vishnu) and Kedarnath (dedicated to Shiva) form the Char Dham, one of Hinduism's most spiritual and auspicious pilgrimage circuits. Haridwar, meaning "Gateway to God" is a prime Hindu destination. Haridwar hosts the Kumbha Mela every twelve years, in which millions of pilgrims take part from all parts of the India and the world. Rishikesh near Haridwar is known as the preeminent yoga centre of India. The state has an abundance of temples and shrines, many dedicated to local deities or manifestations of Shiva and Durga, references to many of which can be found in Hindu scriptures and legends.

GOVERNMENT POLICIES:

In order to develop tourism in India in a systematic manner, position it as a major engine of economic growth and to harness its direct and multiplier effects for employment and poverty eradication in an environmentally sustainable manner, the National Tourism Policy was formulated in the year 2002. Broadly, the Policy attempts to:-

•        Position tourism as a major engine of economic growth;

•        Harness the direct and multiplier effects of tourism for employment generation, economic development and providing impetus to rural tourism;

•        Focus on domestic tourism as a major driver of tourism growth.

•        Position India as a global brand to take advantage of the burgeoning global travel trade and the vast untapped potential of India as a destination;

•        Acknowledges the critical role of private sector with government working as a pro-active facilitator and catalyst;

•        Create and develop integrated tourism circuits based on India’s unique civilization, heritage, and culture in partnership with States, private sector and other agencies; and ensure that the tourist to India gets physically invigorated, mentally rejuvenated, culturally enriched, spiritually elevated and feel India from within.

 

Waste management and recycling: Project Opportunities in Uttarakhand

PROFILE:

Rapid industrialization last few decades have led to the depletion of pollution of precious natural resources in India depletes and pollutes resources continuously. Further the rapid industrial developments have, also, led to the generation of huge quantities of hazardous wastes, which have further aggravated the environmental problems in the country by depleting and polluting natural resources. Therefore, rational and sustainable utilization of natural resources and its protection from toxic releases is vital for sustainable socio-economic development.

Hazardous waste management is a new concept for most of the Asian countries including India. The lack of technical and financial resources and the regulatory control for the management of hazardous wastes in the past had led to the unscientific disposal of hazardous wastes in India, which posed serious risks to human, animal and plant life.

RESOURCES:

Investments are aimed at improving public health and the environmental quality in the Program towns and the adjacent open land and water bodies by increasing solid waste collection coverage from 50% to 72% and supporting sound solid waste disposal methods. Improvements will be directed at (i) segregation of solid waste at household level and handling and management improvements at wards and town levels with an emphasis on waste minimization, (ii) provision of solid waste collection and transportation equipment, and (iii) construction of sanitary landfills in accordance with GoI’s Municipal Solid Waste Management and Handling Rules 2000. These will develop into a State wide SWM strategy, action plan, and town wise SWM master plan reports supported by capacity building of ULBs in SWM.

GOVERNMENT POLICIES:

National policy on waste management is set out in the October 1998 policy statement on waste management- Changing our ways. It outlines the Government's policy objectives in relation to waste management, and suggests some key issues and considerations that must be addressed to achieve these objectives. The policy is firmly grounded in an internationally recognised hierarchy of options, namely prevention, minimisation, reuse/recycling, and the environmentally sustainable disposal of waste which cannot be prevented or recovered.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
Profit Making Manufacturing Business of Alloy Wheels for 2 Wheeler Motorcycle, Bikes Best Business in Automobile Sector
Profit Making Manufacturing Business of Alloy Wheels for 2 Wheeler Motorcycle, Bikes Best Business in Automobile Sector

 

Allo... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start Lucrative Manufacturing Business of Milk Powder (Baby Milk for 0 to 5 year, Milk Powder for Coffee and Tea)
Start Lucrative Manufacturing Business of Milk Powder (Baby Milk for 0 to 5 year, Milk Powder for Coffee and Tea)

Milk... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Production Business of Eco Friendly Bamboo Toothbrush Most Profitable Business Ideas in Bamboo Industry
Production Business of Eco Friendly Bamboo Toothbrush Most Profitable Business Ideas in Bamboo Industry

Bamboo toothbrushes Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Profitable Business Industry of  Electric Motors
Profitable Business Industry of Electric Motors

 

An e... Read More

Capacity : 5 KW Three Phase Induction Motors120 Nos Per Day 10 KW Three Phase Induction Motors 20 Nos Per Day 1
Plant and Machinery cost: 467.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):41.00 %
TCI :0.00 Lakhs
Cost of Project : 3949.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Carbonated Health Drinks
Investment Opportunities in Carbonated Health Drinks

 

Carb... Read More

Capacity : Carbonated Health Drinks Size 250 ml 8,000 Packs Per Day Carbonated Health Drinks Size 330 ml 4,000
Plant and Machinery cost: 49.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):59.00 %
TCI :0.00 Lakhs
Cost of Project : 299.00Lakhs
Add To Inquiry Basket
Business Industry of  Stone Plastic Composite (SPC) Flooring Tiles
Business Industry of Stone Plastic Composite (SPC) Flooring Tiles

 

Stone plastic com... Read More

Capacity : Stone Plastic Composite (SPC) Flooring Tiles 3,000 Sq,mtr Per Day
Plant and Machinery cost: 408.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):65.00 %
TCI :0.00 Lakhs
Cost of Project : 1011.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Waste Lubricating Oil  Recycling Plant
Investment Opportunities in Waste Lubricating Oil Recycling Plant

 

Waste oil is made... Read More

Capacity : Used Lubricating Oil 20,000 Ltrs per day Spent Clay as by product 2,105 Ltrs per day
Plant and Machinery cost: 127.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 753.00Lakhs
Add To Inquiry Basket
Automated Vehicle Scrapping  and Recycling Unit
Automated Vehicle Scrapping and Recycling Unit

 

The disassembly o... Read More

Capacity : 1000 Vehicles per Month
Plant and Machinery cost: 497.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):40.00 %
TCI :0.00 Lakhs
Cost of Project : 2090.00Lakhs
Add To Inquiry Basket
Azodicarbonamide Using Urea and Hydrazine Hydrate
Azodicarbonamide Using Urea and Hydrazine Hydrate

 

The chemical comp... Read More

Capacity : Azodicarbonamide Powder 40 MT Per Day Ammonia 10.6 MT Per Day Hydrochloric Acid (38% Conc.) 20.1 MT
Plant and Machinery cost: 1951.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 3109.00Lakhs
Add To Inquiry Basket
Rising Demand of  Rice Husk based Biodegradable Cutlery
Rising Demand of Rice Husk based Biodegradable Cutlery

 

People have been ... Read More

Capacity : Biodegradable Cutlery (Per Set 6 Pcs. Flatware) 1,852 Sets per day
Plant and Machinery cost: 29.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):67.00 %
TCI :0.00 Lakhs
Cost of Project : 135.00Lakhs
Add To Inquiry Basket
Profitable Business of Magnesium Sulphate
Profitable Business of Magnesium Sulphate

Magnesium sulphate is an inorganic salt with the formula MgSO4 Read More

Capacity : 72 MT Per Day
Plant and Machinery cost: 256.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 900.00Lakhs
Add To Inquiry Basket
Business Industry of Grain Processing (Grading, Cleaning & Packaging of Rice & Pulses)
Business Industry of Grain Processing (Grading, Cleaning & Packaging of Rice & Pulses)

Grain processing, as exempli... Read More

Capacity : Moong Dal 1 MT Per Day Masur Dal 1 MT Per Day Toor Dal 1.5 MT Per Day Chana Dal 1 MT Per Day Kabul
Plant and Machinery cost: 63.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 165.00Lakhs
Add To Inquiry Basket
Setting up a Multispeciality Hospital (200 Bedded)
Setting up a Multispeciality Hospital (200 Bedded)

A hospital is a health care institution providing patient treatment with specialized m... Read More

Capacity : 200 Bedded Hospital
Plant and Machinery cost: 14000.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 21248.00Lakhs
Add To Inquiry Basket
Start Manufacturing of Aluminium Ingots from Aluminium Scrap
Start Manufacturing of Aluminium Ingots from Aluminium Scrap

Aluminum, is a light weight,... Read More

Capacity : Aluminium Alloy Ingots14 MT per day Aluminium Scrap 0.23 MT per day
Plant and Machinery cost: 700.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 3315.00Lakhs
Add To Inquiry Basket
Calcium Sennosides from Senna Leaves Production Business Plan
Calcium Sennosides from Senna Leaves Production Business Plan

Calcium Sennoside are the m... Read More

Capacity : 400 Kgs per Day
Plant and Machinery cost: 291.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):59.00 %
TCI :0.00 Lakhs
Cost of Project : 607.00Lakhs
Add To Inquiry Basket
PSA Oxygen Plant
PSA Oxygen Plant

 

PSA p... Read More

Capacity : 30 to 36 cylinders per day
Plant and Machinery cost: 45.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
PSA Oxygen Gas Plant
PSA Oxygen Gas Plant

PSA plants take... Read More

Capacity : 180 to 200 cylinders per day
Plant and Machinery cost: 99.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Production Business of Razor Blade for Safety Razor and Disposable Safety Razor
Production Business of Razor Blade for Safety Razor and Disposable Safety Razor

 

The double-edged ... Read More

Capacity : Disposable Safety Razors: 864,000 Units per Day Razor Blade: 172,800 Units per Day Steel Scrap: 500
Plant and Machinery cost: 467.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.51%
Break Even Point (BEP):43.43 %
TCI :0.00 Lakhs
Cost of Project : 2285.00Lakhs
Add To Inquiry Basket
Investing into Business of Ductile Iron Pipe FittingsInvesting into Business of Ductile Iron Pipe Fittings
Investing into Business of Ductile Iron Pipe FittingsInvesting into Business of Ductile Iron Pipe Fittings

 

Casting Read More

Capacity : 12 MT per Day
Plant and Machinery cost: 311.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):33.83%
Break Even Point (BEP):55.20 %
TCI :0.00 Lakhs
Cost of Project : 1135.00Lakhs
Add To Inquiry Basket
Business of Disposable Safety Razors
Business of Disposable Safety Razors

 

The double-edged ... Read More

Capacity : Razor Blade for Safety Razors Pack of 5 pcs each: 57,600 Units per Day Steel Scrap: 500 Units per Da
Plant and Machinery cost: 393.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):57.75%
Break Even Point (BEP):28.02 %
TCI :0.00 Lakhs
Cost of Project : 815.00Lakhs
Add To Inquiry Basket
Emerging Business of Ductile Iron Pipe Fittings Highly Demandable Industry of DI Pipe Fittings
Emerging Business of Ductile Iron Pipe Fittings Highly Demandable Industry of DI Pipe Fittings

Pipe fittings, also known a... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Extraction of Essential Oil from Lemon Grass
Extraction of Essential Oil from Lemon Grass

Oil of lemongrass is one of the most important essential Oils. Large quantities are used for the extraction of citr... Read More

Capacity : Lemon Grass Oil (10 ml Size Pack) 1,334 Ltrs per Day
Plant and Machinery cost: 43.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.60%
Break Even Point (BEP):69.69 %
TCI :0.00 Lakhs
Cost of Project : 607.00Lakhs
Add To Inquiry Basket
Production of Bicarbonate Cartridge Acid Concentrate Hot Disinfectant Cold Disinfectant
Production of Bicarbonate Cartridge Acid Concentrate Hot Disinfectant Cold Disinfectant

 

Bicarbonate Cartri... Read More

Capacity : Bicarbonate Cartridge 720g 166.7 Nos. per day Bicarbonate Cartridge 650g 500.0 Nos. per day Acid Co
Plant and Machinery cost: 53.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):25.28%
Break Even Point (BEP):35.25 %
TCI :0.00 Lakhs
Cost of Project : 1153.00Lakhs
Add To Inquiry Basket
Profitable Industry of Surgical Methylated Spirit Denatured Alcohol Surgical Spirit
Profitable Industry of Surgical Methylated Spirit Denatured Alcohol Surgical Spirit

 

Methylated spirits... Read More

Capacity : Surgical Methylated Spirit 1 Ltr Size Bottle 4,000.0 Nos. Per Day Surgical Methylated Spirit 5 Ltr S
Plant and Machinery cost: 79.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.53%
Break Even Point (BEP):54.72 %
TCI :0.00 Lakhs
Cost of Project : 265.00Lakhs
Add To Inquiry Basket
Manufacturing of Rubber Powder from Waste Tyres
Manufacturing of Rubber Powder from Waste Tyres

 

Rubber is polymer ... Read More

Capacity : Rubber Powder 5.0 MT per day By Product Steel Wire 1.4 MT per day
Plant and Machinery cost: 46.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.98%
Break Even Point (BEP):61.44 %
TCI :0.00 Lakhs
Cost of Project : 191.00Lakhs
Add To Inquiry Basket
Start extraction of Cashew Nut Shell Oil and Cardanol
Start extraction of Cashew Nut Shell Oil and Cardanol

 

Cashew (Botanical ... Read More

Capacity : Cashew Nut Shell Oil 11.0 MT per day Cardanol 5.5 MT per day De-Oiled Cashew Nut Shell Cake (bye Pro
Plant and Machinery cost: 323.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.72%
Break Even Point (BEP):52.53 %
TCI :0.00 Lakhs
Cost of Project : 752.00Lakhs
Add To Inquiry Basket
Setup a Manufacturing Plant of  Disposable Plastic Syringes with Needles
Setup a Manufacturing Plant of Disposable Plastic Syringes with Needles

 

Disposable Syringes are made of plas... Read More

Capacity : Disposable Plastic Syringes with Needles 1 ml Size each Packed in Polypack: 50,000.0 Nos. per day D
Plant and Machinery cost: 524.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.78%
Break Even Point (BEP):35.60 %
TCI :0.00 Lakhs
Cost of Project : 345.00Lakhs
Add To Inquiry Basket
Profitable Business of Disposable Safety Razors Investment Opportunities in Men Grooming Products Industry
Profitable Business of Disposable Safety Razors Investment Opportunities in Men Grooming Products Industry

 

Disposable safety razors have a design that is very s... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Investment Opportunities in Production of Dual Feed Distillery Ethanol as Bio Fuel Set up an Ethanol Production Plant
Investment Opportunities in Production of Dual Feed Distillery Ethanol as Bio Fuel Set up an Ethanol Production Plant

Ethanol is a colourless, pu... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Magnesium Stearate
Magnesium Stearate

 

Magnesium stearat... Read More

Capacity : Magnesium Stearate 10.0 MT Per Day
Plant and Machinery cost: 301.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):28.00 %
TCI :0.00 Lakhs
Cost of Project : 515.00Lakhs
Add To Inquiry Basket
Production of Bromelain Enzyme from Pineapple Stems Money Making Business Idea
Production of Bromelain Enzyme from Pineapple Stems Money Making Business Idea

Bromelain is a combination ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Manufacturing of Gum Arabic (Gum Acacia)
Manufacturing of Gum Arabic (Gum Acacia)

Gum Arabic, also referred to as gum acacia, may be a natural gum harvested from the o... Read More

Capacity : Arabic Gum (Talha): 6.73 MT / Day
Plant and Machinery cost: 296.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):58.00 %
TCI :0.00 Lakhs
Cost of Project : 535.00Lakhs
Add To Inquiry Basket
Poly-lactic Acid (PLA) - Polylactic Acid Manufacturing
Poly-lactic Acid (PLA) - Polylactic Acid Manufacturing

 

Poly-lactic acid (... Read More

Capacity : Polylactic Acid (PLA): 100 Ton / Day
Plant and Machinery cost: 23945.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):26.00%
Break Even Point (BEP):32.00 %
TCI :0.00 Lakhs
Cost of Project : 30838.00Lakhs
Add To Inquiry Basket
Eco-Friendly Bamboo Based Products Manufacturing- Tissue Paper, Paper Bags & Plates
Eco-Friendly Bamboo Based Products Manufacturing- Tissue Paper, Paper Bags & Plates

 

Eco-Friendly Bamboo Ba... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Business Ideas in Production of Disposable IV Set
Business Ideas in Production of Disposable IV Set

 

Business Ideas in Production of Disposable I... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Production of Phenolic Formaldehyde Resin
Production of Phenolic Formaldehyde Resin

 

Phenol formaldehyde resins (PF) or Phenolic resins are artificial polymers o... Read More

Capacity : 1,000 kg/day
Plant and Machinery cost: 34.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):24.00%
Break Even Point (BEP):66.00 %
TCI :0.00 Lakhs
Cost of Project : 144.00Lakhs
Add To Inquiry Basket
Production of Woven PP Cement Sacks
Production of Woven PP Cement Sacks

 

Woven polypropylene bags are ideal for transporting and packing bulk goods. Weaved polypropylene bags are th... Read More

Capacity : PP Woven Sacks (for Cement Bag 50 Kgs Size):258000 Nos/ day PP Woven Jumboo Sacks (for Cement Bag 15
Plant and Machinery cost: 566.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):14.00%
Break Even Point (BEP):48.00 %
TCI :0.00 Lakhs
Cost of Project : 891.00Lakhs
Add To Inquiry Basket
Vitamin ‘C’ Manufacturing from Sorbitol
Vitamin ‘C’ Manufacturing from Sorbitol

 

Vitamin C is the simplest of the vitamins chemically, and as a result, it was one of the first to be extract... Read More

Capacity : 600 kg/day
Plant and Machinery cost: 371.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):24.00%
Break Even Point (BEP):50.00 %
TCI :0.00 Lakhs
Cost of Project : 717.00Lakhs
Add To Inquiry Basket
Start A Single Wall Steel Water Bottle Manufacturing Business
Start A Single Wall Steel Water Bottle Manufacturing Business

 

Water bottles come in a variety of shapes, colours, and sizes. A cord is attached to the stainless steel con... Read More

Capacity : 2,000 Nos/ day
Plant and Machinery cost: 138.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):64.00 %
TCI :0.00 Lakhs
Cost of Project : 439.00Lakhs
Add To Inquiry Basket
Invest in Linear Alkyl Benzene Sulphonic Acid (LABSA) manufacturing business
Invest in Linear Alkyl Benzene Sulphonic Acid (LABSA) manufacturing business

 

Introduction Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Weaving of Fiberglass Fabric for Composites (Using e Class Imported Yarns)
Weaving of Fiberglass Fabric for Composites (Using e Class Imported Yarns)

 

Introducti... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Business opportunities in Maize Processing Unit (Starch, Glucose, Germs, Fibres, Gluten & Steep Water)
Business opportunities in Maize Processing Unit (Starch, Glucose, Germs, Fibres, Gluten & Steep Water)

A wide variety of agro-climatic conditions Maize is known a... Read More

Capacity : Maize Starch: 30 MT per day Liquid Glucose: 30 MT per day Gluten: 4.50 MT per day Germs: 6 MT per d
Plant and Machinery cost: 3206.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):21.00%
Break Even Point (BEP):49.00 %
TCI :0.00 Lakhs
Cost of Project : 4496.00Lakhs
Add To Inquiry Basket
Emerging business opportunities in Production of Adhesive (Fevicol Type)
Emerging business opportunities in Production of Adhesive (Fevicol Type)

Cement, mucilage, glue, and paste are all terms that are fr... Read More

Capacity : 1.0 MT per Day
Plant and Machinery cost: 47.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):27.00%
Break Even Point (BEP):62.00 %
TCI :0.00 Lakhs
Cost of Project : 165.00Lakhs
Add To Inquiry Basket
Business Ideas and Investment Opportunities in Micronutrients Fertilizer Manufacturing Business
Business Ideas and Investment Opportunities in Micronutrients Fertilizer Manufacturing Business

 

Introducti... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Most Profitable Manufacturing Business of Phenolic Formaldehyde Resin PF Investment Opportunities in Resin Manufacturing Industry
Most Profitable Manufacturing Business of Phenolic Formaldehyde Resin PF Investment Opportunities in Resin Manufacturing Industry

 

Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Best Manufacturing Business Ideas of Wine Production from Pineapple and Ginger
Best Manufacturing Business Ideas of Wine Production from Pineapple and Ginger

Introduction:

Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Dal Mill, Split Pulses, Roasted Gram Split, Dal & Chana Manufacturing Plant A Profitable Business Idea to Start
Dal Mill, Split Pulses, Roasted Gram Split, Dal & Chana Manufacturing Plant A Profitable Business Idea to Start

 

Introducti... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start a Production Unit of Ply Board from Poplar & Eucalyptus Wooden Logs Emerging Opportunities in Wood Industry
Start a Production Unit of Ply Board from Poplar & Eucalyptus Wooden Logs Emerging Opportunities in Wood Industry

Introduction

Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
How to Manufacture the English Willow Cricket Bats Business Plan and Investment Opportunity for Startups
How to Manufacture the English Willow Cricket Bats Business Plan and Investment Opportunity for Startups

Introduction... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Best Profitable Manufacturing and Processing Ideas of Poly Tetra Fluoro Ethylene PTFE Business
Best Profitable Manufacturing and Processing Ideas of Poly Tetra Fluoro Ethylene PTFE Business

 

Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
How to set up a Chocolate Confectionery Plant (Milk Chocolate, Dark Chocolate, White Chocolate, Orange and Tangy Flavour Toffee, Citric Flavoured Candies & Chocolate Wafers)
How to set up a Chocolate Confectionery Plant (Milk Chocolate, Dark Chocolate, White Chocolate, Orange and Tangy Flavour Toffee, Citric Flavoured Candies & Chocolate Wafers)

 

Chocolate is a co... Read More

Capacity : Milk Chocolate:1,600 Kgs Per Day Dark Chocolate:1,600 Kgs Per Day White Chocolate:1,600 Kgs Per Day
Plant and Machinery cost: 249.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):54.00 %
TCI :0.00 Lakhs
Cost of Project : 671.00Lakhs
Add To Inquiry Basket
Set up a Unit of Carbon Black Manufacturing Business
Set up a Unit of Carbon Black Manufacturing Business

 

Under regulated c... Read More

Capacity : 167 MT per day
Plant and Machinery cost: 2563.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):49.00%
Break Even Point (BEP):25.00 %
TCI :0.00 Lakhs
Cost of Project : 8249.00Lakhs
Add To Inquiry Basket
Profitable Business Idea for Set up a Production Plant of Packaged Drinking Water with PET Bottles
Profitable Business Idea for Set up a Production Plant of Packaged Drinking Water with PET Bottles

 

Introduct... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Start a Production Unit of Solar Photovoltaic (PV) Cell Solar Power in India is a Fast Developing Industry
Start a Production Unit of Solar Photovoltaic (PV) Cell Solar Power in India is a Fast Developing Industry

Introduction:... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Business Opportunities in Chemical Industry Manufacturing Business Startup of Silica Gel Crystal and Beads
Business Opportunities in Chemical Industry Manufacturing Business Startup of Silica Gel Crystal and Beads

Introduction:... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Set up an Manufacturing Unit of Chocolate and Confectionery Plant (Milk Chocolate, Dark Chocolate, White Chocolate, Orange & Tangy Flavour Toffee, Citric Flavoured Candies & Chocolate Wafers)
Set up an Manufacturing Unit of Chocolate and Confectionery Plant (Milk Chocolate, Dark Chocolate, White Chocolate, Orange & Tangy Flavour Toffee, Citric Flavoured Candies & Chocolate Wafers)

Chocolate is a general term... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
How to Manufacture Carbon Black A Profitable Business Idea You Can Start
How to Manufacture Carbon Black A Profitable Business Idea You Can Start

Carbon black is made up of ... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
30 Bedded Hospital Business Plan
30 Bedded Hospital Business Plan

A hospital is supposed to treat patients suffering from various ailments. Doctors with their dedicated spirit serve the nation at large by providin... Read More

Capacity : Special Ward Patients : 2 Patients / Day General Ward Patients: 16 Patients / Day Double Bedded Pati
Plant and Machinery cost: 347.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):20.00%
Break Even Point (BEP):55.00 %
TCI :0.00 Lakhs
Cost of Project : 604.00Lakhs
Add To Inquiry Basket
Construction Opportunities in Geotextiles for Roadways
Construction Opportunities in Geotextiles for Roadways

Geotextiles were used in roadway construction to stabilize roadways and their edges. These early geotextiles were made from natural fibres, fabrics... Read More

Capacity : Geotextiles for Road & Construction: 2,934 Kgs / Day
Plant and Machinery cost: 326.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):28.00%
Break Even Point (BEP):57.00 %
TCI :0.00 Lakhs
Cost of Project : 665.00Lakhs
Add To Inquiry Basket
Disposable Nitrile Examination Gloves - Medical Grade, Powder Free, Disposable, Non Sterile, Food Safe, Textured
Disposable Nitrile Examination Gloves - Medical Grade, Powder Free, Disposable, Non Sterile, Food Safe, Textured

Nitrile gloves are a kind of disposable gloves made up of rubber, this suggests there's no risk of latex allergies. Th... Read More

Capacity : Disposable Nitrile Gloves (Powder Free): 500,000 Pcs. / Day
Plant and Machinery cost: 1321.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):30.00%
Break Even Point (BEP):45.00 %
TCI :0.00 Lakhs
Cost of Project : 2890.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
Setup Plant Of Lab Cultu... Lab Cultured Diamonds (1 Carat) 30 Carat Per Day 25.00 361.00
Start Lemon Processing Un... Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs 25.00 314.00
Solar PV (Photovoltaic) G... Solar PV (Photovoltaic) Glass 90,000 MT Per Annum 28.00 4200.00
A Business Plan For Pea P... Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day 27.00 614.00
Setup Plant Of Acrylate... Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum 30.00 2291.00
Start Latex Rubber Thread... Latex Rubber Thread 200 Kg. Per Day 26.00 412.00
Start Cosmetic Unit (Seru... - 36.00 1617.00
Pioneering Pea Protein Bu... 0 0.00 0.00
Start Production Of Silic... - 28.00 4716.00
A Business Plan for IV Fl... IV Fluids (500 ml Size Pack) 78,000 Packs Per Day 27.00 1263.00
Start Industry of Liquor ... Wine (750 ml Size) 4,000,000 Bottles per annum Whiskey (375 ml Size) 4,000,000 Bottles per annum B 28.00 1880.00
Setup Pharmaceutical Unit... - 37.00 35774.00
Start Industry with Serum... 0 0.00 0.00
Setup Unit Of Cement Plan... Cement Plant 40,000 Bags per Day 26.00 25200.00
A Business Plan for Steri... Sterial Water for Injection 500 ml Size Pack 20,000 Sachets Per Day 30.00 1234.00
Setup Plant Of Lead From ... Lead Ingot 30 MT Per Day 28.00 2231.00
A Business Plan Blood Col... - 28.00 2294.00
A Business Plan for Parac... Paracetamol Powder 7 MT Per Day 27.00 779.00
Start Manufacturing Busin... Baby Diapers (4 Pcs.) 84,000 Pkts Per Day Adult Diapers (4 Pcs.) 18,000 Pkts Per Day Sanitary 29.00 4201.00
Start Tissue Paper Manufa... Tissue Paper 20 MT Per Day 27.00 2101.00
Launching a Solar Panel ... Solar Panel 500 MW per annum 32.00 5353.00
Biodegradable Disposable ... - 27.00 2774.00
Setup Curcumin Extraction... Curcumin Powder 100 Kgs per day Turmeric Oil 47 Kgs per day Deoiled Turmeric 1,853 Kgs 28.00 491.00
Setup Active Pharmaceutic... Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs 33.00 5246.00
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
12345678910...

Showing 121 - 180 of 2694 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR