Reach Us
Niir Project Consultancy Services (NPCS)
AN ISO 9001 : 2015 CERTIFIED COMPANY
106-E, Kamla Nagar,Opposite Spark Mall,
New Delhi-110007, India.
Email: npcs.ei@gmail.com,
info@entrepreneurindia.co
Tel: 91-11-23843955, 23845654, 23845886, +91-8800733955
Mobile: +91-9811043595
Fax: 91-11-23845886
Web: www.entrepreneurindia.co
  • Join Us On
Reach Us
Quick Enquiry
 
   
   
 
Quick Enquiry
 
 

We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
Admixtures for Concrete
Admixtures for Concrete

Admixtures are materials added to the concrete before or during its mixing, with a view to modifying one or more of the properties of concrete in t... Read More

Capacity : 2000 Kgs/Day
Plant and Machinery cost: 8.00 Lakhs
Working Capital : 134.00
Rate of Return (ROR):52.00%
Break Even Point (BEP):41.00 %
TCI :160.00 Lakhs
Cost of Project : 160.00Lakhs
Add To Inquiry Basket
Bricks From Fly Ash
Bricks From Fly Ash

Bricks may be made from a no. of different kinds of materials but they must usually posses a certain amount of plasticity. Fly ash is one of them. ... Read More

Capacity : 250 Lacs Nos/Annum
Plant and Machinery cost: 27.00 Lakhs
Working Capital : 62.00
Rate of Return (ROR):27.16%
Break Even Point (BEP):65.69 %
TCI :158.00 Lakhs
Cost of Project : 158.00Lakhs
Add To Inquiry Basket
Asphaltic Roofing Sheet
Asphaltic Roofing Sheet

Shelter is a basic need of the human specis. It is one of the basic rights which any human being may claim. Housing remains one of the crucial prob... Read More

Capacity : 3000 Sq.mt/Day
Plant and Machinery cost: 59.00 Lakhs
Working Capital : 31.00
Rate of Return (ROR):45.16%
Break Even Point (BEP):47.64 %
TCI :167.00 Lakhs
Cost of Project : 167.00Lakhs
Add To Inquiry Basket
Banana Wafers
Banana Wafers

Banana can be preserved for 3 months or more by reducing the moisture in it by drying or frying. In India, food is preserved by sun-drying, mostly ... Read More

Capacity : 100 Kgs/Day
Plant and Machinery cost: 3.00 Lakhs
Working Capital : 10.00
Rate of Return (ROR):44.53%
Break Even Point (BEP):47.77 %
TCI :18.00 Lakhs
Cost of Project : 18.00Lakhs
Add To Inquiry Basket
Ice Cream of Different Flavours
Ice Cream of Different Flavours

Ice cream is defined as a frozen dairy product made by suitable blending and processing of cream and other milk products together with sugar, flavo... Read More

Capacity : 1000 Kgs/Day
Plant and Machinery cost: 13.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):58.78%
Break Even Point (BEP):31.65 %
TCI :98.00 Lakhs
Cost of Project : 98.00Lakhs
Add To Inquiry Basket
Dairy Farm for Milk Production
Dairy Farm for Milk Production

Agriculture still continues to be th... Read More

Capacity : 1300 Litres/Day
Plant and Machinery cost: 3.00 Lakhs
Working Capital : 8.00
Rate of Return (ROR):33.48%
Break Even Point (BEP):51.24 %
TCI :37.00 Lakhs
Cost of Project : 37.00Lakhs
Add To Inquiry Basket
Chocolates
Chocolates

Chocolates is the favourite item of children. Chocolates and Cocoa products supply proteins, fats, Carbohydrates, Vitamins and Minerals. It?s prima... Read More

Capacity : 15000 Kgs/Annum
Plant and Machinery cost: 4.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):47.68%
Break Even Point (BEP):44.00 %
TCI :45.00 Lakhs
Cost of Project : 45.00Lakhs
Add To Inquiry Basket
Cheese Analogues
Cheese Analogues

Cheese is basically milk product, which is manufactured from milk by acidulation and then by filtration. The precipitate is cheese, there are few s... Read More

Capacity : 1000 Kgs/Day
Plant and Machinery cost: 36.00 Lakhs
Working Capital : 4.00
Rate of Return (ROR):24.60%
Break Even Point (BEP):57.92 %
TCI :126.00 Lakhs
Cost of Project : 126.00Lakhs
Add To Inquiry Basket
Ice Cream & Ice Candy
Ice Cream & Ice Candy

Ice-cream, though of a comparatively recent origin, is a popular food item among people. It is a frozen dairy product made by suitable blending and... Read More

Capacity : 1200 Kgs./ Day
Plant and Machinery cost: 19.00 Lakhs
Working Capital : 78.00
Rate of Return (ROR):41.62%
Break Even Point (BEP):45.95 %
TCI :127.00 Lakhs
Cost of Project : 127.00Lakhs
Add To Inquiry Basket
PRE-COMPRESSED PRESSBOARD
PRE-COMPRESSED PRESSBOARD

Pre compressed press board is special type board. It has specialty use in the floor of special electrical instrument like transformer. Specificatio... Read More

Capacity : 300000 Sq. Mt./Annum
Plant and Machinery cost: 61.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):38.00%
Break Even Point (BEP):53.00 %
TCI :157.00 Lakhs
Cost of Project : 157.00Lakhs
Add To Inquiry Basket
Welding Electrode
Welding Electrode

Welding Electrodes are used in welding various metals in the fabrication of equipment for chemical and allied industries, construction of steel str... Read More

Capacity : 1.20 MT/Day
Plant and Machinery cost: 14.00 Lakhs
Working Capital : 21.00
Rate of Return (ROR):30.53%
Break Even Point (BEP):56.33 %
TCI :52.00 Lakhs
Cost of Project : 52.00Lakhs
Add To Inquiry Basket
Carbide Tips Inserts & Indexiable
Carbide Tips Inserts & Indexiable

Tungsten carbide is a compound of tungsten and carbon. Tungsten as such or tungsten ore is not available in India sufficiently. So it can be import... Read More

Capacity : 1000 Nos./Day
Plant and Machinery cost: 24.00 Lakhs
Working Capital : 24.00
Rate of Return (ROR):39.03%
Break Even Point (BEP):50.93 %
TCI :87.00 Lakhs
Cost of Project : 87.00Lakhs
Add To Inquiry Basket
Welding Electrode
Welding Electrode

Welding Electrodes are used in welding various metals in the fabrication of equipment for chemical and allied industries, construction of steel str... Read More

Capacity : 1200 MT/Annum (Welding Rods)
Plant and Machinery cost: 21.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):49.00%
Break Even Point (BEP):40.00 %
TCI :165.00 Lakhs
Cost of Project : 165.00Lakhs
Add To Inquiry Basket
Aluminium Containers
Aluminium Containers

Cargo containers, an item which is essential for transporting of essential commodities form one country to the other country. Now a days export and... Read More

Capacity : 96 Containers/Annum
Plant and Machinery cost: 47.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):61.33%
Break Even Point (BEP):32.23 %
TCI :164.00 Lakhs
Cost of Project : 164.00Lakhs
Add To Inquiry Basket
LPG Valves
LPG Valves

LPG valves are made from brass by forging. The total production of valves has been established 9 million numbers per annum in the country. Against ... Read More

Capacity : 1500 Nos/Day
Plant and Machinery cost: 54.00 Lakhs
Working Capital : 31.00
Rate of Return (ROR):24.67%
Break Even Point (BEP):61.77 %
TCI :129.00 Lakhs
Cost of Project : 129.00Lakhs
Add To Inquiry Basket
Engine Coolant
Engine Coolant

The consumption of coolant is mainly estimated on the basis of automobile industry which has experienced a technological revolution in car manufact... Read More

Capacity : 200 liters/Day
Plant and Machinery cost: 6.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :16.00 Lakhs
Cost of Project : 16.00Lakhs
Add To Inquiry Basket
Automotive Carburetors
Automotive Carburetors

Carburetors is a device that controls the power output and fuel feed of internal combustion spark-ignition engines generally used for automobiles, ... Read More

Capacity : 100 Nos./Day
Plant and Machinery cost: 29.00 Lakhs
Working Capital : 17.00
Rate of Return (ROR):45.38%
Break Even Point (BEP):38.12 %
TCI :70.00 Lakhs
Cost of Project : 70.00Lakhs
Add To Inquiry Basket
Automobile Workshop
Automobile Workshop

Automobile workshop provide services of preventive maintenance of motor vehicles as well as for repairs and overhauls, Preventive maintenance cuts ... Read More

Capacity : 10500 Nos./Annum
Plant and Machinery cost: 12.00 Lakhs
Working Capital : 15.00
Rate of Return (ROR):39.55%
Break Even Point (BEP):48.38 %
TCI :106.00 Lakhs
Cost of Project : 106.00Lakhs
Add To Inquiry Basket
Activated Alumina
Activated Alumina

Activated alumina is one of the various grades O alumina used extensively as industrial adsorbent because of their properties of large surface area... Read More

Capacity : 3.0 Ton/Day
Plant and Machinery cost: 13.00 Lakhs
Working Capital : 54.00
Rate of Return (ROR):80.01%
Break Even Point (BEP):29.88 %
TCI :88.00 Lakhs
Cost of Project : 88.00Lakhs
Add To Inquiry Basket
Candle Making Unit
Candle Making Unit

Since long people used to burn cotton in mud cups filled with oil. But candle manufacture started during World War-II. The candle is being used in ... Read More

Capacity : 500 Kgs/Day
Plant and Machinery cost: 9.00 Lakhs
Working Capital : 24.00
Rate of Return (ROR):58.35%
Break Even Point (BEP):37.41 %
TCI :42.00 Lakhs
Cost of Project : 42.00Lakhs
Add To Inquiry Basket
Tube Making for Umbrella
Tube Making for Umbrella

There required large amount of hot rolled or cold rolled coils and strips for manufacturing of steel tubes. One of the major use of this tube is fo... Read More

Capacity : 400 Kgs /Day
Plant and Machinery cost: 7.00 Lakhs
Working Capital : 15.00
Rate of Return (ROR):45.54%
Break Even Point (BEP):47.81 %
TCI :41.00 Lakhs
Cost of Project : 41.00Lakhs
Add To Inquiry Basket
Piston for Internal  Combustion Engines
Piston for Internal Combustion Engines
Piston is one of the most important item in the automobile industries. There are mostly disc like structure of the piston. Now a days piston are make ... Read More
Capacity : 450 Nos. Two-Wheeler Piston
Plant and Machinery cost: 24.00 Lakhs
Working Capital : 61.00
Rate of Return (ROR):45.00%
Break Even Point (BEP):72.00 %
TCI :200.00 Lakhs
Cost of Project : 200.00Lakhs
Add To Inquiry Basket
Enameled Copper Wire
Enameled Copper Wire

Enameled wire is an insulated wire used in winding of armatures in transformers, switch gears and other electrical equipments. When connected to th... Read More

Capacity : 500 Kgs/Day
Plant and Machinery cost: 22.00 Lakhs
Working Capital : 52.00
Rate of Return (ROR):37.43%
Break Even Point (BEP):46.95 %
TCI :114.00 Lakhs
Cost of Project : 114.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

Disposable syringes are a great innov... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Thermoforming Plant for Manufacturing of Disposable Glass
Thermoforming Plant for Manufacturing of Disposable Glass

Thermoforming Plant for Manufacturing of Disposable Glass, Bowls & Plates Use P.S.Cost film, thermoforming film and sheet are manufactured cont... Read More

Capacity : 32000 Nos/Day
Plant and Machinery cost: 53.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):12.40%
Break Even Point (BEP):74.13 %
TCI :116.00 Lakhs
Cost of Project : 116.00Lakhs
Add To Inquiry Basket
Wooden Furniture
Wooden Furniture

The furniture making is an ancient art in India before centuries. The expertise of India in manufacturing furniture was accepted by all the parts o... Read More

Capacity : 20 Pcs/Day
Plant and Machinery cost: 4.00 Lakhs
Working Capital : 5.00
Rate of Return (ROR):111.00%
Break Even Point (BEP):26.99 %
TCI :13.00 Lakhs
Cost of Project : 13.00Lakhs
Add To Inquiry Basket
Hard Board from Bagasse
Hard Board from Bagasse

Soft and hard board, which are the basic among the paper boards, is used for wide range of purposes like folding boxes, backboard, for flat files, ... Read More

Capacity : 5 Ton/Day
Plant and Machinery cost: 25.00 Lakhs
Working Capital : 27.00
Rate of Return (ROR):70.88%
Break Even Point (BEP):35.11 %
TCI :143.00 Lakhs
Cost of Project : 143.00Lakhs
Add To Inquiry Basket
Wooden Furniture (With Mediocre Automation)
Wooden Furniture (With Mediocre Automation)

The term wooden furniture is used for articles of daily use in dwelling house, place of business, public buildings, and includes items such as chai... Read More

Capacity : 20 Articles/Day
Plant and Machinery cost: 13.00 Lakhs
Working Capital : 28.00
Rate of Return (ROR):42.81%
Break Even Point (BEP):48.28 %
TCI :73.00 Lakhs
Cost of Project : 73.00Lakhs
Add To Inquiry Basket
Broom Stick  Processing Plant
Broom Stick Processing Plant

Broom stick is well known to all. It has been largely used by domestic people, commercial complexes, industrial people etc. It is generally prepa... Read More

Capacity : 10,000 Nos./Day
Plant and Machinery cost: 21.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.01%
Break Even Point (BEP):66.65 %
TCI :56.00 Lakhs
Cost of Project : 56.00Lakhs
Add To Inquiry Basket
Glass Reinforced Concrete
Glass Reinforced Concrete

Glass reinforced concrete is a composite material consisting of a mortar of hydraulic cement and fine aggregate reinforced with alkali resistant gl... Read More

Capacity : 6000 MT GRC Mix/Annum
Plant and Machinery cost: 14.00 Lakhs
Working Capital : 34.00
Rate of Return (ROR):39.00%
Break Even Point (BEP):44.00 %
TCI :81.00 Lakhs
Cost of Project : 81.00Lakhs
Add To Inquiry Basket
Hydraulic Hoses for Heavy Earth Movers
Hydraulic Hoses for Heavy Earth Movers

Hydraulic hoses are largely used in the supplying of water from one place to another place, in the agriculture in the fire brigade, in the civil co... Read More

Capacity : 150000 Meter/ Annum
Plant and Machinery cost: 19.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):37.92%
Break Even Point (BEP):55.32 %
TCI :54.00 Lakhs
Cost of Project : 54.00Lakhs
Add To Inquiry Basket
Seamless M S Tubes & Pipes
Seamless M S Tubes & Pipes

Seamless M. S. Tubes & Pipes

Seamless M. S. pipes and tubes products may be mad... Read More

Capacity : 800 Kg/Day
Plant and Machinery cost: 8.00 Lakhs
Working Capital : 24.00
Rate of Return (ROR):21.00%
Break Even Point (BEP):50.00 %
TCI :56.00 Lakhs
Cost of Project : 56.00Lakhs
Add To Inquiry Basket
Brake Lining
Brake Lining
Read More
Capacity : 1000 No./DAY
Plant and Machinery cost: 5.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):53.00%
Break Even Point (BEP):49.00 %
TCI :40.00 Lakhs
Cost of Project : 40.00Lakhs
Add To Inquiry Basket
Clutch plate for four wheelers
Clutch plate for four wheelers
Read More
Capacity : 600 No./DAY
Plant and Machinery cost: 12.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):49.00%
Break Even Point (BEP):42.00 %
TCI :56.00 Lakhs
Cost of Project : 56.00Lakhs
Add To Inquiry Basket
Artificial Marble Tiles
Artificial Marble Tiles

With the vast potential of plastics, artificial synthetic marble is virtually replacing the use of natural marble. The qualities of artificial synt... Read More

Capacity : 3 MT/Day
Plant and Machinery cost: 17.00 Lakhs
Working Capital : 48.00
Rate of Return (ROR):53.21%
Break Even Point (BEP):44.05 %
TCI :107.00 Lakhs
Cost of Project : 107.00Lakhs
Add To Inquiry Basket
Water Proofing Liquid And Powder (Concrete And Mortar Admixture)
Water Proofing Liquid And Powder (Concrete And Mortar Admixture)

The invention of air entraining agents in 1939 has been termed a revolutionary development in concrete technology. The basic function of an air-ent... Read More

Capacity : 2 MT/Day
Plant and Machinery cost: 19.00 Lakhs
Working Capital : 62.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):64.00 %
TCI :123.00 Lakhs
Cost of Project : 123.00Lakhs
Add To Inquiry Basket
PLY BOARD FROM BAMBOO
PLY BOARD FROM BAMBOO

Ply Board is wooden made board or wooden like raw materials largely used for making ply board. There is large use of ply board nowadays in making w... Read More

Capacity : 0
Plant and Machinery cost: 42.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.00%
Break Even Point (BEP):63.00 %
TCI :114.00 Lakhs
Cost of Project : 114.00Lakhs
Add To Inquiry Basket
Oxygen and Nitrogen Gas Plant
Oxygen and Nitrogen Gas Plant

Oxygen (CO2, gas at 00/1 matm., 1.429g./l, crit. Pressure, 49.7 Matm.) is a colorless, odourless, and tasteless gas, somewhat heavier than air. It ... Read More

Capacity : 1440 Cubie Meter/Day
Plant and Machinery cost: 50.00 Lakhs
Working Capital : 18.00
Rate of Return (ROR):18.19%
Break Even Point (BEP):75.00 %
TCI :101.00 Lakhs
Cost of Project : 101.00Lakhs
Add To Inquiry Basket
Tyre Retreading And Repairing Facility For Heavy Vehicles
Tyre Retreading And Repairing Facility For Heavy Vehicles

Automobile tyres are quite costly in India, and are manufactured only by big manufacturers. Retreading is replacement of worn, cut or loose treads ... Read More

Capacity : 100 Tyres Retreads/Day & 2Nos. Heavy Vehicles Repairing/Day
Plant and Machinery cost: 25.00 Lakhs
Working Capital : 18.00
Rate of Return (ROR):89.00%
Break Even Point (BEP):28.00 %
TCI :71.00 Lakhs
Cost of Project : 71.00Lakhs
Add To Inquiry Basket
Bricks From Fly Ash
Bricks From Fly Ash

Bricks may be made from a number of different kinds of materials, but they must usually possess (can be capable of developing) a certain amount of ... Read More

Capacity : 83333 Nos./Day
Plant and Machinery cost: 30.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):40.80%
Break Even Point (BEP):53.00 %
TCI :192.00 Lakhs
Cost of Project : 192.00Lakhs
Add To Inquiry Basket
Prestressed Concrete Poles for Electrical HT and LT
Prestressed Concrete Poles for Electrical HT and LT

Prestressed Concrete Poles for Electrical H.T. and L.T.

Prestressed Concrete poles ... Read More

Capacity : 30,000 Nos/Annum
Plant and Machinery cost: 71.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):42.00%
Break Even Point (BEP):56.00 %
TCI :209.00 Lakhs
Cost of Project : 209.00Lakhs
Add To Inquiry Basket
Sand lime Bricks Manufacturing
Sand lime Bricks Manufacturing

In the construction industry in India, while efforts are being made to introduce new technologies to expedite the work process and streamline it, t... Read More

Capacity : 60000 Nos./Day
Plant and Machinery cost: 51.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):53.00%
Break Even Point (BEP):38.00 %
TCI :182.00 Lakhs
Cost of Project : 182.00Lakhs
Add To Inquiry Basket
Razor Blade
Razor Blade

The safety razor is providing with guards on both sides of the cutting edges, which restrain the age from digging into the skin. Development in raz... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Disposable Plastic Cups, Plates and Glasses
Disposable Plastic Cups, Plates and Glasses

The plastic in India plays a very important key role in industrialization. A wide spectrum of plastics and its articles have touched the life of ev... Read More

Capacity : 50,000 Plastics Glass, 25,000 Plastics Cups
Plant and Machinery cost: 25.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):39.00%
Break Even Point (BEP):51.00 %
TCI :69.00 Lakhs
Cost of Project : 69.00Lakhs
Add To Inquiry Basket
Hand Pump (Mark II)
Hand Pump (Mark II)

Hand pumps are the most economical means of providing water supply in rural and out laying urban area. The conventional hand pumps are being used i... Read More

Capacity : 10 Nos./Day
Plant and Machinery cost: 17.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):51.00%
Break Even Point (BEP):35.00 %
TCI :116.00 Lakhs
Cost of Project : 116.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes and Needles Manufacturing
Disposable Plastic Syringes and Needles Manufacturing

With the development of pharmaceutica... Read More

Capacity : 0
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Rubber Gaskets
Rubber Gaskets

There is competitive growth of rubber gaskets in market. Gasket should be smooth, inert -towards water and normal chemicals, physically strong and ... Read More

Capacity : 200.00 KGS/day
Plant and Machinery cost: 18.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):57.00%
Break Even Point (BEP):42.00 %
TCI :60.00 Lakhs
Cost of Project : 60.00Lakhs
Add To Inquiry Basket
Paper Bags For White Cement
Paper Bags For White Cement

Paper bags are very economical, efficient and safe package for an impressive and constantly growing range of products. It can protect the cement ve... Read More

Capacity : 3.00 TONNES/day
Plant and Machinery cost: 53.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):31.00%
Break Even Point (BEP):54.00 %
TCI :118.00 Lakhs
Cost of Project : 118.00Lakhs
Add To Inquiry Basket
Crushed Stone
Crushed Stone

Crushing of stone is physical process applied over the available natural stone to reduce size. Crushed stone should be hard enough to withstand hea... Read More

Capacity : 150.00 Tonnes/day
Plant and Machinery cost: 80.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):61.00%
Break Even Point (BEP):45.00 %
TCI :190.00 Lakhs
Cost of Project : 190.00Lakhs
Add To Inquiry Basket
Admixtures for Concrete
Admixtures for Concrete

Admixtures are materials added to the concrete before or during its mixing, with a view to modify one or more of the properties of concrete in the ... Read More

Capacity : 500 kg. Air Entraining Admix, 500 kg. Accelerating Admixture, 500 kg. Retarding Admixture, 500 kg. W
Plant and Machinery cost: 10.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):51.00%
Break Even Point (BEP):31.00 %
TCI :162.00 Lakhs
Cost of Project : 162.00Lakhs
Add To Inquiry Basket
Bitumen
Bitumen

It is non crystalline solid or viscous material having adhesive properties, which is completely soluble in carbon disulfide. It is generally brown ... Read More

Capacity : 20 Tonne/day
Plant and Machinery cost: 14.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.00%
Break Even Point (BEP):49.00 %
TCI :71.00 Lakhs
Cost of Project : 71.00Lakhs
Add To Inquiry Basket
Banana Powder
Banana Powder

Banana powder is prepared from pulp of fruits after mashing and drying in a drum or spray driers. Then dried product is pulverized and passed throu... Read More

Capacity : 1000.00 KG./day
Plant and Machinery cost: 21.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):45.00 %
TCI :117.00 Lakhs
Cost of Project : 117.00Lakhs
Add To Inquiry Basket
Wire Nail & Wire Drawing Plant
Wire Nail & Wire Drawing Plant

Wire nail is a common product, which is normally used in daily life. It is manufactured from low carbon and high carbon, hard or soft drawn steel w... Read More

Capacity : 1.00 MT/day
Plant and Machinery cost: 5.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):45.00%
Break Even Point (BEP):40.00 %
TCI :47.00 Lakhs
Cost of Project : 47.00Lakhs
Add To Inquiry Basket
WIRE MESH (HEXAGONAL SQUARE)
WIRE MESH (HEXAGONAL SQUARE)

Wire mesh is known as wire netting, which is supplied in various types of meshes and for various purposes. It is used by the builders i.e. fencing ... Read More

Capacity : 10 MT/Day
Plant and Machinery cost: 23.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):53.00%
Break Even Point (BEP):34.00 %
TCI :181.00 Lakhs
Cost of Project : 181.00Lakhs
Add To Inquiry Basket
CLAY AND SAND BRICKS PLANT (LIGHT WEIGHT)
CLAY AND SAND BRICKS PLANT (LIGHT WEIGHT)

Perforated bricks are light in weight and provide better thermal insulation as compared to common bricks. Now in India there is a very good growth ... Read More

Capacity : 60 Lakhs Bricks /Annum
Plant and Machinery cost: 27.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.00%
Break Even Point (BEP):39.00 %
TCI :135.00 Lakhs
Cost of Project : 135.00Lakhs
Add To Inquiry Basket
FUEL BRICKS FROM GROUND NUTS, SOYABEAN HULLS AND JUTE
FUEL BRICKS FROM GROUND NUTS, SOYABEAN HULLS AND JUTE

Fuel bricks from the different raw materials now a days are very popular for the resources of renewable energy. There is great efforts have been ta... Read More

Capacity : 3600 MT/Annum
Plant and Machinery cost: 3.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):40.00%
Break Even Point (BEP):53.00 %
TCI :52.00 Lakhs
Cost of Project : 52.00Lakhs
Add To Inquiry Basket
COPPER POWDER BY ELECTROLYTIC PROCESS
COPPER POWDER BY ELECTROLYTIC PROCESS

The principal methods for producing copper powder is electrolytic deposition at high current densities and the atomization of molten metal. Copper ... Read More

Capacity : 150 MT/Day
Plant and Machinery cost: 45.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):39.00%
Break Even Point (BEP):63.00 %
TCI :158.00 Lakhs
Cost of Project : 158.00Lakhs
Add To Inquiry Basket
Metalised Colour PVC and Metalised Rainbow PVC Sequence and Sparklers
Metalised Colour PVC and Metalised Rainbow PVC Sequence and Sparklers
Read More
Capacity : P.V.C Colour Sequence and Spark 30000 kgs/Annum, Rainbow Colour Sequence and Spark 30000 Kgs /Annum
Plant and Machinery cost: 31.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):29.00%
Break Even Point (BEP):50.00 %
TCI :109.00 Lakhs
Cost of Project : 109.00Lakhs
Add To Inquiry Basket
API Tube
API Tube

Piping may represent as much as 25% of the cost of a chemical process plant. The economics depends heavily on the pipe size and fabrication techniq... Read More

Capacity : 300000 Nos./Day
Plant and Machinery cost: 54.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):57.00 %
TCI :195.00 Lakhs
Cost of Project : 195.00Lakhs
Add To Inquiry Basket
Asbestos Cement Corrugated Sheet
Asbestos Cement Corrugated Sheet

The asbestos sheet was first manufactured in 1914 in Japan. Since then improvement have been repeatedly made in the quality, shape and manufacturin... Read More

Capacity : 1000 NOS./day
Plant and Machinery cost: 81.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):38.00%
Break Even Point (BEP):43.00 %
TCI :291.00 Lakhs
Cost of Project : 291.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Admixtures for Concrete 2000 Kgs/Day 52.00 160.00
Bricks From Fly Ash 250 Lacs Nos/Annum 27.16 158.00
Asphaltic Roofing Sheet 3000 Sq.mt/Day 45.16 167.00
Banana Wafers 100 Kgs/Day 44.53 18.00
Ice Cream of Different Fl... 1000 Kgs/Day 58.78 98.00
Dairy Farm for Milk Produ... 1300 Litres/Day 33.48 37.00
Chocolates 15000 Kgs/Annum 47.68 45.00
Cheese Analogues 1000 Kgs/Day 24.60 126.00
Ice Cream & Ice Candy 1200 Kgs./ Day 41.62 127.00
PRE-COMPRESSED PRESSBOARD 300000 Sq. Mt./Annum 38.00 157.00
Welding Electrode 1.20 MT/Day 30.53 52.00
Carbide Tips Inserts & In... 1000 Nos./Day 39.03 87.00
Welding Electrode 1200 MT/Annum (Welding Rods) 49.00 165.00
Aluminium Containers 96 Containers/Annum 61.33 164.00
LPG Valves 1500 Nos/Day 24.67 129.00
Engine Coolant 200 liters/Day 0.00 16.00
Automotive Carburetors 100 Nos./Day 45.38 70.00
Automobile Workshop 10500 Nos./Annum 39.55 106.00
Activated Alumina 3.0 Ton/Day 80.01 88.00
Candle Making Unit 500 Kgs/Day 58.35 42.00
Tube Making for Umbrella 400 Kgs /Day 45.54 41.00
Piston for Internal Comb... 450 Nos. Two-Wheeler Piston 45.00 200.00
Enameled Copper Wire 500 Kgs/Day 37.43 114.00
Disposable Plastic Syring... 0 0.00 0.00
Thermoforming Plant for M... 32000 Nos/Day 12.40 116.00
Wooden Furniture 20 Pcs/Day 111.00 13.00
Hard Board from Bagasse 5 Ton/Day 70.88 143.00
Wooden Furniture (With Me... 20 Articles/Day 42.81 73.00
Broom Stick Processing P... 10,000 Nos./Day 44.01 56.00
Glass Reinforced Concrete 6000 MT GRC Mix/Annum 39.00 81.00
1234
« Back1 2Next »

Showing 1 - 60 of 117 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR