We can provide you detailed project reports on the following topics. Please select the projects of your interests.
Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.
We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.


We can modify the project capacity and project cost as per your requirement.
We can also prepare project report on any subject as per your requirement.

Add multiple items to inquiry

Select the items and then press Add to inquiry button

Sort by :
Silicon Metal
Silicon Metal

Silicon is the most abundant elemental mineral on earth. Silicone are semi-inorganic polymers that are used in almost every industry as well as in ... Read More

Capacity : 25.00 Ton/Day
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Welding Electrode
Welding Electrode

Welding Electrodes are used in welding various metals in the fabrication of equipment for chemical and allied industries, construction of steel str... Read More

Capacity : 1.20 MT/Day
Plant and Machinery cost: 14.00 Lakhs
Working Capital : 21.00
Rate of Return (ROR):30.53%
Break Even Point (BEP):56.33 %
TCI :52.00 Lakhs
Cost of Project : 52.00Lakhs
Add To Inquiry Basket
Carbide Tips Inserts & Indexiable
Carbide Tips Inserts & Indexiable

Tungsten carbide is a compound of tungsten and carbon. Tungsten as such or tungsten ore is not available in India sufficiently. So it can be import... Read More

Capacity : 1000 Nos./Day
Plant and Machinery cost: 24.00 Lakhs
Working Capital : 24.00
Rate of Return (ROR):39.03%
Break Even Point (BEP):50.93 %
TCI :87.00 Lakhs
Cost of Project : 87.00Lakhs
Add To Inquiry Basket
Welding Electrode
Welding Electrode

Welding Electrodes are used in welding various metals in the fabrication of equipment for chemical and allied industries, construction of steel str... Read More

Capacity : 1200 MT/Annum (Welding Rods)
Plant and Machinery cost: 21.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):49.00%
Break Even Point (BEP):40.00 %
TCI :165.00 Lakhs
Cost of Project : 165.00Lakhs
Add To Inquiry Basket
Steel Re-rolling Mill
Steel Re-rolling Mill

Steel is the generic name for a group of ferrous metals, which due to their abundance, durability, versatility and low cost are the most useful met... Read More

Capacity : 150 Ton/Day
Plant and Machinery cost: 1100.00 Lakhs
Working Capital : 800.00
Rate of Return (ROR):68.83%
Break Even Point (BEP):28.48 %
TCI :2200.00 Lakhs
Cost of Project : 2200.00Lakhs
Add To Inquiry Basket
Aluminium Containers
Aluminium Containers

Cargo containers, an item which is essential for transporting of essential commodities form one country to the other country. Now a days export and... Read More

Capacity : 96 Containers/Annum
Plant and Machinery cost: 47.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):61.33%
Break Even Point (BEP):32.23 %
TCI :164.00 Lakhs
Cost of Project : 164.00Lakhs
Add To Inquiry Basket
Sponge Iron Including Power Plant
Sponge Iron Including Power Plant

Sponge iron is the iron manufactured by refining iron ore. Iron ore is refined by burning off its wastes to a considerable extent. It is used as a ... Read More

Capacity : 450.00 MT/Day
Plant and Machinery cost: 5600.00 Lakhs
Working Capital : 1100.00
Rate of Return (ROR):37.49%
Break Even Point (BEP):49.41 %
TCI :8300.00 Lakhs
Cost of Project : 8300.00Lakhs
Add To Inquiry Basket
Alloy Steel Casting
Alloy Steel Casting

Alloy steel casting has valuable properties like strength, toughness, and resistance to heavy and repeated impact, excellent ductility, resistance ... Read More

Capacity : 2 Ton/ Day
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):48.47%
Break Even Point (BEP):46.94 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Steel Tubes from Scraps and PVC Pipe with 5mw Hr  Captive Power Plant
Steel Tubes from Scraps and PVC Pipe with 5mw Hr Captive Power Plant

Steel Tubes from Scraps and P.V.C. Pipe with 5mw/Hr. Captive Power Plant

Steel tu... Read More

Capacity : 280 MT/ Day Steel Tubes120 MT/ Day PVC Pipes 5MW/Hr. Captive Power Plant
Plant and Machinery cost: 2415.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.27%
Break Even Point (BEP):63.16 %
TCI :4316.00 Lakhs
Cost of Project : 4316.00Lakhs
Add To Inquiry Basket
LPG Valves
LPG Valves

LPG valves are made from brass by forging. The total production of valves has been established 9 million numbers per annum in the country. Against ... Read More

Capacity : 1500 Nos/Day
Plant and Machinery cost: 54.00 Lakhs
Working Capital : 31.00
Rate of Return (ROR):24.67%
Break Even Point (BEP):61.77 %
TCI :129.00 Lakhs
Cost of Project : 129.00Lakhs
Add To Inquiry Basket
Engine Coolant
Engine Coolant

The consumption of coolant is mainly estimated on the basis of automobile industry which has experienced a technological revolution in car manufact... Read More

Capacity : 200 liters/Day
Plant and Machinery cost: 6.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :16.00 Lakhs
Cost of Project : 16.00Lakhs
Add To Inquiry Basket
Hot-Dip Galvanizing
Hot-Dip Galvanizing

Hot-dip galvanizing is usually a process of coating a steel surface with a layer of pure zinc or zinc coating along with a few alloying elements li... Read More

Capacity : 80.0 MT/Day
Plant and Machinery cost: 174.00 Lakhs
Working Capital : 406.00
Rate of Return (ROR):42.82%
Break Even Point (BEP):42.19 %
TCI :632.00 Lakhs
Cost of Project : 632.00Lakhs
Add To Inquiry Basket
Bright Bars
Bright Bars

Bright bars are basic materials used in the manufacture of various engineering product e.g. bolts, nuts, shafts, screw, hand tools, agricultural im... Read More

Capacity : 5.0 Tonnes/Day
Plant and Machinery cost: 49.00 Lakhs
Working Capital : 557.00
Rate of Return (ROR):36.77%
Break Even Point (BEP):42.40 %
TCI :655.00 Lakhs
Cost of Project : 655.00Lakhs
Add To Inquiry Basket
Lead Oxide
Lead Oxide

Native lead is occasionally found in traces but the chief ore is galena usually associated with zinc blend. Lead was known in ancient Egypt and Bab... Read More

Capacity : 11 MT/Day
Plant and Machinery cost: 170.00 Lakhs
Working Capital : 534.00
Rate of Return (ROR):31.59%
Break Even Point (BEP):50.14 %
TCI :950.00 Lakhs
Cost of Project : 950.00Lakhs
Add To Inquiry Basket
Automotive Carburetors
Automotive Carburetors

Carburetors is a device that controls the power output and fuel feed of internal combustion spark-ignition engines generally used for automobiles, ... Read More

Capacity : 100 Nos./Day
Plant and Machinery cost: 29.00 Lakhs
Working Capital : 17.00
Rate of Return (ROR):45.38%
Break Even Point (BEP):38.12 %
TCI :70.00 Lakhs
Cost of Project : 70.00Lakhs
Add To Inquiry Basket
Automobile Workshop
Automobile Workshop

Automobile workshop provide services of preventive maintenance of motor vehicles as well as for repairs and overhauls, Preventive maintenance cuts ... Read More

Capacity : 10500 Nos./Annum
Plant and Machinery cost: 12.00 Lakhs
Working Capital : 15.00
Rate of Return (ROR):39.55%
Break Even Point (BEP):48.38 %
TCI :106.00 Lakhs
Cost of Project : 106.00Lakhs
Add To Inquiry Basket
Activated Alumina
Activated Alumina

Activated alumina is one of the various grades O alumina used extensively as industrial adsorbent because of their properties of large surface area... Read More

Capacity : 3.0 Ton/Day
Plant and Machinery cost: 13.00 Lakhs
Working Capital : 54.00
Rate of Return (ROR):80.01%
Break Even Point (BEP):29.88 %
TCI :88.00 Lakhs
Cost of Project : 88.00Lakhs
Add To Inquiry Basket
Candle Making Unit
Candle Making Unit

Since long people used to burn cotton in mud cups filled with oil. But candle manufacture started during World War-II. The candle is being used in ... Read More

Capacity : 500 Kgs/Day
Plant and Machinery cost: 9.00 Lakhs
Working Capital : 24.00
Rate of Return (ROR):58.35%
Break Even Point (BEP):37.41 %
TCI :42.00 Lakhs
Cost of Project : 42.00Lakhs
Add To Inquiry Basket
Aluminium From Alumina
Aluminium From Alumina

Aluminium is the most abundant metal in the world. It makes up 8% of the solid portion of the earth crust. Every country processes large supplies o... Read More

Capacity : 25000 MT/Annum
Plant and Machinery cost: 729.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):38.18%
Break Even Point (BEP):79.30 %
TCI :2571.00 Lakhs
Cost of Project : 2571.00Lakhs
Add To Inquiry Basket
Fibre Optic Manufacturing
Fibre Optic Manufacturing
There is a huge demand for compact, high quality and high reliability sensors or instrument transformers for measuring currents and voltage in power p... Read More
Capacity : 150 Km/Day
Plant and Machinery cost: 810.00 Lakhs
Working Capital : 10600.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :11582.00 Lakhs
Cost of Project : 11582.00Lakhs
Add To Inquiry Basket
Auto Piston Industry
Auto Piston Industry

The automobile industry in India is at present undergoing considerable expansion and modernization with technology and know-how imported from Japan... Read More

Capacity : 5000 Nos/Day
Plant and Machinery cost: 29.00 Lakhs
Working Capital : 173.00
Rate of Return (ROR):47.96%
Break Even Point (BEP):42.26 %
TCI :274.00 Lakhs
Cost of Project : 274.00Lakhs
Add To Inquiry Basket
U-Bolts and Center Bolts  for Leaf Springs
U-Bolts and Center Bolts for Leaf Springs

Nuts and bolts are the commonest known hardwares used in almost every type of industry. Centre bolt and U-Bolt are mainly employed on leaf springs ... Read More

Capacity : 2 Ton/Day U-Bolts and Nuts 3 Ton/Day Centre bolts & nuts
Plant and Machinery cost: 190.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):22.69%
Break Even Point (BEP):22.69 %
TCI :444.00 Lakhs
Cost of Project : 444.00Lakhs
Add To Inquiry Basket
Synthetic Floating In Fishing Industry
Synthetic Floating In Fishing Industry

Floating agent in the fishing industry has indirect relation. It has very good relation with fisheries. Fisherman has applied it lot for spreading ... Read More

Capacity : 400 Plots/Day
Plant and Machinery cost: 55.00 Lakhs
Working Capital : 166.00
Rate of Return (ROR):40.87%
Break Even Point (BEP):43.20 %
TCI :281.30 Lakhs
Cost of Project : 281.30Lakhs
Add To Inquiry Basket
Hydraulically Regulated Door Closer
Hydraulically Regulated Door Closer

Door closers are very commonly seen in most of the modern residential houses, office building, hospital, hotels & restaurants, Railway station ... Read More

Capacity : 20 Pcs./Day
Plant and Machinery cost: 6.00 Lakhs
Working Capital : 6.00
Rate of Return (ROR):45.07%
Break Even Point (BEP):52.81 %
TCI :322.00 Lakhs
Cost of Project : 322.00Lakhs
Add To Inquiry Basket
Hot Rolled Steel Bar Mill
Hot Rolled Steel Bar Mill

To think of steel , first of all, a rod or a bar comes to the mind of a common man in India. Steel rods are required for making mostly everything o... Read More

Capacity :
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Tube Making for Umbrella
Tube Making for Umbrella

There required large amount of hot rolled or cold rolled coils and strips for manufacturing of steel tubes. One of the major use of this tube is fo... Read More

Capacity : 400 Kgs /Day
Plant and Machinery cost: 7.00 Lakhs
Working Capital : 15.00
Rate of Return (ROR):45.54%
Break Even Point (BEP):47.81 %
TCI :41.00 Lakhs
Cost of Project : 41.00Lakhs
Add To Inquiry Basket
Automobile Piston Rings
Automobile Piston Rings

The piston is a cylindrical part that reciprocates in an engine cylinder. Piston rings provides a seal between the cylinder wall and piston. A good... Read More

Capacity : 4000 Nos. /Day
Plant and Machinery cost: 141.00 Lakhs
Working Capital : 43.00
Rate of Return (ROR):42.37%
Break Even Point (BEP):54.94 %
TCI :249.00 Lakhs
Cost of Project : 249.00Lakhs
Add To Inquiry Basket
Piston for Internal  Combustion Engines
Piston for Internal Combustion Engines
Piston is one of the most important item in the automobile industries. There are mostly disc like structure of the piston. Now a days piston are make ... Read More
Capacity : 450 Nos. Two-Wheeler Piston
Plant and Machinery cost: 24.00 Lakhs
Working Capital : 61.00
Rate of Return (ROR):45.00%
Break Even Point (BEP):72.00 %
TCI :200.00 Lakhs
Cost of Project : 200.00Lakhs
Add To Inquiry Basket
Mini Steel Plant with Production of Construction Bars
Mini Steel Plant with Production of Construction Bars

Modern steels vary greatly in their compositions, mechanical properties and it may be assumed that nearly all steel is produced for the benefit of ... Read More

Capacity : 200 MT/Day
Plant and Machinery cost: 1160.00 Lakhs
Working Capital : 1577.00
Rate of Return (ROR):94.00%
Break Even Point (BEP):40.00 %
TCI :3255.00 Lakhs
Cost of Project : 3255.00Lakhs
Add To Inquiry Basket
Enameled Copper Wire
Enameled Copper Wire

Enameled wire is an insulated wire used in winding of armatures in transformers, switch gears and other electrical equipments. When connected to th... Read More

Capacity : 500 Kgs/Day
Plant and Machinery cost: 22.00 Lakhs
Working Capital : 52.00
Rate of Return (ROR):37.43%
Break Even Point (BEP):46.95 %
TCI :114.00 Lakhs
Cost of Project : 114.00Lakhs
Add To Inquiry Basket
Hydraulic Hoses and Clamping
Hydraulic Hoses and Clamping

Hydraulic hoses are mostly used in the supplying of water in the field of agriculture and fire brigade etc. Basic raw materials, which needed to ma... Read More

Capacity : 198 Meters/day (hose pf I.D. =10 mm)
Plant and Machinery cost: 34.00 Lakhs
Working Capital : 29.00
Rate of Return (ROR):44.50%
Break Even Point (BEP):64.60 %
TCI :1.00 Lakhs
Cost of Project : 1.00Lakhs
Add To Inquiry Basket
Particle Board
Particle Board

Particle boards are substitute of solid wood and plywood. Due to the growing deforestation, the natural wood is becoming more and more scare. Parti... Read More

Capacity : 160 Nos./ Day
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):52.89%
Break Even Point (BEP):49.59 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Granite Tiles, Slab and Monuments
Granite Tiles, Slab and Monuments

Granite Slab and Tiles are mainly used for wall paneling and facades. Today in Europe and in Western Countries and in India, architect and builders... Read More

Capacity : 1000.00 Tiles/Day & 100 Monument/Day, 5 Slab/Day
Plant and Machinery cost: 182.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):45.00 %
TCI :488.00 Lakhs
Cost of Project : 488.00Lakhs
Add To Inquiry Basket
Hydraulic Hoses for Heavy Earth Movers
Hydraulic Hoses for Heavy Earth Movers

Hydraulic hoses are largely used in the supplying of water from one place to another place, in the agriculture in the fire brigade, in the civil co... Read More

Capacity : 150000 Meter/ Annum
Plant and Machinery cost: 19.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):37.92%
Break Even Point (BEP):55.32 %
TCI :54.00 Lakhs
Cost of Project : 54.00Lakhs
Add To Inquiry Basket
Seamless M S Tubes & Pipes
Seamless M S Tubes & Pipes

Seamless M. S. Tubes & Pipes

Seamless M. S. pipes and tubes products may be mad... Read More

Capacity : 800 Kg/Day
Plant and Machinery cost: 8.00 Lakhs
Working Capital : 24.00
Rate of Return (ROR):21.00%
Break Even Point (BEP):50.00 %
TCI :56.00 Lakhs
Cost of Project : 56.00Lakhs
Add To Inquiry Basket
Automobile Filter
Automobile Filter

-

Read More
Capacity :
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):0.00%
Break Even Point (BEP):0.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Brake Lining
Brake Lining
Read More
Capacity : 1000 No./DAY
Plant and Machinery cost: 5.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):53.00%
Break Even Point (BEP):49.00 %
TCI :40.00 Lakhs
Cost of Project : 40.00Lakhs
Add To Inquiry Basket
Clutch plate for four wheelers
Clutch plate for four wheelers
Read More
Capacity : 600 No./DAY
Plant and Machinery cost: 12.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):49.00%
Break Even Point (BEP):42.00 %
TCI :56.00 Lakhs
Cost of Project : 56.00Lakhs
Add To Inquiry Basket
Induction Furnace Plant
Induction Furnace Plant
Read More
Capacity : 120 MT/day
Plant and Machinery cost: 382.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):48.00%
Break Even Point (BEP):43.00 %
TCI :1918.00 Lakhs
Cost of Project : 1918.00Lakhs
Add To Inquiry Basket
Pig Iron Plant
Pig Iron Plant

Pig Iron is a raw material for all the iron and steel based industries and hence, required to be responsive to the requirements of pig iron users. ... Read More

Capacity : 100 MT/Day
Plant and Machinery cost: 520.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):59.00%
Break Even Point (BEP):37.00 %
TCI :1524.00 Lakhs
Cost of Project : 1524.00Lakhs
Add To Inquiry Basket
Piston for Internal Combustion Engines
Piston for Internal Combustion Engines

Piston is one of the most important item in the automobile industries. There are mostly disc like structure of the piston. Now a days piston are ma... Read More

Capacity : 450 Nos. Two-Wheeler Piston
Plant and Machinery cost: 24.00 Lakhs
Working Capital : 61.00
Rate of Return (ROR):45.00%
Break Even Point (BEP):72.00 %
TCI :200.00 Lakhs
Cost of Project : 200.00Lakhs
Add To Inquiry Basket
Steel Structural
Steel Structural

The importance of iron and steel among other materials is well known for industrialization and national economy. Basically all industries depend on... Read More

Capacity : 1.67 MT/day
Plant and Machinery cost: 47.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):24.00%
Break Even Point (BEP):60.00 %
TCI :142.00 Lakhs
Cost of Project : 142.00Lakhs
Add To Inquiry Basket
SPONGE IRON
SPONGE IRON

Steel is produced through two process routes; the ore based Blast Furnace-LD Converter route or scrap or DRI based electric arc furnace route. The ... Read More

Capacity : 50 MT/Day
Plant and Machinery cost: 1200.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.00%
Break Even Point (BEP):45.00 %
TCI :1800.00 Lakhs
Cost of Project : 1800.00Lakhs
Add To Inquiry Basket
Hot Dip Galvanizing Plant
Hot Dip Galvanizing Plant

Hot dip galvanizing is a process in which an adherent, protective coating of zinc compounds is developed on the surface of iron and steel products ... Read More

Capacity : 12 MT/Day
Plant and Machinery cost: 176.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):53.00%
Break Even Point (BEP):48.00 %
TCI :859.00 Lakhs
Cost of Project : 859.00Lakhs
Add To Inquiry Basket
Steel Rolling Mill
Steel Rolling Mill

The chief departments of a metallurgical plant operating on a complete are to finished product cycle are that operating on a complete are to finish... Read More

Capacity : 200.00 MT/Day
Plant and Machinery cost: 275.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):61.00%
Break Even Point (BEP):26.00 %
TCI :3897.00 Lakhs
Cost of Project : 3897.00Lakhs
Add To Inquiry Basket
High Mast Poles
High Mast Poles

High mast poles are newly ventured high pillars for using high mast lighting, flood lighting, sports lighting, traffic signals, street lighting etc... Read More

Capacity : 9000 Nos./ANNUM
Plant and Machinery cost: 206.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):71.00 %
TCI :484.00 Lakhs
Cost of Project : 484.00Lakhs
Add To Inquiry Basket
Tyre Retreading And Repairing Facility For Heavy Vehicles
Tyre Retreading And Repairing Facility For Heavy Vehicles

Automobile tyres are quite costly in India, and are manufactured only by big manufacturers. Retreading is replacement of worn, cut or loose treads ... Read More

Capacity : 100 Tyres Retreads/Day & 2Nos. Heavy Vehicles Repairing/Day
Plant and Machinery cost: 25.00 Lakhs
Working Capital : 18.00
Rate of Return (ROR):89.00%
Break Even Point (BEP):28.00 %
TCI :71.00 Lakhs
Cost of Project : 71.00Lakhs
Add To Inquiry Basket
Ferrochrome Alloy
Ferrochrome Alloy

In the manufacture of steel, chromium is added usually in the form of ferro chrome. Pure chromium metal, produced by electrolytic or aluminothermic... Read More

Capacity : 0
Plant and Machinery cost: 2998.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):34.00%
Break Even Point (BEP):76.00 %
TCI :4490.00 Lakhs
Cost of Project : 4490.00Lakhs
Add To Inquiry Basket
Automobile Workshop, Garage and Service Centre
Automobile Workshop, Garage and Service Centre

A limited nos. of manufacturers of various types of automobiles vehicles in India. More & more enterprises are coming up with something designs... Read More

Capacity :
Plant and Machinery cost: 0.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):50.00%
Break Even Point (BEP):36.00 %
TCI :0.00 Lakhs
Cost of Project : 0.00Lakhs
Add To Inquiry Basket
Hot Rolled Plate Mill
Hot Rolled Plate Mill

To think of steel first of all a rod or a bar as you may call it comes to the mind of a common man in India. Steel rods are required even for makin... Read More

Capacity : 500 MT/Day
Plant and Machinery cost: 3900.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.00%
Break Even Point (BEP):44.00 %
TCI :14500.00 Lakhs
Cost of Project : 14500.00Lakhs
Add To Inquiry Basket
Tractor Manufacturing
Tractor Manufacturing

Tractor is one of the most important farming machine. We can say that tractor is the forehand of the farming industry. This is the blessing of god ... Read More

Capacity : 10 Nos/Day
Plant and Machinery cost: 91.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):79.00%
Break Even Point (BEP):18.00 %
TCI :1735.00 Lakhs
Cost of Project : 1735.00Lakhs
Add To Inquiry Basket
Prestressed Concrete Sleepers
Prestressed Concrete Sleepers

Prestressing is the process of applying a load to a structure deforming, so that it will withstand a work load more effectively or deflect less. Pr... Read More

Capacity : 500 Nos./Day
Plant and Machinery cost: 144.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):56.00%
Break Even Point (BEP):37.00 %
TCI :514.00 Lakhs
Cost of Project : 514.00Lakhs
Add To Inquiry Basket
Anodic Aluminium Labels
Anodic Aluminium Labels

Anodic Aluminium Labels used as an industrial, metallic labels and are widely used on industrial machinery and domestic appliances for supplying th... Read More

Capacity : 1 MT/Day
Plant and Machinery cost: 13.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):46.00%
Break Even Point (BEP):34.00 %
TCI :132.00 Lakhs
Cost of Project : 132.00Lakhs
Add To Inquiry Basket
Clutch Lining For Four Wheelers
Clutch Lining For Four Wheelers

The leather lining applied to the male of female cones of friction clutches to provide a higher friction than that of metallic surfaces. An automob... Read More

Capacity : 6000 Nos./Day
Plant and Machinery cost: 21.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):58.00%
Break Even Point (BEP):40.00 %
TCI :85.00 Lakhs
Cost of Project : 85.00Lakhs
Add To Inquiry Basket
Aluminium From Bauxite of Gibbsite Variety
Aluminium From Bauxite of Gibbsite Variety

Residual rocks, in which the alumina trihydrate and monohydrate minerals gibbsite, boehmite, and diaspore predominate are classified as bauxite. Ot... Read More

Capacity : 20000 MT/Annum
Plant and Machinery cost: 615.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):17.00%
Break Even Point (BEP):54.00 %
TCI :1875.00 Lakhs
Cost of Project : 1875.00Lakhs
Add To Inquiry Basket
Calcined Bauxite
Calcined Bauxite

The industry grow steadily based soundly on new and expanding markets created largely by its own study of the properties of aluminium and of the av... Read More

Capacity : 20000 MT/Annum
Plant and Machinery cost: 615.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):22.00%
Break Even Point (BEP):61.00 %
TCI :1898.00 Lakhs
Cost of Project : 1898.00Lakhs
Add To Inquiry Basket
Coal Mining
Coal Mining

Coal is an extremely heterogeneous, complex material that is difficult to characterize. Coal is a rock formed by geological process and is composed... Read More

Capacity : 1350 Lakh MT/Annum (Job Work)
Plant and Machinery cost: 75200.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):41.00%
Break Even Point (BEP):42.00 %
TCI :97200.00 Lakhs
Cost of Project : 97200.00Lakhs
Add To Inquiry Basket
Iron Ore Mining
Iron Ore Mining

Iron is an Anglo-Saxon Word : the symbol Fe, comes from latin ferrum. The use of iron has been known since the earliest times; it was prepared by t... Read More

Capacity : 139 Lakh MT/Annum
Plant and Machinery cost: 1030.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):37.00%
Break Even Point (BEP):38.00 %
TCI :1163.00 Lakhs
Cost of Project : 1163.00Lakhs
Add To Inquiry Basket
Aluminum Gravity Casting
Aluminum Gravity Casting

Gravity casting which is in fact is a permanent mould casting in which the molten metal is poured under the force of gravity into the permanent mou... Read More

Capacity : 300.00 Kgs/day
Plant and Machinery cost: 10.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):44.00%
Break Even Point (BEP):46.00 %
TCI :65.00 Lakhs
Cost of Project : 65.00Lakhs
Add To Inquiry Basket
Pig Iron
Pig Iron

Pig Iron is a raw material for all the iron and steel based industries and hence, required to be responsive to the requirements of pig iron users. ... Read More

Capacity : 10 Lakh MT/Month
Plant and Machinery cost: 3800.00 Lakhs
Working Capital : 0.00
Rate of Return (ROR):49.00%
Break Even Point (BEP):29.00 %
TCI :38800.00 Lakhs
Cost of Project : 38800.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Silicon Metal 25.00 Ton/Day 0.00 0.00
Welding Electrode 1.20 MT/Day 30.53 52.00
Carbide Tips Inserts & In... 1000 Nos./Day 39.03 87.00
Welding Electrode 1200 MT/Annum (Welding Rods) 49.00 165.00
Steel Re-rolling Mill 150 Ton/Day 68.83 2200.00
Aluminium Containers 96 Containers/Annum 61.33 164.00
Sponge Iron Including Pow... 450.00 MT/Day 37.49 8300.00
Alloy Steel Casting 2 Ton/ Day 48.47 0.00
Steel Tubes from Scraps a... 280 MT/ Day Steel Tubes120 MT/ Day PVC Pipes 5MW/Hr. Captive Power Plant 41.27 4316.00
LPG Valves 1500 Nos/Day 24.67 129.00
Engine Coolant 200 liters/Day 0.00 16.00
Hot-Dip Galvanizing 80.0 MT/Day 42.82 632.00
Bright Bars 5.0 Tonnes/Day 36.77 655.00
Lead Oxide 11 MT/Day 31.59 950.00
Automotive Carburetors 100 Nos./Day 45.38 70.00
Automobile Workshop 10500 Nos./Annum 39.55 106.00
Activated Alumina 3.0 Ton/Day 80.01 88.00
Candle Making Unit 500 Kgs/Day 58.35 42.00
Aluminium From Alumina 25000 MT/Annum 38.18 2571.00
Fibre Optic Manufacturing 150 Km/Day 0.00 11582.00
Auto Piston Industry 5000 Nos/Day 47.96 274.00
U-Bolts and Center Bolts ... 2 Ton/Day U-Bolts and Nuts 3 Ton/Day Centre bolts & nuts 22.69 444.00
Synthetic Floating In Fis... 400 Plots/Day 40.87 281.30
Hydraulically Regulated D... 20 Pcs./Day 45.07 322.00
Hot Rolled Steel Bar Mill 0.00 0.00
Tube Making for Umbrella 400 Kgs /Day 45.54 41.00
Automobile Piston Rings 4000 Nos. /Day 42.37 249.00
Piston for Internal Comb... 450 Nos. Two-Wheeler Piston 45.00 200.00
Mini Steel Plant with Pro... 200 MT/Day 94.00 3255.00
Enameled Copper Wire 500 Kgs/Day 37.43 114.00
12345678910...
« Back1 2 3 4 5Next »

Showing 1 - 60 of 347 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

ABOUT NPCS

 

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report,  Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

 


And before diversifying/venturing into any product, wish to study the following aspects of the identified product:


• Good Present/Future Demand
• Export-Import Market Potential
• Raw Material & Manpower Availability
• Project Costs and Payback Period


We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

 

The report contains all the data which will help an entrepreneur find answers to questions like:

• Why I should invest in this project?
• What will drive the growth of the product?
• What are the costs involved?
• What will be the market potential?


The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product.

The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.


Reasons for buying the report:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.

• This report provides vital information on the product like its definition, characteristics and segmentation.

• This report helps you market and place the product correctly by identifying the target customer group of the product.

• This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.

 

Our Approach:


• Our research reports broadly cover Indian markets, present analysis, outlook and forecast.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players. 

• We use reliable sources of information and databases.  And information from such sources is processed by us and included in the report.

 

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

 

 

Ø  Introduction

·         Project Introduction

·         Project Objective and Strategy

·         Concise History of the Product

·         Properties

·         BIS (Bureau of Indian Standards) Provision & Specification

·         Uses & Applications

 

Ø  Market Study and Assessment

·         Current Indian Market Scenario

·         Present Market Demand and Supply

·         Estimated Future Market Demand and Forecast

·         Statistics of Import & Export

·         Names & Addresses of Existing Units (Present Players)

·         Market Opportunity

 

Ø  Raw Material

·         List of Raw Materials

·         Properties of Raw Materials

·         Prescribed Quality of Raw Materials

·         List of Suppliers and Manufacturers

 

Ø  Personnel (Manpower) Requirements

·         Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel

 

Ø  Plant and Machinery

·         List of Plant & Machinery

·         Miscellaneous Items

·         Appliances & Equipments

·         Laboratory Equipments & Accessories

·         Electrification

·         Electric Load & Water

·         Maintenance Cost

·         Sources of Plant & Machinery (Suppliers and Manufacturers)

 

Ø  Manufacturing Process and Formulations

·         Detailed Process of Manufacture with Formulation

·         Packaging Required

·         Process Flow Sheet Diagram

 

Ø  Infrastructure and Utilities

·         Project Location

·         Requirement of Land Area

·         Rates of the Land

·         Built Up Area

·         Construction Schedule

·         Plant Layout and Requirement of Utilities

 

Project at a Glance

Along with financial details as under:

 

  •     Assumptions for Profitability workings

  •    Plant Economics

  •    Production Schedule

  •    Land & Building

            Factory Land & Building

            Site Development Expenses

  •    Plant & Machinery

             Indigenous Machineries

            Other Machineries (Miscellaneous, Laboratory etc.)

  •    Other Fixed Assets

            Furniture & Fixtures

            Pre-operative and Preliminary Expenses

            Technical Knowhow

            Provision of Contingencies

  •   Working Capital Requirement Per Month

             Raw Material

            Packing Material

            Lab & ETP Chemical Cost

           Consumable Store

  •   Overheads Required Per Month And Per Annum

         Utilities & Overheads (Power, Water and Fuel Expenses etc.)

             Royalty and Other Charges

            Selling and Distribution Expenses

  •    Salary and Wages

  •    Turnover Per Annum

  •   Share Capital

            Equity Capital

            Preference Share Capital

 

  •    Annexure 1:: Cost of Project and Means of Finance

  •    Annexure 2::  Profitability and Net Cash Accruals

                Revenue/Income/Realisation

                Expenses/Cost of Products/Services/Items

                Gross Profit

                Financial Charges     

                Total Cost of Sales

                Net Profit After Taxes

                Net Cash Accruals

  •   Annexure 3 :: Assessment of Working Capital requirements

                Current Assets

                Gross Working. Capital

                Current Liabilities

                Net Working Capital

                Working Note for Calculation of Work-in-process

  •    Annexure 4 :: Sources and Disposition of Funds

  •    Annexure 5 :: Projected Balance Sheets

                ROI (Average of Fixed Assets)

                RONW (Average of Share Capital)

                ROI (Average of Total Assets)

  •    Annexure 6 :: Profitability ratios

                D.S.C.R

                Earnings Per Share (EPS)

               

             Debt Equity Ratio

        Annexure 7   :: Break-Even Analysis

                Variable Cost & Expenses

                Semi-Var./Semi-Fixed Exp.

                Profit Volume Ratio (PVR)

                Fixed Expenses / Cost 

                B.E.P

  •   Annexure 8 to 11:: Sensitivity Analysis-Price/Volume

            Resultant N.P.B.T

            Resultant D.S.C.R

   Resultant PV Ratio

   Resultant DER

  Resultant ROI

          Resultant BEP

  •    Annexure 12 :: Shareholding Pattern and Stake Status

        Equity Capital

        Preference Share Capital

  •   Annexure 13 :: Quantitative Details-Output/Sales/Stocks

        Determined Capacity P.A of Products/Services

        Achievable Efficiency/Yield % of Products/Services/Items 

        Net Usable Load/Capacity of Products/Services/Items   

       Expected Sales/ Revenue/ Income of Products/ Services/ Items   

  •    Annexure 14 :: Product wise domestic Sales Realisation

  •    Annexure 15 :: Total Raw Material Cost

  •    Annexure 16 :: Raw Material Cost per unit

  •    Annexure 17 :: Total Lab & ETP Chemical Cost

  •    Annexure 18  :: Consumables, Store etc.,

  •    Annexure 19  :: Packing Material Cost

  •    Annexure 20  :: Packing Material Cost Per Unit

  •    Annexure 21 :: Employees Expenses

  •    Annexure 22 :: Fuel Expenses

  •    Annexure 23 :: Power/Electricity Expenses

  •    Annexure 24 :: Royalty & Other Charges

  •    Annexure 25 :: Repairs & Maintenance Exp.

  •    Annexure 26 :: Other Mfg. Expenses

  •    Annexure 27 :: Administration Expenses

  •    Annexure 28 :: Selling Expenses

  •    Annexure 29 :: Depreciation Charges – as per Books (Total)

  •   Annexure 30   :: Depreciation Charges – as per Books (P & M)

  •   Annexure 31   :: Depreciation Charges - As per IT Act WDV (Total)

  •   Annexure 32   :: Depreciation Charges - As per IT Act WDV (P & M)

  •   Annexure 33   :: Interest and Repayment - Term Loans

  •   Annexure 34   :: Tax on Profits

  •   Annexure 35   ::Projected Pay-Back Period And IRR